Contractor dossier
55 projects on file, including joint ventures this contractor is part of.
Total projects
55
Total budget
₱2.8B
Average progress
91.5%
Completion rate
72.7%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
9
16.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 51 | ₱2.6B | 54.9 | 9 | 90.8% |
| Region II | 3 | ₱102.9M | 44.4 | 0 | 100.0% |
| Region I | 1 | ₱99.6M | 60.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 25 | ₱654.4M | 48.3 | 0 | 99.8% |
| Bridges | 12 | ₱1.2B | 60.7 | 6 | 70.5% |
| Flood Control and Drainage | 9 | ₱465.7M | 49.7 | 0 | 99.3% |
| OTHER | 6 | ₱327.8M | 76.3 | 3 | 82.8% |
| Buildings and Facilities | 3 | ₱115M | 51.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PM0058BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 2STY4CL, STA. ISABEL NATIONAL HIGH SCHOOL, NATONIN, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱30.3M | 97% | High risk87 | Flagged0.051 |
| 24PA0076CONSTRUCTION OF LANGIDEN BRIDGE, PHASE 4, SUYO & NALNAS-DALAYAP, LANGIDEN & PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱148.5M | 100% | High risk77 | Flagged0.002 |
| 21PI0042CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SAGADA - BESAO - QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk74 | —-0.023 |
| 22PI0042CONSTRUCTION OF MISSING LINKS / NEW ROADS, SAGADA - BESAO - QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk74 | —-0.023 |
| 17PI0039RD UPGRADING BASED ON GRAVEL RD STRATEGIES (HDM-4 PROJ ANALYSIS), SEC RDS, MP-CAGAYAN VIA TABUK-ENRILE RD | Cordillera Administrative Region | Mountain Province 1st DEO | Terminated | ₱21.5M | 0% | High risk74 | Flagged0.027 |
| 24PI0020CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAGADA-BESAO-QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱29.4M | 100% | High risk73 | —-0.025 |
| 24PA0180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.8M | 41% | High risk69 | Flagged0.015 |
| 24PA0181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 18% | High risk69 | Flagged0.024 |
| 24PA0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.9M | 45% | High risk69 | Flagged0.013 |
| 24PA0172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.4M | 22% | High risk68 | Flagged0.021 |
| 24PA0137CONSTRUCTION OF CANAN BRIDGE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱140.2M | 90% | High risk68 | Flagged0.006 |
| 24PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF OTIP BRIDGE, TUBO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 79% | High risk65 | Flagged0.005 |
| 17PI0037ASSET PRESRV OF NATL RDS-REHAB/RECON/UPGRAD OF DAMAGED PAVED NATL RDS...BAG-BONTOC RD K0342+(-799)... | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱76.9M | 100% | High risk63 | —-0.048 |
| 17PM0027NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS, TERTIARY ROADS JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD (S03997LZ) K0421+444 - K0423+486 | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.029 |
| 24PM0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF LIAS FLOOD CONTROL STRUCTURE (SECTION 1L), STA. 055+825 | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.056 |
| 17PI0087ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, BAGUIO-BONTOC ROAD - K0351+632-K0351+800, K0352+000-K0351+078, K0362+940-K0363+012, K0367+000-K0367+141 | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱21.5M | 100% | High risk62 | —-0.053 |
| 24A00489CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG RIBSUAN RIVER, BARANGAY CAOAYAN, BURGOS, LA UNION | Region I | Region I | Completed | ₱99.6M | 100% | High risk61 | —-0.055 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PM0058BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 2STY4CL, STA. ISABEL NATIONAL HIGH SCHOOL, NATONIN, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱30.3M | 97% | High risk87 | Flagged0.051 |
| 17PI0039RD UPGRADING BASED ON GRAVEL RD STRATEGIES (HDM-4 PROJ ANALYSIS), SEC RDS, MP-CAGAYAN VIA TABUK-ENRILE RD | Cordillera Administrative Region | Mountain Province 1st DEO | Terminated | ₱21.5M | 0% | High risk74 | Flagged0.027 |
| 24PA0181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 18% | High risk69 | Flagged0.024 |
| 24PA0172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.4M | 22% | High risk68 | Flagged0.021 |
| 24PA0180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.8M | 41% | High risk69 | Flagged0.015 |
| 24PA0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.9M | 45% | High risk69 | Flagged0.013 |
| 24PA0137CONSTRUCTION OF CANAN BRIDGE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱140.2M | 90% | High risk68 | Flagged0.006 |
| 24PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF OTIP BRIDGE, TUBO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 79% | High risk65 | Flagged0.005 |
