Contractor dossier
334 projects on file, including joint ventures this contractor is part of.
Total projects
334
Total budget
₱12B
Average progress
95.4%
Completion rate
89.2%
Average risk score
35.4
Medium risk on average, out of 100
Flagged as unusual
30
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 155 | ₱882.8M | 13.2 | 5 | 100.0% |
| Region IV-B | 21 | ₱1.7B | 54.5 | 1 | 100.0% |
| Region VI | 21 | ₱401.8M | 40.1 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.1B | 63.4 | 1 | 92.7% |
| Region VIII | 16 | ₱948.4M | 60.3 | 0 | 98.5% |
| Region VII | 16 | ₱653.3M | 46.7 | 2 | 87.8% |
| Cordillera Administrative Region | 15 | ₱580.6M | 52.8 | 3 | 98.8% |
| Region X | 13 | ₱799.3M | 61.5 | 2 | 91.6% |
| National Capital Region | 11 | ₱1.1B | 46.4 | 4 | 75.4% |
| Region V | 10 | ₱1B | 63.6 | 1 | 73.2% |
| Region XII | 9 | ₱698.6M | 49.6 | 2 | 96.3% |
| Region XI | 8 | ₱863.5M | 81.0 | 5 | 51.9% |
| Region II | 8 | ₱318.7M | 48.4 | 2 | 100.0% |
| Region XIII | 6 | ₱318.3M | 49.0 | 1 | 86.7% |
| Region I | 5 | ₱165.6M | 54.9 | 0 | 100.0% |
| Negros Island Region | 2 | ₱177.7M | 54.3 | 0 | 80.4% |
| Region III | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 172 | ₱2.5B | 15.2 | 11 | 97.0% |
| Roads | 79 | ₱4.4B | 50.7 | 5 | 93.3% |
| Flood Control and Drainage | 48 | ₱2.5B | 53.4 | 3 | 99.0% |
| OTHER | 16 | ₱1.1B | 73.4 | 2 | 94.7% |
| GAA 2025 OO-2 | 6 | ₱805.6M | 92.8 | 3 | 77.5% |
| Bridges | 6 | ₱136.6M | 47.8 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱194M | 93.8 | 5 | 52.6% |
| GAA 2025 OO-1 | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
| Bridges, Roads | 1 | ₱19.8M | 38.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 25KH0074CONSTRUCTION OF ACCESS ROAD, BARANGAY BAIKINGON, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 76% | High risk94 | Flagged0.006 |
| 25F00372ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | Region V | On-Going | ₱93.6M | 60% | High risk94 | —-0.006 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 25KL0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 2, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱144M | 99% | High risk93 | —-0.008 |
| 25LI0017CONSTRUCTION OF REVETMENT ALONG SAUG RIVER LEADING TO LIBUGANON RIVER, (MAYAON BRIDGE SECTION), BARANGAY MAYAON, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱105.2M | 84% | High risk92 | —-0.001 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 17IM0016IMPROVEMENT/WIDENING OF LEYTE SAMAR ROAD (VIA GUINTIGUI-AN) (S00001LT), K0901+(-540) TO K0901+(-160), K0901+214 - K0902+208, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱63.1M | 100% | High risk81 | —-0.034 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 23F00283CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF LABO RIVER CONTROL STRUCTURE, SITIO MANDALIG, BRGY. CAGBALOGO, VINZONS, CAMARINES NO | Region V | Region V | Completed | ₱99M | 100% | High risk78 | —-0.022 |
| 17IM0034IMPROVEMENT/WIDENING OF SAN JOSE MANLURIP MACARTHUR PARK ROAD (VIA GUINTIGUI-AN), (S00021LT), K0912+(-270) TO K0912+400, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱18.5M | 100% | High risk78 | —-0.029 |
| 25K00429STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, SALAY, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱48M | 18% | High risk75 | Flagged0.008 |
| 23KC0043ROAD WIDENING ALONG SAYRE HIGHWAY - K1443+160-K1443+940, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱67.8M | 100% | High risk75 | —-0.033 |
| 17AE0045CONSTRUCTION OF BARANGAY ROAD AT CADACLAN TO SIBUAN-OTONG, BRGY. CADACLAN, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.026 |
| 18D00068LOCAL PROGRAMS ONSTRUCTION/REPAIR/ REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS LOCAL ROADS AND BRIDGES / LOCAL ROADS IMPROVEMENT / WIDENING OF DAANG HARI ROAD, BACOOR, CAVITE-CHAINAGE 3960-CHAINAGE 9028, CAVITE | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk73 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 17JG0240CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT JUDGE EDMUNDO PINGA NHS (BLDG. 5), VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱2.8M | 100% | Low risk10 | Flagged0.039 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 23L00229INCREASE IN CARRYING CAPACITY OF THE COLLEGE OF MEDICINE | Region XI | Region XI | On-Going | ₱89.4M | 24% | Medium risk52 | Flagged0.038 |
