Contractor dossier
334 projects on file, including joint ventures this contractor is part of.
Total projects
334
Total budget
₱12B
Average progress
95.4%
Completion rate
89.2%
Average risk score
35.4
Medium risk on average, out of 100
Flagged as unusual
30
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 155 | ₱882.8M | 13.2 | 5 | 100.0% |
| Region IV-B | 21 | ₱1.7B | 54.5 | 1 | 100.0% |
| Region VI | 21 | ₱401.8M | 40.1 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.1B | 63.4 | 1 | 92.7% |
| Region VIII | 16 | ₱948.4M | 60.3 | 0 | 98.5% |
| Region VII | 16 | ₱653.3M | 46.7 | 2 | 87.8% |
| Cordillera Administrative Region | 15 | ₱580.6M | 52.8 | 3 | 98.8% |
| Region X | 13 | ₱799.3M | 61.5 | 2 | 91.6% |
| National Capital Region | 11 | ₱1.1B | 46.4 | 4 | 75.4% |
| Region V | 10 | ₱1B | 63.6 | 1 | 73.2% |
| Region XII | 9 | ₱698.6M | 49.6 | 2 | 96.3% |
| Region XI | 8 | ₱863.5M | 81.0 | 5 | 51.9% |
| Region II | 8 | ₱318.7M | 48.4 | 2 | 100.0% |
| Region XIII | 6 | ₱318.3M | 49.0 | 1 | 86.7% |
| Region I | 5 | ₱165.6M | 54.9 | 0 | 100.0% |
| Negros Island Region | 2 | ₱177.7M | 54.3 | 0 | 80.4% |
| Region III | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 172 | ₱2.5B | 15.2 | 11 | 97.0% |
| Roads | 79 | ₱4.4B | 50.7 | 5 | 93.3% |
| Flood Control and Drainage | 48 | ₱2.5B | 53.4 | 3 | 99.0% |
| OTHER | 16 | ₱1.1B | 73.4 | 2 | 94.7% |
| GAA 2025 OO-2 | 6 | ₱805.6M | 92.8 | 3 | 77.5% |
| Bridges | 6 | ₱136.6M | 47.8 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱194M | 93.8 | 5 | 52.6% |
| GAA 2025 OO-1 | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
| Bridges, Roads | 1 | ₱19.8M | 38.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 25KH0074CONSTRUCTION OF ACCESS ROAD, BARANGAY BAIKINGON, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 76% | High risk94 | Flagged0.006 |
| 25F00372ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | Region V | On-Going | ₱93.6M | 60% | High risk94 | —-0.006 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 25KL0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 2, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱144M | 99% | High risk93 | —-0.008 |
| 25LI0017CONSTRUCTION OF REVETMENT ALONG SAUG RIVER LEADING TO LIBUGANON RIVER, (MAYAON BRIDGE SECTION), BARANGAY MAYAON, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱105.2M | 84% | High risk92 | —-0.001 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 17IM0016IMPROVEMENT/WIDENING OF LEYTE SAMAR ROAD (VIA GUINTIGUI-AN) (S00001LT), K0901+(-540) TO K0901+(-160), K0901+214 - K0902+208, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱63.1M | 100% | High risk81 | —-0.034 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 23F00283CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF LABO RIVER CONTROL STRUCTURE, SITIO MANDALIG, BRGY. CAGBALOGO, VINZONS, CAMARINES NO | Region V | Region V | Completed | ₱99M | 100% | High risk78 | —-0.022 |
| 17IM0034IMPROVEMENT/WIDENING OF SAN JOSE MANLURIP MACARTHUR PARK ROAD (VIA GUINTIGUI-AN), (S00021LT), K0912+(-270) TO K0912+400, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱18.5M | 100% | High risk78 | —-0.029 |
| 25K00429STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, SALAY, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱48M | 18% | High risk75 | Flagged0.008 |
| 23KC0043ROAD WIDENING ALONG SAYRE HIGHWAY - K1443+160-K1443+940, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱67.8M | 100% | High risk75 | —-0.033 |
| 17AE0045CONSTRUCTION OF BARANGAY ROAD AT CADACLAN TO SIBUAN-OTONG, BRGY. CADACLAN, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.026 |
