Contractor dossier
136 projects on file, including joint ventures this contractor is part of.
Total projects
136
Total budget
₱5.4B
Average progress
95.2%
Completion rate
85.3%
Average risk score
47.3
Medium risk on average, out of 100
Flagged as unusual
9
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 100 | ₱3.6B | 48.4 | 5 | 96.3% |
| Region XII | 19 | ₱528.8M | 31.6 | 4 | 90.4% |
| Region VIII | 9 | ₱828.7M | 63.6 | 0 | 92.7% |
| Negros Island Region | 3 | ₱240.1M | 58.0 | 0 | 88.7% |
| Region III | 2 | ₱126.8M | 51.0 | 0 | 100.0% |
| National Capital Region | 2 | ₱10.1M | 47.9 | 0 | 100.0% |
| Region X | 1 | ₱65.6M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 101 | ₱4.3B | 47.6 | 2 | 97.7% |
| Buildings and Facilities | 19 | ₱182.2M | 29.2 | 0 | 99.6% |
| Flood Control and Drainage | 6 | ₱278M | 40.7 | 1 | 78.2% |
| GAA 2025 OO-2 | 3 | ₱235.1M | 91.4 | 2 | 67.3% |
| OTHER | 3 | ₱148.8M | 67.7 | 1 | 79.3% |
| GAA 2025 OO-1 | 2 | ₱98.8M | 93.4 | 2 | 83.9% |
| GAA 2025 SSP | 1 | ₱4.9M | 93.4 | 1 | 60.4% |
| Bridges | 1 | ₱101.2M | 62.8 | 0 | 48.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HA0022ROAD WIDENING - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0026 + 000 - K000278 + 200 | Region VII | Bohol 1st DEO | On-Going | ₱57.8M | 80% | High risk95 | Flagged0.006 |
| 25HA0067COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT/EVACUATION CENTER) AT CAMP FRANCISCO DAGOHOY, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱4.9M | 60% | High risk93 | Flagged0.022 |
| 25HA0014REHABILITATION/ RECONTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILRAN CITY - CORELLA- SIKATUNA RD - K0005 + 326 - K0006 + 000 | Region VII | Bohol 1st DEO | On-Going | ₱40.9M | 88% | High risk92 | Flagged0.004 |
| 25ME0017CONSTRUCTION OF FLOOD CONTROL, LATIAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 80% | High risk92 | Flagged0.004 |
| 25ME0018CONSTRUCTION OF FLOOD CONTROL, KIBLIS, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 87% | High risk91 | Flagged0.003 |
| 25IL0067FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANTURING RIVER FLOOD CONTROL - BOGO SECTION, BOGO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱48.2M | 35% | High risk91 | —-0.002 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 23CC0164SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG PLARIDEL BYPASS ROAD - K0035+(-602) - K0043+878, PLARIDEL AND BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.028 |
| 25H00035CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE II), VIGA, ANTEQUERA, BOHOL | Region VII | Region VII | On-Going | ₱101.2M | 49% | High risk63 | —-0.002 |
| 23I00097INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN RD. - K0924+(-403) - K0934+394, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk61 | —-0.085 |
| 23I00082INSTALLATION OF SOLAR STREETLIGHTS ALONG WRIGHT - TAFT - BORONGAN ROAD - K0892+000 - K0902+832 (S00173SM), EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.3M | 100% | High risk61 | —-0.085 |
| 23HM0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+955 - K0009+790 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 23HM0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+120 - K0008+955 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 23IK0071INSTALLATION OF STREET STUD ALONG WRIGHT - TAFT - BORONGAN ROAD | Region VIII | Samar 2nd DEO | Completed | ₱105.9M | 100% | High risk61 | —-0.081 |
| 23I00081INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIAN ROAD - K1010+686 - K1012+518 (S00170SM) & JCT. BUENAVISTA - LAWAAN - MARABUT ROAD K0986+472 - K0996+238 (S00147SM), EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.3M | 100% | High risk60 | —-0.084 |