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 18H00045LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS, WIDENING OF PUNTA ENGAÑO ROAD, INCLUDING ROW ACQUISITION, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱239.7M | 0% | High risk63 | Flagged0.032 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 24OD0295CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN MAYPAJO HIGH SCHOOL, BRGY. 33, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱39.2M | 14% | Medium risk49 | Flagged0.018 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 17PL0112REPAIR/REHABILITATION/IMPROVEMENT (ADDITIONAL PAVEMENT WIDTH W/ SLOPE PROTECTION & DRAINAGE IMPROVEMENT OF KALINGA - CAGAYAN ROAD, KO498+340 - KO499+800 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.5M | 100% | Medium risk56 | Flagged0.017 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 24O00212INCREASE IN CARRYING CAPACITY OF COLLEGE OF MEDICINE, UP MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱13.1M | 15% | Medium risk45 | Flagged0.014 |
| 17OB0459CONSTRUCTION OF FOUR (4) STOREY, THIRTY SIX (36) CLASSROOM, INDUSTRIAL VALLEY COMPLEX (IVC) NATIONAL HIGH SCHOOL, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱104.9M | 100% | Medium risk49 | Flagged0.013 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 18H00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - TERTIARY ROADS HERNAN CORTES ST., INCLUDING ROW - (S00367CB), CHAINAGE 000 - CHAINAGE 1374.54 | Region VII | Region VII | On-Going | ₱50M | 5% | Medium risk51 | Flagged0.011 |
| 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 24DG0112CONST. OF MPB, TAGAYTAY SPORTS CAMP, PHASE 2, CRISANTO DELOS REYES AVE. BRGY. KAYBAGAL SOUTH, TAG. C | Region IV-A | Cavite 2nd DEO | On-Going | ₱68.5M | 55% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 17BH0164REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. 0+432.645), DISIMPIT | Region II | Isabela 4th DEO | Completed | ₱45.4M | 100% | Medium risk57 | Flagged0.009 |
| 77 | 17BH0172REHABILITATION/IMPROVEMENT OF VARIOUS FLOOD CONTROL PROJECTS IN ISABELA - FLOOD CONTROL (STA. 0+000 - STA. 0+259.725 AND STA. 0+000 - STA. -0+432.645), FUGU | Region II | Isabela 4th DEO | Completed | ₱46M | 100% | Medium risk57 | Flagged0.009 |
| 78 | 17OA0013CONST. OF RIVERWALL ALONG SANTULAN RIVER, BRGY. MAYSILO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk57 | —-0.061 |
| 79 | 17IK0007PREVENTIVE MAINT. OF SAN JUANICO - BASEY - SOHOTON ROAD, ASPHALT OVERLAY W/ CORRECTION KO896+723-KO896+740; KO899+100-KO900+590; KO908+331-KO908+650, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱43.2M | 100% | Medium risk57 | —-0.057 |
| 80 | 18EB0043FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF REVETMENT ALONG MAMBURAO RIVER, MAMBURAO, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱92.4M | 100% | Medium risk56 | —-0.055 |
| 81 | 17PL0112REPAIR/REHABILITATION/IMPROVEMENT (ADDITIONAL PAVEMENT WIDTH W/ SLOPE PROTECTION & DRAINAGE IMPROVEMENT OF KALINGA - CAGAYAN ROAD, KO498+340 - KO499+800 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.5M | 100% | Medium risk56 | Flagged0.017 |
| 82 | 24DG0112CONST. OF MPB, TAGAYTAY SPORTS CAMP, PHASE 2, CRISANTO DELOS REYES AVE. BRGY. KAYBAGAL SOUTH, TAG. C | Region IV-A | Cavite 2nd DEO | On-Going | ₱68.5M | 55% | Medium risk56 | Flagged0.009 |
| 83 | 18E00036PAVING OF UNPAVED ROAD PALAWAN CIRCUMFERENTIAL ROAD (PANALINGAAN-TAGBITA-LATUD), STA. 272+480-STA. 275+779.80 (KO272+519-KO275+844), PALAWAN SECOND | Region IV-B | Region IV-B | Completed | ₱119.5M | 100% | Medium risk55 | —-0.034 |
| 84 | 18JG0080CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS PAGADIAN CITY-ZAMBOANGA CITY ROAD, K1675+(-696) - K1723+276, TIGBAO-LAKEWOOD-KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱37.8M | 100% | Medium risk54 | —-0.084 |
