Opening the dossier…
Opening the dossier…
Contractor dossier
2 projects on file, including joint ventures this contractor is part of.
Total projects
2
Total budget
₱193M
Average progress
100.0%
Completion rate
100.0%
Average risk score
61.8
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 2 | ₱193M | 61.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 1 | ₱96.5M | 63.6 | 0 | 100.0% |
| Roads | 1 | ₱96.5M | 60.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 22DM0130CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH BRIDGE, GENERAL LUNA, QUEZONGENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.065 |
| 2 | 22DM0134SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD ALONG TAGABAS IBABA - DOONGAN ILAYA, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.092 |