Contractor dossier
136 projects on file, including joint ventures this contractor is part of.
Total projects
136
Total budget
₱5.4B
Average progress
95.2%
Completion rate
85.3%
Average risk score
47.3
Medium risk on average, out of 100
Flagged as unusual
9
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 100 | ₱3.6B | 48.4 | 5 | 96.3% |
| Region XII | 19 | ₱528.8M | 31.6 | 4 | 90.4% |
| Region VIII | 9 | ₱828.7M | 63.6 | 0 | 92.7% |
| Negros Island Region | 3 | ₱240.1M | 58.0 | 0 | 88.7% |
| Region III | 2 | ₱126.8M | 51.0 | 0 | 100.0% |
| National Capital Region | 2 | ₱10.1M | 47.9 | 0 | 100.0% |
| Region X | 1 | ₱65.6M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 101 | ₱4.3B | 47.6 | 2 | 97.7% |
| Buildings and Facilities | 19 | ₱182.2M | 29.2 | 0 | 99.6% |
| Flood Control and Drainage | 6 | ₱278M | 40.7 | 1 | 78.2% |
| GAA 2025 OO-2 | 3 | ₱235.1M | 91.4 | 2 | 67.3% |
| OTHER | 3 | ₱148.8M | 67.7 | 1 | 79.3% |
| GAA 2025 OO-1 | 2 | ₱98.8M | 93.4 | 2 | 83.9% |
| GAA 2025 SSP | 1 | ₱4.9M | 93.4 | 1 | 60.4% |
| Bridges | 1 | ₱101.2M | 62.8 | 0 | 48.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HA0022ROAD WIDENING - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0026 + 000 - K000278 + 200 | Region VII | Bohol 1st DEO | On-Going | ₱57.8M | 80% | High risk95 | Flagged0.006 |
| 25HA0067COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT/EVACUATION CENTER) AT CAMP FRANCISCO DAGOHOY, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱4.9M | 60% | High risk93 | Flagged0.022 |
| 25HA0014REHABILITATION/ RECONTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILRAN CITY - CORELLA- SIKATUNA RD - K0005 + 326 - K0006 + 000 | Region VII | Bohol 1st DEO | On-Going | ₱40.9M | 88% | High risk92 | Flagged0.004 |
| 25ME0017CONSTRUCTION OF FLOOD CONTROL, LATIAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 80% | High risk92 | Flagged0.004 |
| 25ME0018CONSTRUCTION OF FLOOD CONTROL, KIBLIS, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 87% | High risk91 | Flagged0.003 |
| 25IL0067FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CANTURING RIVER FLOOD CONTROL - BOGO SECTION, BOGO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱48.2M | 35% | High risk91 | —-0.002 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 23CC0164SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG PLARIDEL BYPASS ROAD - K0035+(-602) - K0043+878, PLARIDEL AND BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.028 |
| 25H00035CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE II), VIGA, ANTEQUERA, BOHOL | Region VII | Region VII | On-Going | ₱101.2M | 49% | High risk63 | —-0.002 |
| 23I00097INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN RD. - K0924+(-403) - K0934+394, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk61 | —-0.085 |
| 23I00082INSTALLATION OF SOLAR STREETLIGHTS ALONG WRIGHT - TAFT - BORONGAN ROAD - K0892+000 - K0902+832 (S00173SM), EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.3M | 100% | High risk61 | —-0.085 |
| 23HM0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+955 - K0009+790 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 23HM0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG LUYANG-POO-LAZI RD - K0008+120 - K0008+955 | Negros Island Region | Siquijor DEO | On-Going | ₱95.5M | 100% | High risk61 | —-0.042 |
| 23IK0071INSTALLATION OF STREET STUD ALONG WRIGHT - TAFT - BORONGAN ROAD | Region VIII | Samar 2nd DEO | Completed | ₱105.9M | 100% | High risk61 | —-0.081 |
| 23I00081INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIAN ROAD - K1010+686 - K1012+518 (S00170SM) & JCT. BUENAVISTA - LAWAAN - MARABUT ROAD K0986+472 - K0996+238 (S00147SM), EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱96.3M | 100% | High risk60 | —-0.084 |
| 23HE0112CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR PAVEMENT STUDS ALONG SIBONGA-DUMANJUG RD - K0058+000-K0061+720, K0061+746-K0067+837, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.084 |
| 23HE0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR PAVEMENTS STUDS ALONG N BACALSO AVE (CEBU SOUTH RD) - K0047+000 - K0050+640, K0050+673-K0054+580, K0054+625-K0055+12 | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 25HA0067COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT/EVACUATION CENTER) AT CAMP FRANCISCO DAGOHOY, TAGBILARAN CITY, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱4.9M | 60% | High risk93 | Flagged0.022 |
| 25HA0022ROAD WIDENING - TERTIARY ROADS - JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0026 + 000 - K000278 + 200 | Region VII | Bohol 1st DEO | On-Going | ₱57.8M | 80% | High risk95 | Flagged0.006 |
| 25ME0017CONSTRUCTION OF FLOOD CONTROL, LATIAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 80% | High risk92 | Flagged0.004 |
| 25M00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 0+000-STA. 0+270, BARANGAY KABLACAN, MAASIM, SARANGANI | Region XII | Region XII | On-Going | ₱58.9M | 12% | Medium risk38 | Flagged0.004 |
