Contractor dossier
334 projects on file, including joint ventures this contractor is part of.
Total projects
334
Total budget
₱12B
Average progress
95.4%
Completion rate
89.2%
Average risk score
35.4
Medium risk on average, out of 100
Flagged as unusual
30
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 155 | ₱882.8M | 13.2 | 5 | 100.0% |
| Region IV-B | 21 | ₱1.7B | 54.5 | 1 | 100.0% |
| Region VI | 21 | ₱401.8M | 40.1 | 0 | 100.0% |
| Region IV-A | 17 | ₱1.1B | 63.4 | 1 | 92.7% |
| Region VIII | 16 | ₱948.4M | 60.3 | 0 | 98.5% |
| Region VII | 16 | ₱653.3M | 46.7 | 2 | 87.8% |
| Cordillera Administrative Region | 15 | ₱580.6M | 52.8 | 3 | 98.8% |
| Region X | 13 | ₱799.3M | 61.5 | 2 | 91.6% |
| National Capital Region | 11 | ₱1.1B | 46.4 | 4 | 75.4% |
| Region V | 10 | ₱1B | 63.6 | 1 | 73.2% |
| Region XII | 9 | ₱698.6M | 49.6 | 2 | 96.3% |
| Region XI | 8 | ₱863.5M | 81.0 | 5 | 51.9% |
| Region II | 8 | ₱318.7M | 48.4 | 2 | 100.0% |
| Region XIII | 6 | ₱318.3M | 49.0 | 1 | 86.7% |
| Region I | 5 | ₱165.6M | 54.9 | 0 | 100.0% |
| Negros Island Region | 2 | ₱177.7M | 54.3 | 0 | 80.4% |
| Region III | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 172 | ₱2.5B | 15.2 | 11 | 97.0% |
| Roads | 79 | ₱4.4B | 50.7 | 5 | 93.3% |
| Flood Control and Drainage | 48 | ₱2.5B | 53.4 | 3 | 99.0% |
| OTHER | 16 | ₱1.1B | 73.4 | 2 | 94.7% |
| GAA 2025 OO-2 | 6 | ₱805.6M | 92.8 | 3 | 77.5% |
| Bridges | 6 | ₱136.6M | 47.8 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱194M | 93.8 | 5 | 52.6% |
| GAA 2025 OO-1 | 1 | ₱284.1M | 92.8 | 1 | 96.5% |
| Bridges, Roads | 1 | ₱19.8M | 38.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 25KH0074CONSTRUCTION OF ACCESS ROAD, BARANGAY BAIKINGON, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱4.9M | 76% | High risk94 | Flagged0.006 |
| 25F00372ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BASUD RIVER FLOOD MITIGATION STR | Region V | Region V | On-Going | ₱93.6M | 60% | High risk94 | —-0.006 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 25KL0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TAGOLOAN RIVER, MARIBOJOC SECTION, PACKAGE 2, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱144M | 99% | High risk93 | —-0.008 |
| 25LI0017CONSTRUCTION OF REVETMENT ALONG SAUG RIVER LEADING TO LIBUGANON RIVER, (MAYAON BRIDGE SECTION), BARANGAY MAYAON, MONTEVISTA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱105.2M | 84% | High risk92 | —-0.001 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 17IM0016IMPROVEMENT/WIDENING OF LEYTE SAMAR ROAD (VIA GUINTIGUI-AN) (S00001LT), K0901+(-540) TO K0901+(-160), K0901+214 - K0902+208, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱63.1M | 100% | High risk81 | —-0.034 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 23F00283CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF LABO RIVER CONTROL STRUCTURE, SITIO MANDALIG, BRGY. CAGBALOGO, VINZONS, CAMARINES NO | Region V | Region V | Completed | ₱99M | 100% | High risk78 | —-0.022 |
| 17IM0034IMPROVEMENT/WIDENING OF SAN JOSE MANLURIP MACARTHUR PARK ROAD (VIA GUINTIGUI-AN), (S00021LT), K0912+(-270) TO K0912+400, TACLOBAN CITY | Region VIII | Tacloban City DEO | Completed | ₱18.5M | 100% | High risk78 | —-0.029 |
