Contractor dossier
334 projects on file, including joint ventures this contractor is part of.
Total projects
334
Total budget
₱12B
Average progress
95.4%
Completion rate
89.2%
Average risk score
35.4
Medium risk on average, out of 100
Flagged as unusual
30
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 155 | ₱882.8M | 13.2 | 5 | 100.0% |
| Region IV-B | 21 | ₱1.7B | 54.5 | 1 | 100.0% |
| Region VI | 21 | ₱401.8M | 40.1 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.1B | 63.4 | 1 | 92.7% |
| Region VIII | 16 | ₱948.4M | 60.3 | 0 | 98.5% |
| Region VII | 16 | ₱653.3M | 46.7 | 2 | 87.8% |
| Cordillera Administrative Region | 15 | ₱580.6M | 52.8 | 3 | 98.8% |
| Region X | 13 | ₱799.3M | 61.5 | 2 | 91.6% |
| National Capital Region | 11 | ₱1.1B | 46.4 | 4 | 75.4% |
| Region V | 10 | ₱1B | 63.6 | 1 | 73.2% |
| Region XII | 9 | ₱698.6M | 49.6 | 2 | 96.3% |
| Region XI | 8 | ₱863.5M | 81.0 | 5 | 51.9% |
| Region II | 8 | ₱318.7M | 48.4 | 2 | 100.0% |
| Region XIII | 6 | ₱318.3M | 49.0 | 1 | 86.7% |
| Region I | 5 | ₱165.6M | 54.9 | 0 | 100.0% |
| Negros Island Region | 2 | ₱177.7M | 54.3 | 0 | 80.4% |
| Region III | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 172 | ₱2.5B | 15.2 | 11 | 97.0% |
| Roads | 79 | ₱4.4B | 50.7 | 5 | 93.3% |
| Flood Control and Drainage | 48 | ₱2.5B | 53.4 | 3 | 99.0% |
| OTHER | 16 | ₱1.1B | 73.4 | 2 | 94.7% |
| GAA 2025 OO-2 | 6 | ₱805.6M | 92.8 | 3 | 77.5% |
| Bridges | 6 | ₱136.6M | 47.8 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱194M | 93.8 | 5 | 52.6% |
| GAA 2025 OO-1 | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
| Bridges, Roads | 1 | ₱19.8M | 38.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 25KH0074CONSTRUCTION OF ACCESS ROAD, BARANGAY BAIKINGON, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 76% | High risk94 | Flagged0.006 |
| 25F00372ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | Region V | On-Going | ₱93.6M | 60% | High risk94 | —-0.006 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 25KL0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 2, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱144M | 99% | High risk93 | —-0.008 |
| 25LI0017CONSTRUCTION OF REVETMENT ALONG SAUG RIVER LEADING TO LIBUGANON RIVER, (MAYAON BRIDGE SECTION), BARANGAY MAYAON, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱105.2M | 84% | High risk92 | —-0.001 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 17IM0016IMPROVEMENT/WIDENING OF LEYTE SAMAR ROAD (VIA GUINTIGUI-AN) (S00001LT), K0901+(-540) TO K0901+(-160), K0901+214 - K0902+208, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱63.1M | 100% | High risk81 | —-0.034 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 23F00283CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF LABO RIVER CONTROL STRUCTURE, SITIO MANDALIG, BRGY. CAGBALOGO, VINZONS, CAMARINES NO | Region V | Region V | Completed | ₱99M | 100% | High risk78 | —-0.022 |
| 17IM0034IMPROVEMENT/WIDENING OF SAN JOSE MANLURIP MACARTHUR PARK ROAD (VIA GUINTIGUI-AN), (S00021LT), K0912+(-270) TO K0912+400, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱18.5M | 100% | High risk78 | —-0.029 |
| 25K00429STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, SALAY, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱48M | 18% | High risk75 | Flagged0.008 |
| 23KC0043ROAD WIDENING ALONG SAYRE HIGHWAY - K1443+160-K1443+940, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱67.8M | 100% | High risk75 | —-0.033 |
| 17AE0045CONSTRUCTION OF BARANGAY ROAD AT CADACLAN TO SIBUAN-OTONG, BRGY. CADACLAN, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.026 |