| 23HE0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR PAVEMENT STUDS ALONG SIBONGA-DUMANJUG RD - K0058+000-K0061+720, K0061+746-K0067+837, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.084 |
| 23HE0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR PAVEMENTS STUDS ALONG N BACALSO AVE (CEBU SOUTH RD) - K0047+000 - K0050+640, K0050+673-K0054+580, K0054+625-K0055+12 | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 25HA0067COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT/EVACUATION CENTER) AT CAMP FRANCISCO DAGOHOY, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱4.9M | 60% | High risk93 | Flagged0.022 |
| 25HA0022ROAD WIDENING - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0026 + 000 - K000278 + 200 | Region VII | Bohol 1st DEO | On-Going | ₱57.8M | 80% | High risk95 | Flagged0.006 |
| 25ME0017CONSTRUCTION OF FLOOD CONTROL, LATIAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 80% | High risk92 | Flagged0.004 |
| 25M00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 0+000-STA. 0+270, BARANGAY KABLACAN, MAASIM, SARANGANI | Region XII | Region XII | On-Going | ₱58.9M | 12% | Medium risk38 | Flagged0.004 |
| 25HA0014REHABILITATION/ RECONTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILRAN CITY - CORELLA- SIKATUNA RD - K0005 + 326 - K0006 + 000 | Region VII | Bohol 1st DEO | On-Going | ₱40.9M | 88% | High risk92 | Flagged0.004 |
| 25ME0018CONSTRUCTION OF FLOOD CONTROL, KIBLIS, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 87% | High risk91 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23I00095SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES/STREETLIGHTS AND INTERNALLY ILLUMINATED (SOLAR) PAVEMENT MARKERS ALONG BDRY. SO. LEYTE - MAASIN - MACROHON - DAANG MAHARLIKA (S00194LT) - K1132+ | Region VIII | Region VIII | Completed | ₱96.4M | 100% | Medium risk59 | —-0.084 |
| 27 | 22HB0123ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS- JCT (LIR) BUENAVISTA-CARMEN-DANAO-JETAFE RD - K0161 + | Region VII | Bohol 3rd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 28 | 23HB0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, CANDIJAY, BOHOL | Region VII | Bohol 3rd DEO | Completed | ₱101.2M | 100% | Medium risk57 | —-0.081 |
| 29 | 23HE0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG CEBU SOUTH COASTAL RD K0011+(-572) TO K0016+372 (ASCENDING) AND K0015+(-1259) - K0011+598 (DESCEN | Region VII | Cebu 1st DEO | Completed | ₱91.6M | 100% | Medium risk56 | —-0.085 |
| 30 | 20HA0101CONCRETING OF BRGY. ROAD, PUROK 8, 9 AND 10, BRGY. TABALONG, DAUIS, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱13.9M | 100% | Medium risk56 | —-0.057 |
| 31 | 20HA0103CONCRETING OF BRGY. ROAD, PUROK 1, 7 AND 6, BRGY. LOURDES, CORTES, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱11.6M | 100% | Medium risk55 | —-0.064 |
| 32 | 22HA0083INSTALLATION OF SOLAR LED LIGHTINGS ON ROADS LEADING TO NEW BOHOL-PANGLAO INTERNATIONAL AIRPORT - JCT. (TER) DAUIS-PANGLAO ROAD (S00021BH) - K0003+000 - K0018+084 | Region VII | Bohol 1st DEO | Completed | ₱73.8M | 100% | Medium risk54 | —-0.089 |
| 33 | 21HA0153INSTALLATION OF SOLAR STREET LIGHTS AND SAFETY SIGN AND DEVICES ALONG TAGBILARAN NORTH ROAD KM 0034+601 - KM 0046+000 (INTERMITTENT), LOON AND CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱80.8M | 100% | Medium risk54 | —-0.087 |
| 34 | 24HA0093REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILARAN CITY-CORELLA-SIKATUNA-LOBOC RD - K0001+903 - K0003+000, K0004+000 - K0005+000 | Region VII | Bohol 1st DEO | Completed | ₱88.2M | 100% | Medium risk54 | —-0.084 |