| 25K00429STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS, REGION X, SALAY, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱48M | 18% | High risk75 | Flagged0.008 |
| 23KC0043ROAD WIDENING ALONG SAYRE HIGHWAY - K1443+160-K1443+940, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱67.8M | 100% | High risk75 | —-0.033 |
| 17AE0045CONSTRUCTION OF BARANGAY ROAD AT CADACLAN TO SIBUAN-OTONG, BRGY. CADACLAN, SAN FERNANDO CITY, LA UNION | Region I | La Union 1st DEO | Completed | ₱49.5M | 100% | High risk74 | —-0.026 |
| 18D00068LOCAL PROGRAMS ONSTRUCTION/REPAIR/ REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS LOCAL ROADS AND BRIDGES / LOCAL ROADS IMPROVEMENT / WIDENING OF DAANG HARI ROAD, BACOOR, CAVITE-CHAINAGE 3960-CHAINAGE 9028, CAVITE | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk73 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24O00197REPAIR/REHABILITATION OF BUILDINGS, UP-PGH | National Capital Region | National Capital Region | On-Going | ₱679.1M | 0% | High risk65 | Flagged0.050 |
| 17JG0240CONSTRUCTION OF ONE (1) STOREY - TWO (2) CLASSROOM ICT BUILDING AT JUDGE EDMUNDO PINGA NHS (BLDG. 5), VINCENZO A. SAGUN, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | On-Going | ₱2.8M | 100% | Low risk10 | Flagged0.039 |
| 25NH0119CONSTRUCTION/IMPROVEMENT OF DRAINAGE BARANGAY TELAJE, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱39.2M | 20% | High risk95 | Flagged0.038 |
| 23L00229INCREASE IN CARRYING CAPACITY OF THE COLLEGE OF MEDICINE | Region XI | Region XI | On-Going | ₱89.4M | 24% | Medium risk52 | Flagged0.038 |
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 18H00045LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS, WIDENING OF PUNTA ENGAÑO ROAD, INCLUDING ROW ACQUISITION, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱239.7M | 0% | High risk63 | Flagged0.032 |
| 25LA0051CONSTRUCTION OF (COMPLETION) MULTI-PURPOSE BUILDING, BARANGAY ELIZALDE, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱3M | 36% | High risk89 | Flagged0.030 |
| 24OD0295CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN MAYPAJO HIGH SCHOOL, BRGY. 33, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱39.2M | 14% | Medium risk49 | Flagged0.018 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 17PL0112REPAIR/REHABILITATION/IMPROVEMENT (ADDITIONAL PAVEMENT WIDTH W/ SLOPE PROTECTION & DRAINAGE IMPROVEMENT OF KALINGA - CAGAYAN ROAD, KO498+340 - KO499+800 | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.5M | 100% | Medium risk56 | Flagged0.017 |
| 25PM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-CONSTRUCTION OF ROAD, PARACELIS MALLIG-ROXAS ROAD (DANNAL-CARUPIAN-DAMSITE SECTION)PHASE I, ANONAT, PARACELIS, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 2nd DEO | On-Going | ₱49M | 81% | High risk95 | Flagged0.017 |
| 24O00212INCREASE IN CARRYING CAPACITY OF COLLEGE OF MEDICINE, UP MANILA - UNIVERSITY OF THE PHILIPPINES SYSTEM | National Capital Region | National Capital Region | On-Going | ₱13.1M | 15% | Medium risk45 | Flagged0.014 |
| 17OB0459CONSTRUCTION OF FOUR (4) STOREY, THIRTY SIX (36) CLASSROOM, INDUSTRIAL VALLEY COMPLEX (IVC) NATIONAL HIGH SCHOOL, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱104.9M | 100% | Medium risk49 | Flagged0.013 |