| 18D00068LOCAL PROGRAMS ONSTRUCTION/REPAIR/ REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS LOCAL ROADS AND BRIDGES / LOCAL ROADS IMPROVEMENT / WIDENING OF DAANG HARI ROAD, BACOOR, CAVITE-CHAINAGE 3960-CHAINAGE 9028, CAVITE | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk73 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 17JG0240CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT JUDGE EDMUNDO PINGA NHS (BLDG. 5), VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱2.8M | 100% | Low risk10 | Flagged0.039 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 23L00229INCREASE IN CARRYING CAPACITY OF THE COLLEGE OF MEDICINE | Region XI | Region XI | On-Going | ₱89.4M | 24% | Medium risk52 | Flagged0.038 |
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 18H00045LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS, WIDENING OF PUNTA ENGAÑO ROAD, INCLUDING ROW ACQUISITION, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱239.7M | 0% | High risk63 | Flagged0.032 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 24OD0295CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN MAYPAJO HIGH SCHOOL, BRGY. 33, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱39.2M | 14% | Medium risk49 | Flagged0.018 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 17PL0112REPAIR/REHABILITATION/IMPROVEMENT (ADDITIONAL PAVEMENT WIDTH W/ SLOPE PROTECTION & DRAINAGE IMPROVEMENT OF KALINGA - CAGAYAN ROAD, KO498+340 - KO499+800 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.5M | 100% | Medium risk56 | Flagged0.017 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 24O00212INCREASE IN CARRYING CAPACITY OF COLLEGE OF MEDICINE, UP MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱13.1M | 15% | Medium risk45 | Flagged0.014 |
| 17OB0459CONSTRUCTION OF FOUR (4) STOREY, THIRTY SIX (36) CLASSROOM, INDUSTRIAL VALLEY COMPLEX (IVC) NATIONAL HIGH SCHOOL, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱104.9M | 100% | Medium risk49 | Flagged0.013 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 18H00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - TERTIARY ROADS HERNAN CORTES ST., INCLUDING ROW - (S00367CB), CHAINAGE 000 - CHAINAGE 1374.54 | Region VII | Region VII | On-Going | ₱50M | 5% | Medium risk51 | Flagged0.011 |
| 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 24DG0112CONST. OF MPB, TAGAYTAY SPORTS CAMP, PHASE 2, CRISANTO DELOS REYES AVE. BRGY. KAYBAGAL SOUTH, TAG. C | Region IV-A | Cavite 2nd DEO | On-Going | ₱68.5M | 55% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25GK0133PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD K0049 + 366 - K0050 + 616, K0081 + 558 - K0081+842, K0085 + 487 - K0086 + 358 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱142.5M | 61% | High risk64 | —-0.040 |
| 52 | 23DQ0080CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE STRUCTURE ALONG IMUS RIVER, PHASE 1, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96.5M | 90% | High risk64 | —-0.024 |
| 53 | 23DQ0081CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE STRUCTURE ALONG IMUS RIVER, PHASE 2, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱96.5M | 91% | High risk64 | —-0.024 |
| 54 | 18IF0052ROAD WIDENING - ORMOC-BAYBAY SOUTHERN LEYTE BDRY RD, K1015+612-K1016+010; K1017+234-K1018+334; K1018+459-K1019+422; K1024+382-K1024+722; K1027+193.43-K1028+088; K1028+118-K1029+409; K1032+000-K1033+686; K1033+701.15 - K1034+265; K1034+340.30 - K1034+516 | Region VIII | Leyte 4th DEO | Completed | ₱192.5M | 100% | High risk64 | —-0.063 |
| 55 | 25KL0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 1, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱144.4M | 98% | High risk63 | —-0.026 |
| 56 | 18H00045LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS, WIDENING OF PUNTA ENGAÑO ROAD, INCLUDING ROW ACQUISITION, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱239.7M | 0% | High risk63 | Flagged0.032 |
| 57 | 23DG0066CONST OF MPB-CONST OF MPB,TOURIST FACILITIES,CHARACTER HOTEL COMP,BRGY KAYBAGAL SOUTH,TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱99M | 100% | High risk63 | —-0.081 |
| 58 | 22IA0020CONSTRUCTION OF SEAWALL, BARANGAY BURABOD, BILIRAN, BILIRAN (11.477479,124.455618, TO 11.477148, 124.456834) | Region VIII | Biliran DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.053 |