| 85 | 23HO0151ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DALAGUETE-MANTALONGON-BADIAN RD (BADIAN SIDE) - K0107 | Region VII | Cebu 7th DEO | Completed | ₱76.9M | 100% | Medium risk54 | —-0.088 |
| 86 | 18JG0074REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. DUMALINAO-MARGOSATUBIG ROAD (LUMBOG), STA.K1716+653-K1716+785, STA.K1716+390-K1716545, STA.K1716+710-K1716+758, STA.K1716+855-K1716+938, & STA.K1717+600-K | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱16.8M | 100% | Medium risk54 | —-0.083 |
| 87 | 18E00017ROAD WIDENING OF PTO. PRINCESA NORTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE, KO089+003 TO KO090+000; KO091+380 TO KO091+782; KO092+301 TO KO092+714, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱109.5M | 100% | Medium risk54 | —-0.044 |
| 88 | 18B00031OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: ASSET PRESERVATION: REHAB/RECONST'N / UPGRADING OF DAMAGED PAVED ROADS: PRIMARY ROADS: REHABILITATION OF PAVED ROAD ALONG DAANG MAHARLIKA (LZ), SANTIAGO, SAN ISIDRO AND ECHAGUE, ISABELA | Region II | Region II | Completed | ₱89.8M | 100% | Medium risk53 | —-0.072 |
| 89 | 18PL0154CONSTRUCTION OF FOUR(4) STOREY EIGHT(8) CLASSROOM WORKSHOP SCHOOL BUILDING 1, TABUK CITY NATIONAL HIGH SCHOOL, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱37.5M | 100% | Medium risk53 | —-0.030 |
| 90 | 21IA0027REHABILITATION OF NATIONAL ROADS WITH SLIPS COLLAPSE AND LANDSLIDES - SECONDARY ROADS - BILIRAN CIR. ROAD - K1074+204 - K1074+950 (124.56516, 11.61567 TO 124.5629, 11.61083, BRGY. TOMALISTIS, CAIBIRAN, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱47.3M | 100% | Medium risk53 | —-0.080 |
| 91 | 17PL0114CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-WIDENING OF PERMANENT BRIDGES TO MORE THAN 2-LANES-PRIMARY BULANAO BR. 1 (B00974LZ) ALONG KALINGA-CAGAYAN RD. (CALANAN-ENRILE SECTION) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱26.3M | 100% | Medium risk52 | —-0.014 |
| 92 | 18JG0073REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. DUMALINAO-MARGOSATUBIG ROAD (LIMBATONG), STA.K1710+720 - K1710+873, STA.K1710+753 - K1710+950, STA.K1711+017 - K1711+080 & STA.K1710+828 - K1710+936, LIMBA | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱11M | 100% | Medium risk52 | —-0.084 |
| 93 | 18GF0100MALAGYAN - TIGMALAPAD ROAD LEADING TO SINUHOTAN CAVE AND TINAGONG DAGAT LAKE, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱56.2M | 100% | Medium risk52 | —-0.045 |
| 94 | 18JG0072REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. DUMALINAO-MARGOSATUBIG ROAD (MOLUM),STA. K1704+721 - K1705+035, MOLUM, LAPUYAN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱6.8M | 100% | Medium risk52 | —-0.083 |
| 95 | 23IM0058CONSTRUCTION OF SHORE PROTECTION, MAGSAYSAY BOULEVARD, PHASE 3, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱55M | 100% | Medium risk52 | —-0.078 |
| 96 | 22PM0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DANNAL FLOOD CONTROL STRUCTURE, STA. 076+960 - STA. 077+660 (R.S.), ANONAT, PARAC | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱70M | 100% | Medium risk52 | —-0.061 |
| 97 | 23L00229INCREASE IN CARRYING CAPACITY OF THE COLLEGE OF MEDICINE | Region XI | Region XI | On-Going | ₱89.4M | 24% | Medium risk52 | Flagged0.038 |
| 98 | 17PL0234PACKAGE 8: A) SACPAT FLOOD CONTROL ALONG BULANAO CREEK, TABUK CITY B) MATUCNANG FLOOD CONTROL ALONG MATUCNANG CREEK, TABUK CITY, C) CARAA GROUND FLOOD CONTROL, TABUK CITY, D) KASABSABAAN FLOOD CONTROL, TABUK CITY, E) CALAOCAN-LIWAN FLOOD CONTROL, RIZAL, F | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱38M | 100% | Medium risk51 | Flagged0.007 |
| 99 | 17PL0061PACKAGE 8: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES ALONG MT. PROVINCE BDRY. -CALANAN-PINUKPUK-ABBUT ROAD (CALANAN-PINUKPUK SECTION) A). BOGBOG BR. (B02117LZ), B). MAPACO BR. (B02116LZ) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱8.8M | 100% | Medium risk51 | —-0.020 |
| 100 | 21FN0093CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IRIGA CITY RAPID EXIT BYPASS ROAD, CAMARINES SUR (STA. 0+000.00 STA. 0+220.00, STA. 0+270.00 STA. 0+434.50) | Region V | Camarines Sur 5th DEO | Completed | ₱14.1M | 100% | Medium risk51 | —-0.094 |