| 25LI0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGUSAN RIVER, PUROK 1, BARANGAY OSMEÑA, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk93 | Flagged0.013 |
| 25M00004CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (PLANG TO PULANGI RIVER SECTION-PHASE I), STA 0+000 - STA 0+715.5, BARANGAY ARINGAY, KABACAN, COTABATO | Region XII | Region XII | On-Going | ₱175.4M | 83% | High risk92 | Flagged0.012 |
| 25LJ0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGUM LIBUGANON RIVER, PACKAGE 1, STO. TOMAS TO B.E. DUJALI SECTION, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱144M | 65% | High risk93 | Flagged0.011 |
| 18H00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - TERTIARY ROADS HERNAN CORTES ST., INCLUDING ROW - (S00367CB), CHAINAGE 000 - CHAINAGE 1374.54 | Region VII | Region VII | On-Going | ₱50M | 5% | Medium risk51 | Flagged0.011 |
| 24F00328CLUSTER XXVIII-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-XXVIII-I: CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCE | Region V | Region V | On-Going | ₱339.3M | 0% | High risk69 | Flagged0.010 |
| 24M00024ROAD WIDENING - MARBEL-ALLAH VALLEY-COTABATO RD - K1795+260 - K1796+012, K1796+152 - K1796+872, K1796+872 - K1797+080, K1810+060 - K1811+956, DATU HOFFER, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱103.4M | 98% | High risk81 | Flagged0.010 |
| 24DG0112CONST. OF MPB, TAGAYTAY SPORTS CAMP, PHASE 2, CRISANTO DELOS REYES AVE. BRGY. KAYBAGAL SOUTH, TAG. C | Region IV-A | Cavite 2nd DEO | On-Going | ₱68.5M | 55% | Medium risk56 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18JG0063CONCRETING OF BRGY. GAWIL FARM TO MARKET ROAD BRGY. GAWIL, KUMALARANG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.032 |
| 177 | 18JG0060CONCRETING OF BRGY. PAG-ASA FARM TO MARKET ROAD BRGY. PAG-ASA, DUMALINAO, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.034 |
| 178 | 18GF0079CONCRETING OF BRGY. LUTUNGAN FMR, BRGY. LUTUNGAN, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱5M | 100% | Medium risk40 | —-0.035 |
| 179 | 18GF0078CONCRETING OF BRGY. BUGA - BALIBAGAN - BONGOL - SAN MIGUEL FMR, BRGYS. BUGA - BALIBAGAN - BONGOL - SAN MIGUEL, IGBARAS, ILOILO, BRGY. BUGA, IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱5M | 100% | Medium risk40 | —-0.036 |
| 180 | 18EB0034BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES, LAWAAN-TAMAYO BR. ALONG MINDORO WEST COASTAL RD (PHASE- II), ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱18.8M | 100% | Medium risk39 | —-0.047 |
| 181 | 20E00084LIP- CONSTRUCTION OF ODIONGAN BY-PASS ROAD (PHASE 4), ODIONGAN, ROMBLON, STA. 2+350.70 - STA. 2+384.30 (INCLUDING APPROACH SLAB) | Region IV-B | Region IV-B | Completed | ₱19.8M | 100% | Medium risk39 | —-0.058 |
| 182 | 17JE0061CONSTRUCTION OF ONE (1) UNIT FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT ZAMBOANGA DEL SUR SPORTS ACADEMY, PAGADIAN CITY | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱27.6M | 100% | Medium risk38 | —-0.011 |
| 183 | 18EB0058CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VIILP-LOCAL ROADS, CONCRETING OF JCT. NATIONAL ROAD TO PULONG BAGTO BRGY. ROAD, BRGY. BALANSAY, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱10.4M | 100% | Medium risk38 | —-0.088 |