| 18D00068LOCAL PROGRAMS ONSTRUCTION/REPAIR/ REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS LOCAL ROADS AND BRIDGES / LOCAL ROADS IMPROVEMENT / WIDENING OF DAANG HARI ROAD, BACOOR, CAVITE-CHAINAGE 3960-CHAINAGE 9028, CAVITE | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk73 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 17JG0240CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT JUDGE EDMUNDO PINGA NHS (BLDG. 5), VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱2.8M | 100% | Low risk10 | Flagged0.039 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 23L00229INCREASE IN CARRYING CAPACITY OF THE COLLEGE OF MEDICINE | Region XI | Region XI | On-Going | ₱89.4M | 24% | Medium risk52 | Flagged0.038 |
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 18H00045LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS, WIDENING OF PUNTA ENGAÑO ROAD, INCLUDING ROW ACQUISITION, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱239.7M | 0% | High risk63 | Flagged0.032 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 24OD0295CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN MAYPAJO HIGH SCHOOL, BRGY. 33, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱39.2M | 14% | Medium risk49 | Flagged0.018 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 17PL0112REPAIR/REHABILITATION/IMPROVEMENT (ADDITIONAL PAVEMENT WIDTH W/ SLOPE PROTECTION & DRAINAGE IMPROVEMENT OF KALINGA - CAGAYAN ROAD, KO498+340 - KO499+800 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.5M | 100% | Medium risk56 | Flagged0.017 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 24O00212INCREASE IN CARRYING CAPACITY OF COLLEGE OF MEDICINE, UP MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱13.1M | 15% | Medium risk45 | Flagged0.014 |
| 17OB0459CONSTRUCTION OF FOUR (4) STOREY, THIRTY SIX (36) CLASSROOM, INDUSTRIAL VALLEY COMPLEX (IVC) NATIONAL HIGH SCHOOL, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱104.9M | 100% | Medium risk49 | Flagged0.013 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 18H00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - TERTIARY ROADS HERNAN CORTES ST., INCLUDING ROW - (S00367CB), CHAINAGE 000 - CHAINAGE 1374.54 | Region VII | Region VII | On-Going | ₱50M | 5% | Medium risk51 | Flagged0.011 |
| 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 24DG0112CONST. OF MPB, TAGAYTAY SPORTS CAMP, PHASE 2, CRISANTO DELOS REYES AVE. BRGY. KAYBAGAL SOUTH, TAG. C | Region IV-A | Cavite 2nd DEO | On-Going | ₱68.5M | 55% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17M00007ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, K1857+700 - K1859+000 (CHAINAGE 10698 - CHAINAGE 12000), K1859+973 - K1862+230 (CHAINAGE 12973 - CHAINAGE 15231), TINALON SECTION, SNA, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk70 | —-0.008 |
| 27 | 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 28 | 18DC0014CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱24.5M | 100% | High risk69 | —-0.043 |
| 29 | 25F00241ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0254+047-K0255+287, K0255+325-K0255+580, STA. ELENA, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱142.5M | 0% | High risk69 | —-0.027 |
| 30 | 17DD0023REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, BATANGAS-LOBO ROAD, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱10.3M | 100% | High risk69 | —-0.041 |
| 31 | 17DD0031ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TERTIARY ROADS, SAN JUAN - LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱68.5M | 100% | High risk69 | —-0.048 |
| 32 | 18DC0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, ROAD W | Region IV-A | Batangas 3rd DEO | Completed | ₱39.2M | 100% | High risk69 | —-0.044 |
| 33 | 25L00041PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT DIGOS SECT) - K1537+200 - K1538+391, K1538+985 - K1540+123, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 34 | 25L00040PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY (DAVAO CITY - JCT. DIGOS SECT) - K1540+123 - K1541+163, K1541+767 - K1542+838, K1542+941 - K1543+130, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱140.3M | 41% | High risk66 | —-0.024 |