| 24PA0076CONSTRUCTION OF LANGIDEN BRIDGE, PHASE 4, SUYO & NALNAS-DALAYAP, LANGIDEN & PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱148.5M | 100% | High risk77 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24PM0058BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 2STY4CL, STA. ISABEL NATIONAL HIGH SCHOOL, NATONIN, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱30.3M | 97% | High risk87 | Flagged0.051 |
| 2 | 24PA0076CONSTRUCTION OF LANGIDEN BRIDGE, PHASE 4, SUYO & NALNAS-DALAYAP, LANGIDEN & PIDIGAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱148.5M | 100% | High risk77 | Flagged0.002 |
| 3 | 21PI0042CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SAGADA - BESAO - QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk74 | —-0.023 |
| 4 | 22PI0042CONSTRUCTION OF MISSING LINKS / NEW ROADS, SAGADA - BESAO - QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱49M | 100% | High risk74 | —-0.023 |
| 5 | 17PI0039RD UPGRADING BASED ON GRAVEL RD STRATEGIES (HDM-4 PROJ ANALYSIS), SEC RDS, MP-CAGAYAN VIA TABUK-ENRILE RD | Cordillera Administrative Region | Mountain Province 1st DEO | Terminated | ₱21.5M | 0% | High risk74 | Flagged0.027 |
| 6 | 24PI0020CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAGADA-BESAO-QUIRINO (VIA LAYLAYA) ROAD, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱29.4M | 100% | High risk73 | —-0.025 |
| 7 | 24PA0180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.8M | 41% | High risk69 | Flagged0.015 |
| 8 | 24PA0181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.5M | 18% | High risk69 | Flagged0.024 |
| 9 | 24PA0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱139.9M | 45% | High risk69 | Flagged0.013 |
| 10 | 24PA0172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱137.4M | 22% | High risk68 | Flagged0.021 |
| 11 | 24PA0137CONSTRUCTION OF CANAN BRIDGE, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱140.2M | 90% | High risk68 | Flagged0.006 |
| 12 | 24PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF OTIP BRIDGE, TUBO, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱138.1M | 79% | High risk65 | Flagged0.005 |
| 13 | 17PI0037ASSET PRESRV OF NATL RDS-REHAB/RECON/UPGRAD OF DAMAGED PAVED NATL RDS...BAG-BONTOC RD K0342+(-799)... | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱76.9M | 100% | High risk63 | —-0.048 |
| 14 | 17PM0027NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS, TERTIARY ROADS JCT. TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD (S03997LZ) K0421+444 - K0423+486 | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.029 |
| 15 | 24PM0029ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF LIAS FLOOD CONTROL STRUCTURE (SECTION 1L), STA. 055+825 | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.056 |
| 16 | 17PI0087ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, BAGUIO-BONTOC ROAD - K0351+632-K0351+800, K0352+000-K0351+078, K0362+940-K0363+012, K0367+000-K0367+141 | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱21.5M | 100% | High risk62 | —-0.053 |
| 17 | 24A00489CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG RIBSUAN RIVER, BARANGAY CAOAYAN, BURGOS, LA UNION | Region I | Region I | Completed | ₱99.6M | 100% | High risk61 | —-0.055 |
| 18 | 17PI0048ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SECONDARY ROADS, BAGUIO-BONTOC RD.-K0390+644- | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱25.6M | 100% | Medium risk60 | —-0.051 |
| 19 | 17PI0095CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION, SAGADA-AGUID ROAD IN SUPPORT OF COFFEE WEAVING, FOOD PROCESSING AND TOURISM INDUSTRIES, SAGADA, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱23.8M | 100% | Medium risk60 | —-0.051 |
| 20 | 17PI0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS; BALILI-SUYO-SAGADA ROAD LEADING TO SAGADA CAVES, BURIAL CAVES, RICE TERRACES AND WATERFALLS, BONTOC AND SAGADA, MT. PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱19M | 100% | Medium risk60 | —-0.049 |
| 21 | 17PI0092NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAGADA-BESAO-QUIRINO 9VIA LAYLAYA) ROAD - MT. PROVINCE SIDE, MT. PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱19M | 100% | Medium risk60 | —-0.049 |
| 22 | 24PA0135CONSTRUCTION OF MALANAS BRIDGE, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱74.5M | 100% | Medium risk57 | —-0.016 |
| 23 | 21P00058ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - MT. PROVINCE - ILOCOS SUR VIA TUE ROAD, KO389+38 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | Medium risk56 | —-0.077 |
| 24 | 24PA0129ASSET PRESERVATION - CONSTRUCTION OF MISSING LINKS / NEW ROADS, ABRA-CERVANTES ROAD, PACKAGE 2, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱73.3M | 71% | Medium risk54 | —-0.007 |
| 25 | 22PI0098CONSTRUCTION OF BETWAGAM BRIDGE, SADANGA, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.042 |