| 184 | 17ME0072CONST. OF MUN. GYM. (W/ RAIN WATER COLLECTORS, SOLAR PANELS), BRGY. POB., MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱9M | 100% | Medium risk37 | —-0.052 |
| 185 | 18HN0052CONCRETING OF SITIO TUPAZ FMR, BRGY. LANIPGA, CONSOLACION | Region VII | Cebu 6th DEO | Completed | ₱4.7M | 100% | Medium risk37 | —-0.044 |
| 186 | 18EA0089PACKAGE 16 - A) CONCRETING OF BRGY. MAHINHIN, BOAC, MARINDUQUE, B) CONCRETING OF BRGY. ISOK I, BOAC, MARINDUQUE, C) CONCRETING OF BRGY. CAWIT-TUGOS-DUYAY ROAD, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱18.4M | 100% | Medium risk37 | —-0.088 |
| 187 | 17OA0083CONSTRUCTION OF FOUR(4) STOREY TWELVE (12) CL.RM. SB SAN ROQUE NHS, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱41.7M | 100% | Medium risk35 | —-0.011 |
| 188 | 17OA0098CONST. OF 4 STOREY 12 CL.RM. SB TANGOS NHS, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱41.5M | 100% | Medium risk35 | —-0.015 |
| 189 | 17OA0086CONSTRUCTION OF THREE(3) STOREY FIFTEEN(15) CLRM. SB TONSUYA ES, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱45.5M | 100% | Medium risk35 | —-0.016 |
| 190 | 17ME0021CONST. OF PROVINCIAL LEGISLATIVE BLDG., BRGY. MARIBULAN, ALABEL, SARANGANI | Region XII | Sarangani DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.045 |
| 191 | 21NG0100CONCRETING OF BRGY. ROXAS FMR/BRGY. ROXAS, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱12.1M | 100% | Medium risk34 | —-0.025 |
| 192 | 21NG0101CONCRETING OF SITIO TORIL, BRGY. DAYANO FMR/ BRGY. DAYANO, MAINIT, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱12.1M | 100% | Medium risk33 | —-0.025 |
| 193 | 18GF0105CONSTRUCTION/ REHABILITATION OF TOURISM HIGHWAY 1A BRGY. LA CONSOLACION TO BRGY. ALIMODIAS, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱4.7M | 100% | Medium risk30 | —-0.076 |
| 194 | 25M00086PREVENTIVE MAINTENANCE - COTABATO CITY CIRCUMFERENTIAL RD (WESTERN SECT) - K1849 + (-879) - K1849 + 275, COTABATO CITY | Region XII | Region XII | Completed | ₱46.8M | 100% | Low risk29 | —-0.088 |
| 195 | 25M00087PREVENTIVE MAINTENANCE - COTABATO CITY CIRCUMFERENTIAL RD (WESTERN SECT) - K1854 + (-169) - K1854 + 985, COTABATO CITY | Region XII | Region XII | Completed | ₱46.8M | 100% | Low risk28 | —-0.088 |
| 196 | 24M00052CONSTRUCTION OF RIVERBANK PROTECTION (PHASE I), STA. 0+000.00 - STA. 0+245.00, DATU PIANG, MAGUINDANAO | Region XII | Region XII | Completed | ₱47.3M | 100% | Low risk27 | —-0.073 |
| 197 | 18GI0057CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD, ILOILO - CAPIZ RD (NEW ROUTE) K0017+775.5 - K0018+042 AND K0017+872 - K0018+042 | Region VI | Iloilo 4th DEO | Completed | ₱3.9M | 100% | Low risk23 | —-0.087 |
| 198 | 17GB0199CONSTRUCTION OF 1 STOREY TWO(2) CLASSROOM SCHOOL BUILDING AT PIS-ANAN NHS, SIBALOM, ANTIQUE | Region VI | Antique DEO | Completed | ₱2.5M | 100% | Low risk13 | —-0.006 |
| 199 | 17GB0222CONSTRUCTION OF TECHNICAL-VOCATIONAL-LIVELIHOOD(TVL) LABORATORIES/WORKSHOP FOR SENIOR HIGH SCHOOL BU | Region VI | Antique DEO | Completed | ₱2.6M | 100% | Low risk13 | —-0.015 |
| 200 | 17GB0221CONSTRUCTION OF TECHNICAL-VOCATIONAL-LIVELIHOOD(TVL) LABORATORIES/WORKSHOP FOR SENIOR HIGH SCHOOL BU | Region VI | Antique DEO | Completed | ₱2.6M | 100% | Low risk13 | —-0.015 |