| 35 | 24IC0116RENOVATION AND RECONSTRUCTION OF MULTI-PURPOSE HALL (ACTIVITY BUILDING), VSU TOLOSA CAMPUS, TOLOSA, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱39.6M | 77% | High risk66 | —-0.026 |
| 36 | 17J00057ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL SUR 2ND LD, K1750+700.00 - K1751+604.74, K1751+662.79 - K1751+782.79, K1751+804+30 - K1752+302.00, K1752+332.43 - K1752+700.00, NET LENGTH: 1,890.01 LN.M. | Region IX | Region IX | Completed | ₱48.7M | 100% | High risk66 | —-0.053 |
| 37 | 17E00072ROAD UPGRADING (UNPAVED TO PAVED) OF PARPAGOHA (MARIGONDON)-BINOOG ROAD K0023+585-K0025+741, TABLAS, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.043 |
| 38 | 24F00239CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM(BIP)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DAET RIVER CONTROL STRUCTURE, DOGONGAN SECTION, DAET, CAMARINES NORTE | Region V | Region V | Completed | ₱99M | 100% | High risk66 | —-0.074 |
| 39 | 17JG0012ROAD UPGRADING (UNPAVED TO PAVED) ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD (SO1175MN), 1. K1717+020 - K1717+369 W/ EXCEPTION, 2. K1718+109 - K1718+253, 3. K1724+020 - K1724+720, 4. K1724+720 - K1724+883, DIPLO, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱42.3M | 100% | High risk66 | —-0.037 |
| 40 | 17BD0010MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 0+238-STA. 0+535.20, CAGGAY, TUGUEGARAO CITY, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱45.4M | 100% | High risk65 | —-0.025 |
| 41 | 23F00280CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF DAET RIVER CONTROL STRUCTURE, GUBAT SECTION, BRGY. GUBAT, DAET, CAMARINES NORTE | Region V | Region V | Completed | ₱99M | 100% | High risk65 | —-0.074 |
| 42 | 17J00020ROAD WIDENING INCLUDING DRAINAGE OF PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA DEL SUR, 2ND DEO, K1681+892.00 - K1684+271.00 (NET LENGTH: 2,379.00 LN.M.) | Region IX | Region IX | Completed | ₱55.8M | 100% | High risk65 | —-0.052 |
| 43 | 17EB0130CLUSTER FCD04: CONSTRUCITON/REHABILITATION OF VARIOUS FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS: A) BUSUANGA RIVER FLOOD CONTROL STRUCTURE, STA.0+000-STA.0+390, SAN JOSE, B) BUSUANGA RIVER FLOOD CONTROL STRUCTURE, STA. 0+000-STA.0+390, SAN JO | Region IV-B | Mindoro Occidental DEO | Completed | ₱16.8M | 100% | High risk65 | —-0.043 |
| 44 | 17EB0128CLUSTER FCD02:: CONSTRUCTION/REHABILITATION OF VARIOUS FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS: A) ALAG (MALAYLAY-BACO)RIVER FLOOD CONTROL, SABLAYAN, OCC. MINDORO, B) ALAG(MALAYLAY-BACO)RIVER FLDOO CONTROL, SABLAYAN, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱16.8M | 100% | High risk65 | —-0.044 |
| 45 | 17JG0023ROAD UPGRADING (UNPAVED TO PAVED) ALONG IMELDA-BAYOG-KUMALARANG-LAPUYAN-MARGOSATUBIG ROAD (SALAMBUYAN SECTION) (S01184MN) CHAINAGE 22415 - CHAINAGE 22063, SALAMBUYAN SECTION, LAPUYAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱16.3M | 100% | High risk65 | —-0.038 |
| 46 | 17AE0032REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER AT BRGY. IPET, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱18.5M | 100% | High risk65 | —-0.045 |
| 47 | 17JA0024CONSTRUCTION/EXTENSION OF FLOOD CONTROL AT SAAZ RIVER, SAN RAMON, (INCLUDING RIGHT OF WAY ACQUISITION) ZAMBOANGA CITY 1ST LD | Region IX | Zamboanga City 2nd DEO | Completed | ₱29.2M | 100% | High risk65 | —-0.043 |
| 48 | 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 49 | 18IF0071ROAD WIDENING, PALO-CARIGARA-ORMOC ROAD K0984+(-725)-K0984+000; K984+727-K984+875; K984+890-K0986+448; K0986+448-K0987+483; K0987+554-K0988+013; K0990+725-K0990+1098; K0990+1109.11-K0992+633; K0992+642-K0993+178; K0994+030-K0994+317, K1000+126-K1000+654 | Region VIII | Leyte 4th DEO | Completed | ₱193M | 100% | High risk65 | —-0.064 |
| 50 | 18IG0038CONSTRUCTION OF FLOOD STRUCTURES IN BUYHANG RIVER, BRGY.GABAS, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱47.2M | 100% | High risk64 | —-0.055 |