| 35 | 21HA0152INSTALLATION OF SOLAR STREET LIGHTS AND SAFETY SIGN AND DEVICES ALONG TAGBILARAN NORTH ROAD KM 0008+936 - KM 0010+000 AND KM 0046+000 - KM 0057+867 (INTERMITTENT), CORTES, CALAPE AND TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱86.8M | 100% | Medium risk54 | —-0.085 |
| 36 | 22HA0104INSTALLATION OF SOLAR LED LIGHTINGS ON ROADS LEADING TO NEW BOHOL-PANGLAO INTERNATIONAL AIRPORT - PANGLAO ISLAND CIRCUMFERENTIAL ROAD (VIA TANGNAN) | Region VII | Bohol 1st DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.088 |
| 37 | 23HA0048INSTALLATION OF SOLAR LIGHTING ALONG TAGBILARAN CITY-CORELLA, SIKATUNA - LOBOC RD (S00019BH) K0007+(-378) - K0014+953, CORELLA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱59.3M | 100% | Medium risk54 | —-0.091 |
| 38 | 22HA0082INSTALLATION OF SOLAR LED LIGHTINGS ALONG JCT. (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON) ROAD - K0024+040-K0033+574 | Region VII | Bohol 1st DEO | Completed | ₱61.8M | 100% | Medium risk54 | —-0.092 |
| 39 | 22HA0084INSTALLATION OF SOLAR LED LIGHTINGS ALONG JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS ROAD (S00031BH) - K0017+150-K0028+580 | Region VII | Bohol 1st DEO | Completed | ₱67.4M | 100% | Medium risk54 | —-0.091 |
| 40 | 22HA0101INSTALLATION OF SOLAR LED LIGHTINGS ALONG JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0038+160-K0049+568 | Region VII | Bohol 1st DEO | Completed | ₱75.9M | 100% | Medium risk53 | —-0.089 |
| 41 | 25HA0005CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY PANADTARAN, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱55.4M | 82% | Medium risk52 | —-0.034 |
| 42 | 23HM0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICE / SOLAR STREETLIGHTS ALONG SIQUIJOR CIRCUMFERENTIAL RD - K0063+000 - K0068+000, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱49M | 66% | Medium risk52 | —-0.040 |
| 43 | 22KE0042INSTALLATION OF ROAD SAFETY DEVICES (INTEGRATED SOLAR STREETLIGHTS AND SOLAR PAVEMENT STUDS) | Region X | Camiguin DEO | Completed | ₱65.6M | 100% | Medium risk51 | —-0.090 |
| 44 | 22HA0081INSTALLATION OF SOLAR LED LIGHTINGS ALONG JCT. (TNR) MARIBOJOC-ANTEQUERA-CATAGBACAN (LOON) ROAD - K0016+605-K0024+040 | Region VII | Bohol 1st DEO | Completed | ₱48.9M | 100% | Medium risk51 | —-0.094 |
| 45 | 24HA0064INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG TAGBILARAN - NORTH ROAD (TAGBILARAN - JETAFE SECTION) (TAGBILARAN NORTH ROAD MARIBOJOC) - LOON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.094 |
| 46 | 23HA0055INSTALLATION OF SOLAR STREET LIGHTS ALONG BRGY. DEL CARMEN WESTE, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱48.8M | 100% | Medium risk50 | —-0.094 |
| 47 | 24H00050CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CAHAYAG FLOOD CONTROL STRUCTURE, CAHAYAG TUBIGON, BOHOL | Region VII | Region VII | On-Going | ₱48.2M | 89% | Medium risk50 | —-0.030 |
| 48 | 24H00051CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF MARIBOJOC FLOOD CONTROL STRUCTURE, PHASE 2, POBLACION-ANISLAG-BAYACABAC-PUNSOD, MARIBOJOC, B | Region VII | Region VII | On-Going | ₱48.2M | 86% | Medium risk50 | —-0.029 |
| 49 | 20HA0139CONSTRUCTION OF 4STY 20CL, DR. CECILIO PUTONG NHS (BOHOL NHS), TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱52.1M | 100% | Medium risk50 | —-0.026 |
| 50 | 23HA0047INSTALLATION OF SOLAR LIGHTING ALONG TAGBILARAN CITY-CORELLA, SIKATUNA - LOBOC RD (S00019BH) K0014+953 - K0021+771, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱49.7M | 100% | Medium risk50 | —-0.093 |