| 59 | 17EB0046NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, JCT MWCR (SN ISIDRO)-PENAL COLONY-JCT YAPANG RD - K0313 + 957 - K0315 + 017, S00100MR | Region IV-B | Mindoro Occidental DEO | Completed | ₱28.9M | 100% | High risk61 | —-0.050 |
| 60 | 17IL0004CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SAN VICENTE SECTION, STA. 8+920-STA. 9+760, SAN VICENTE, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SAN VICENTE, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱44.2M | 100% | High risk61 | —-0.051 |
| 61 | 17IL0003CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SAN JUAN SECTION, STA. 9+760-STA. 10+400, SAN JUAN, SOGOD, SOUTHERN LEYTE, LONE DISTRICT, BRGY. SAN JUAN, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱44.2M | 100% | High risk61 | —-0.051 |
| 62 | 17EB0024ASSET PRESERVATION OF NATIONAL ROADS - RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMS/HDM-4, CROSSING MWCR (POLA)-CASAGUE-JCT ALACAAK RD - K0378+(-122) - K0378+194, S00163MRSANTA CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱11.5M | 100% | High risk60 | —-0.053 |
| 63 | 18EF0002CONST'N/MAINT OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, CONST'N OF MALATGAO F/C | Region IV-B | Palawan 2nd DEO | Completed | ₱96M | 100% | High risk60 | —-0.039 |
| 64 | 18E00031PAVING OF UNPAVED ROADS - QUEZON PUNTA BAJA ROAD, KO162+014-KO162+433; KO167+591-KO168+233; KO189+429-KO192+309, QUEZON, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | Medium risk60 | —-0.033 |
| 65 | 18E00020ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE K0098+800 TO K0101+200, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱190.2M | 100% | Medium risk60 | —-0.026 |
| 66 | 18E00022ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE K0103+940 TO K0105+839, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱164.2M | 100% | Medium risk60 | —-0.030 |
| 67 | 17JG0147PREVENTIVE MAINTENANCE ALONG JCT. TUBOD - LAKEWOOD ROAD (S01188MN) K1701+330 - K1710+130, LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱31.5M | 100% | Medium risk60 | Flagged0.003 |
| 68 | 18E00034PAVING OF UNPAVED ROADS OF PALAWAN CIRCUMFERENTIAL ROAD (PANALINGAAN-TAGBITA-LATUD), KO258+983-KO258+1001; KO259+043-KO259+093; KO263+216-KO267+242, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.3M | 100% | Medium risk60 | —-0.028 |
| 69 | 18E00015ROAD WIDENING OF PTO. PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX LANES INCLUDING DRAINAGE, KO084+835 TO KO086+359, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱141.7M | 100% | Medium risk60 | —-0.038 |
| 70 | 24KL0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AKAE RIVER (RIGHT BANK), PACKAGE 6, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.069 |
| 71 | 24KL0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AKAE RIVER (RIGHT BANK), PACKAGE 5, BARANGAY CASINGLOT, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.070 |
| 72 | 23DG0031CONST OF MPB, TOURIST FACILITY CHARACTER COMPOUND, BRGY KAYBAGAL SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱75.3M | 100% | Medium risk58 | —-0.088 |
| 73 | 17JG0146PREVENTIVE MAINTENANCE ALONG PAGADIAN CITY - ZAMBOANGA CITY (S01453MN) K1678+115 - K1683+349, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱19M | 100% | Medium risk58 | —-0.001 |
| 74 | 17IB0023OFF - CARRIAGEWAY IMPROVEMENT ALONG JCT. TAFT-ORAS-SAN POLICARPO-ARTECHE ROAD (S00167SM), K0956+944 - K0959+400; K0959+541 - K0960+093 K0968+688 - K0969+970, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱48.1M | 100% | Medium risk58 | —-0.058 |
| 75 | 16BC0001CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS,SEAPORTS AND DECLARED TOURISM DESTINATIONS CLAVERIA BAY VIEW BOULEVARD LEADING TO BEACH RESORTS AND TAGGAT LAGOON AND CAVE | Region II | Cagayan 2nd DEO | Completed | ₱42.2M | 100% | Medium risk58 | —-0.043 |