| 25HA0014REHABILITATION/ RECONTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAGBILRAN CITY - CORELLA- SIKATUNA RD - K0005 + 326 - K0006 + 000 | Region VII | Bohol 1st DEO | On-Going | ₱40.9M | 88% | High risk92 | Flagged0.004 |
| 25ME0018CONSTRUCTION OF FLOOD CONTROL, KIBLIS, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 87% | High risk91 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22HA0053CONSTRUCTION OF ROAD, BARANGAY TAGUSTUSAN, BALILIHAN - SEVILLA ROAD, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱28.5M | 100% | Medium risk45 | —-0.095 |
| 102 | 22HA0028CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - JCT. TCSR POBLACION-LIBJO ROAD LEADING TO MIRRORS OF THE WORLD SIKATUNA AND SIKATUNA TREE PARK, SIKATUNA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱7.1M | 100% | Medium risk45 | —-0.095 |
| 103 | 22HC0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF POPOO TO VILLA MILAGROSA CPG (VILLA MILAGROSA TO POBLACION), CARLOS | Region VII | Bohol 2nd DEO | Completed | ₱19.4M | 100% | Medium risk44 | —-0.094 |
| 104 | 25HA0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM | Region VII | Bohol 1st DEO | Completed | ₱2.6M | 100% | Medium risk44 | —-0.031 |
| 105 | 21HA0003CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - LA PAZ (CORTES) - CABAGUAN - LOURDES - ANISLAG (CORELLA) ROAD IN SUPPORT TO AGRIBUSINESS INDUSTRY, CORTES, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.093 |
| 106 | 24HA0120CONSTRUCTION OF 1STY3CL, TANDAY ES, CORELLA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱8.6M | 100% | Medium risk42 | —-0.054 |
| 107 | 21HA0176CONCRETING OF BRGY. POBLACION FMR, BRGY. POBLACION, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱12.1M | 100% | Medium risk41 | —-0.042 |
| 108 | 23HA0101CONCRETING OF BRGY. SAL-ING FMR, BRGY. SAL-ING, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱11.8M | 100% | Medium risk41 | —-0.041 |
| 109 | 22HA0099CONCRETING OF BRGY. SAL-ING FMR, BRGY. SAL-ING, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱12.3M | 100% | Medium risk41 | —-0.041 |
| 110 | 23HA0099CONCRETING OF BRGY. BAUCAN SUR FMR, BRGY. BAUCAN SUR, BALILIHAN, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱12.9M | 100% | Medium risk41 | —-0.041 |
| 111 | 23HC0103CONCRETING OF BRGY. CAMPAMANOG FMR, BRGY. CAMPAMANOG, CARLOS P. GARCIA, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱12.7M | 100% | Medium risk39 | —-0.039 |
| 112 | 23HC0097CONCRETING OF BRGY. BENLIW FMR, BRGY. BENLIW, UBAY, BOHOL | Region VII | Bohol 2nd DEO | Completed | ₱12.7M | 100% | Medium risk39 | —-0.040 |
| 113 | 25M00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 0+000-STA. 0+270, BARANGAY KABLACAN, MAASIM, SARANGANI | Region XII | Region XII | On-Going | ₱58.9M | 12% | Medium risk38 | Flagged0.004 |
| 114 | 19CD0330CONSTRUCTION OF 3-STOREY, 9-CLASSROOM SCHOOL BUILDING SAN VICENTE ES SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱30.3M | 100% | Medium risk30 | —-0.045 |
| 115 | 24ME0097CONSTRUCTION OF MALIGANG RIVER CONTROL, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱52.7M | 100% | Low risk29 | —-0.069 |
| 116 | 18ME0021CONST./IMPROVEMENT OF NRJ RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE, BRGY. POB., MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱34.3M | 100% | Low risk28 | —-0.086 |
| 117 | 22ME0064CONST. OF ROAD, BARANGAY DATAL BATONG TO BRGY. DATAL BILA, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱44.1M | 100% | Low risk28 | —-0.081 |
| 118 | 21ME0039NRH RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE, BRGY. POBLACION; MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9.7M | 100% | Low risk27 | —-0.087 |
| 119 | 22MG0061INSTALLATION OF SOLAR STREET LIGHTS IN BARANGAY ZONE IV, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱9.7M | 100% | Low risk26 | —-0.089 |
| 120 | 20ME0041NRJ RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE, BRGY. POBLACION; MALUNGON, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱19.6M | 100% | Low risk26 | —-0.086 |
| 121 | 19ME0010NRJ RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE; BRGY. POBLACION, MALUNGON, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱20.6M | 100% | Low risk26 | —-0.087 |
| 122 | 22ME0039NJR RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE, BRGY. POBLACION, MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.086 |
| 123 | 19ME0065CONST. OF FLOOD CONTROL, BRGY. NAGPAN; MALUNGON, SAR. PROV. | Region XII | Sarangani DEO | Completed | ₱14.7M | 100% | Low risk24 | —-0.071 |
| 124 | 24HA0020REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECT) - K0009+906 - K0010+140 | Region VII | Bohol 1st DEO | On-Going | ₱2.9M | 100% | Low risk22 | —-0.052 |
| 125 | 22HA0065CONSTRUCTION OF ROAD, CALAPE, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱4M | 100% | Low risk22 | —-0.097 |