Contractor dossier
161 projects on file, including joint ventures this contractor is part of.
Total projects
161
Total budget
₱10.4B
Average progress
95.7%
Completion rate
87.0%
Average risk score
42.1
Medium risk on average, out of 100
Flagged as unusual
11
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 142 | ₱8.3B | 38.9 | 8 | 97.4% |
| Region IV-A | 7 | ₱442.6M | 72.8 | 0 | 63.4% |
| Central Office | 5 | ₱1.4B | 75.3 | 2 | 91.3% |
| Region II | 3 | ₱209.2M | 55.7 | 1 | 93.7% |
| National Capital Region | 3 | ₱75.4M | 49.0 | 0 | 100.0% |
| Region I | 1 | ₱48.2M | 49.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱3.5B | 40.4 | 1 | 94.7% |
| Flood Control and Drainage | 45 | ₱3.3B | 44.2 | 0 | 98.5% |
| Buildings and Facilities | 41 | ₱978.9M | 28.5 | 1 | 94.2% |
| Bridges | 10 | ₱1.6B | 46.9 | 3 | 95.3% |
| OTHER | 8 | ₱673.9M | 74.6 | 5 | 95.8% |
| GAA 2025 SSP | 3 | ₱188.2M | 91.6 | 0 | 96.4% |
| GAA 2025 OO-1 | 1 | ₱144.7M | 92.2 | 1 | 80.4% |
| GAA 2025 OO-2 | 1 | ₱46.4M | 84.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0084CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT SAMPALOC LAKE CIRCUMFERENTIAL ROAD (DAGATAN BLVD.), SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱65.9M | 89% | High risk93 | —-0.001 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 25DP0048CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY SAN ISIDRO AND BARANGAY MASIIT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱56.5M | 100% | High risk91 | —-0.033 |
| 25DP0054CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY DAYAP TO BARANGAY WAKAT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱65.8M | 100% | High risk90 | —-0.028 |
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 25CG0039FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION ALONG SAPANG BALEN CREEK, (DEL CARMEN - BULAON PORTION), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | High risk85 | —-0.050 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 19C00043REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161.5M | 100% | High risk77 | —-0.002 |
| 20C00047REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161M | 100% | High risk77 | —-0.003 |
| 18C00044REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱174.3M | 100% | High risk77 | —-0.043 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00596CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PUROSE FACILITY, GUAGUA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱48.7M | 0% | High risk76 | —-0.005 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 24CG0310BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDINGS, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱18.9M | 100% | High risk73 | —-0.072 |
| 17DN0120EXPANSION OF ROAD ALONG M.L. QUEZON EXTENSION, BRGY. SAN ROQUE,ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱53.5M | 100% | High risk71 | —-0.039 |
| 19C00053REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF MAASIM RIVER ALONG PULONG GUBAT, MAASIM, CANDABA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱93.6M | 100% | High risk69 | —-0.011 |
| 24C00556ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱32.6M | 100% | High risk69 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00633DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, CANDABA DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱19.6M | 0% | Low risk28 | Flagged0.017 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 23C00094NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱243.2M | 97% | Medium risk55 | Flagged0.003 |
| 22C00111NETWORK DEVELOPMENT PROGRAM-CONST. OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION) PACKAGE 1, PACKAGE 2, PACKAGE 3 AND PACKAGE 4, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱263.7M | 21% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18C00017NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS, BALIWAG-CANDABA-STA. ANA ROAD, INCLUDING ROW, PAMPANGA 4TH LEGISLATIVE DISTRICT, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱116.7M | 100% | Medium risk49 | —-0.078 |
| 52 | 18CG0115REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG MANDASIG (PHASE II), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.7M | 100% | Medium risk49 | —-0.081 |
