Opening the dossier…
Opening the dossier…
Contractor dossier
17 projects on file, including joint ventures this contractor is part of.
Total projects
17
Total budget
₱1.3B
Average progress
56.3%
Completion rate
5.9%
Below 70%
Average risk score
63.8
High risk on average, out of 100
Flagged as unusual
4
23.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 15 | ₱679.2M | 63.2 | 2 | 58.3% |
| Region VIII | 1 | ₱313M | 68.3 | 1 | 0.1% |
| Region IV-B | 1 | ₱279.4M | 68.2 | 1 | 81.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Water Provision and Storage | 8 | ₱72M | 59.7 | 0 | 41.8% |
| Roads | 5 | ₱312.5M | 64.2 | 1 | 68.6% |
| Flood Control and Drainage | 4 | ₱887.1M | 71.5 | 3 | 69.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FN0105CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD DIKE LEADING ALONG BUHI LAKE BARANGAY IGBAC, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱168.9M | 100% | High risk79 | Flagged0.027 |
| 24F00079CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF NAMANTAO-MAPULANG DAGA R | Region V | Region V | On-Going | ₱146.4M | 17% | High risk72 | —-0.023 |
| 24FB0215OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SHORE PROTECTION AT BILBAO, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱125.8M | 97% | High risk71 | —-0.037 |
| 23FA0063CONSTRUCTION OF CAGBULAO TO TANAGAN RIDGE ROAD, BACACAY, ALBAY (PHASE 2) | Region V | Albay 1st DEO | Completed | ₱99M | 100% | High risk69 | —-0.089 |
| 25I00125SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | On-Going | ₱313M | 0% | High risk68 | Flagged0.017 |
| 24E00041SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱279.4M | 82% | High risk68 | Flagged0.004 |
| 24FB0234CONCRETING OF BRGY. HAMORAWON FMR, BRGY. HAMORAWON, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.7M | 53% | High risk63 | Flagged0.006 |
| 24FB0235CONCRETING OF BRGY. DAPDAP FMR, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.7M | 74% | High risk62 | —-0.001 |
| 23F00310CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF JOVELLAR, ALBAY, SALVACION, JOVELLAR, ALBAY (3RD LEGISLATIVE | Region V | Region V | On-Going | ₱4.8M | 34% | High risk61 | —-0.008 |
| 23F00306CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II,IN THE MUNICIPALITY OF GUINOBATAN, ALBAY, SAN JOSE, MALIPO AND SAN FRANCISCO | Region V | Region V | On-Going | ₱14.4M | 67% | High risk61 | —-0.017 |
| 24FB0149BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.6M | 79% | High risk60 | —-0.029 |
| 23F00312CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II,BRGY. BASICAO COASTAL, PIO DURAN, ALBAY, BASICAO COASTAL, PIO DURAN, ALBAY (3RD LEGI | Region V | Region V | On-Going | ₱4.8M | 2% | High risk60 | —-0.001 |
| 23F00307CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF OAS, ALBAY, SAN MIGUEL, CAMAGONG, BANAO AND TOBGON,O | Region V | Region V | On-Going | ₱19.2M | 39% | High risk60 | —-0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FN0105CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD DIKE LEADING ALONG BUHI LAKE BARANGAY IGBAC, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱168.9M | 100% | High risk79 | Flagged0.027 |
| 25I00125SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | On-Going | ₱313M | 0% | High risk68 | Flagged0.017 |
| 24FB0234CONCRETING OF BRGY. HAMORAWON FMR, BRGY. HAMORAWON, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.7M | 53% | High risk63 | Flagged0.006 |
| 24E00041SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱279.4M | 82% | High risk68 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23FN0105CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD DIKE LEADING ALONG BUHI LAKE BARANGAY IGBAC, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | On-Going | ₱168.9M | 100% | High risk79 | Flagged0.027 |
| 2 | 24F00079CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF NAMANTAO-MAPULANG DAGA R | Region V | Region V | On-Going | ₱146.4M | 17% | High risk72 | —-0.023 |
| 3 | 24FB0215OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SHORE PROTECTION AT BILBAO, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱125.8M | 97% | High risk71 | —-0.037 |
| 4 | 23FA0063CONSTRUCTION OF CAGBULAO TO TANAGAN RIDGE ROAD, BACACAY, ALBAY (PHASE 2) | Region V | Albay 1st DEO | Completed | ₱99M | 100% | High risk69 | —-0.089 |
| 5 | 25I00125SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | On-Going | ₱313M | 0% | High risk68 | Flagged0.017 |
| 6 | 24E00041SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱279.4M | 82% | High risk68 | Flagged0.004 |
| 7 | 24FB0234CONCRETING OF BRGY. HAMORAWON FMR, BRGY. HAMORAWON, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.7M | 53% | High risk63 | Flagged0.006 |
| 8 | 24FB0235CONCRETING OF BRGY. DAPDAP FMR, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱28.7M | 74% | High risk62 | —-0.001 |
| 9 | 23F00310CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF JOVELLAR, ALBAY, SALVACION, JOVELLAR, ALBAY (3RD LEGISLATIVE | Region V | Region V | On-Going | ₱4.8M | 34% | High risk61 | —-0.008 |
| 10 | 23F00306CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II,IN THE MUNICIPALITY OF GUINOBATAN, ALBAY, SAN JOSE, MALIPO AND SAN FRANCISCO | Region V | Region V | On-Going | ₱14.4M | 67% | High risk61 | —-0.017 |
| 11 | 24FB0149BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.6M | 79% | High risk60 | —-0.029 |
| 12 | 23F00312CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II,BRGY. BASICAO COASTAL, PIO DURAN, ALBAY, BASICAO COASTAL, PIO DURAN, ALBAY (3RD LEGI | Region V | Region V | On-Going | ₱4.8M | 2% | High risk60 | —-0.001 |
| 13 | 23F00307CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF OAS, ALBAY, SAN MIGUEL, CAMAGONG, BANAO AND TOBGON,O | Region V | Region V | On-Going | ₱19.2M | 39% | High risk60 | —-0.010 |
| 14 | 23F00238CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II AT BRGY. BACOLOD, MAGALLANES. SORSOGON | Region V | Region V | On-Going | ₱4.8M | 45% | Medium risk59 | —-0.011 |
| 15 | 23F00311CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, BRGY. SAN AGUSTIN, LIBON, ALBAY, LIBON, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱4.8M | 33% | Medium risk59 | —-0.007 |
| 16 | 23F00308CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III)-CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II, IN THE MUNICIPALITY OF POLANGUI, ALBAY, BALANGIBANG AND MATACON, POLANGUI, | Region V | Region V | On-Going | ₱9.6M | 36% | Medium risk58 | —-0.010 |
| 17 | 24FB0233CONCRETING OF BRGY. BUHATAN FMR, BRGY. BUHATAN, RAPU-RAPU, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱9.6M | 99% | Medium risk55 | —-0.013 |