| 53 | 23C00040ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD (MNR), PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱96.5M | 100% | Medium risk49 | —-0.092 |
| 54 | 17OB0364CONSTRUCTION OF MULTI-LEVEL MULTI PURPOSE BUILDING, BRGY. WESTERN BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.072 |
| 55 | 17OB0368CONSTRUCTION OF FIVE STOREY MULTI-PURPOSE BUILDING AT WESTERN BICUTAN (PROPOSED PINK BUILDING, PARTIAL FUNDING) WESTERN BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.073 |
| 56 | 18CG0089REHABIITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. RITA (PHASE V), SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.7M | 100% | Medium risk44 | —-0.082 |
| 57 | 23CG0146SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL WORKS UPSTREAM PORTION OF DALAQUITAN BRIDGE, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.081 |
| 58 | 23CG0041FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINICIPAL RIVERS - REHABILITATION OF ERODED BANK OF PAMPANGA RIVER AT CANDATING, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk42 | —-0.081 |
| 59 | 18CG0090REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. CATALINA (PHASE I), SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.082 |
| 60 | 18CG0057REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. RITA (PHASE IV), SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.082 |
| 61 | 18CG0056REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. RITA (PHASE III), SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.082 |
| 62 | 24CG0026FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF ERODED RIVER BANK AT CANDATING (PHASE II), ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 63 | 24CG0174FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. CUPANG AND BRGY. GUEMASAN, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.081 |
| 64 | 23CG0141FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF RIVER CHANNEL AND SLOPE PROTECTION OF MAASIM RIVER, PULUNG GUBAT SECTION, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.2M | 100% | Medium risk41 | —-0.079 |
| 65 | 19CG0035CONSTRUCTION OF CONCRETE SLOPE PROTECTION OF STA. CATALINA DIKE, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.4M | 100% | Medium risk41 | —-0.078 |
| 66 | 17CG0005ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4) TERTIARY STO. TOMAS-MINALIN ROAD (MINALIN-MACABEB | Region III | Pampanga 1st DEO | Completed | ₱3.9M | 100% | Medium risk40 | —-0.067 |
| 67 | 18CG0285CONSTRUCTION OF APALIT BYPASS ROAD (PHASE 2), APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱81.6M | 100% | Medium risk39 | —-0.097 |
| 68 | 19CG0098ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MANILA NORTH ROAD - K0057+920 - K0058+140, K0058+275 - K0059+000, K0063+800 - K0064+018 | Region III | Pampanga 1st DEO | Completed | ₱87.5M | 100% | Medium risk39 | —-0.093 |
| 69 | 18CG0281CONSTRUCTION OF APALIT BYPASS ROAD (PHASE I), APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱79.9M | 100% | Medium risk39 | —-0.096 |
| 70 | 18CG0294CONSTRUCTION OF APALIT BYPASS ROAD (PHASE 3), APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱81.7M | 100% | Medium risk39 | —-0.097 |
| 71 | 22CG0146SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - REHABILITATION OF SAN ISIDRO - DAWE BYPASS ROAD, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱86.9M | 100% | Medium risk39 | —-0.093 |
| 72 | 21CG0031CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION (COMPLETION) OF BYPASS AND DIVERSION ROAD, APALIT BYPASS ROAD, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱80.6M | 100% | Medium risk39 | —-0.096 |
| 73 | 22CG0239BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY SUA, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱75.2M | 100% | Medium risk39 | —-0.098 |
| 74 | 17BE0177CONSTRUCTION OF FOUR-STOREY (16 CLASSROOMS) SCHOOL BUILDING STO. TOMAS NATIONAL HIGH SCHOOL, STO. TOMAS, ISABELA | Region II | Isabela 1st DEO | Completed | ₱35.9M | 100% | Medium risk39 | —-0.012 |
| 75 | 17BE0207CONSTRUCTION OF THREE STOREY (12 CLASSROOMS) SCHOOL BUILDING CALANIGAN HS, STO. TOMAS, ISABELA | Region II | Isabela 1st DEO | Completed | ₱28.8M | 100% | Medium risk38 | —-0.014 |