Contractor dossier
161 projects on file, including joint ventures this contractor is part of.
Total projects
161
Total budget
₱10.4B
Average progress
95.7%
Completion rate
87.0%
Average risk score
42.1
Medium risk on average, out of 100
Flagged as unusual
11
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 142 | ₱8.3B | 38.9 | 8 | 97.4% |
| Region IV-A | 7 | ₱442.6M | 72.8 | 0 | 63.4% |
| Central Office | 5 | ₱1.4B | 75.3 | 2 | 91.3% |
| Region II | 3 | ₱209.2M | 55.7 | 1 | 93.7% |
| National Capital Region | 3 | ₱75.4M | 49.0 | 0 | 100.0% |
| Region I | 1 | ₱48.2M | 49.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱3.5B | 40.4 | 1 | 94.7% |
| Flood Control and Drainage | 45 | ₱3.3B | 44.2 | 0 | 98.5% |
| Buildings and Facilities | 41 | ₱978.9M | 28.5 | 1 | 94.2% |
| Bridges | 10 | ₱1.6B | 46.9 | 3 | 95.3% |
| OTHER | 8 | ₱673.9M | 74.6 | 5 | 95.8% |
| GAA 2025 SSP | 3 | ₱188.2M | 91.6 | 0 | 96.4% |
| GAA 2025 OO-1 | 1 | ₱144.7M | 92.2 | 1 | 80.4% |
| GAA 2025 OO-2 | 1 | ₱46.4M | 84.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0084CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT SAMPALOC LAKE CIRCUMFERENTIAL ROAD (DAGATAN BLVD.), SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱65.9M | 89% | High risk93 | —-0.001 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 25DP0048CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY SAN ISIDRO AND BARANGAY MASIIT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱56.5M | 100% | High risk91 | —-0.033 |
| 25DP0054CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY DAYAP TO BARANGAY WAKAT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱65.8M | 100% | High risk90 | —-0.028 |
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 25CG0039FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION ALONG SAPANG BALEN CREEK, (DEL CARMEN - BULAON PORTION), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | High risk85 | —-0.050 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 19C00043REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161.5M | 100% | High risk77 | —-0.002 |
| 20C00047REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161M | 100% | High risk77 | —-0.003 |
| 18C00044REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱174.3M | 100% | High risk77 | —-0.043 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00596CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PUROSE FACILITY, GUAGUA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱48.7M | 0% | High risk76 | —-0.005 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 24CG0310BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDINGS, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱18.9M | 100% | High risk73 | —-0.072 |
| 17DN0120EXPANSION OF ROAD ALONG M.L. QUEZON EXTENSION, BRGY. SAN ROQUE,ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱53.5M | 100% | High risk71 | —-0.039 |
| 19C00053REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF MAASIM RIVER ALONG PULONG GUBAT, MAASIM, CANDABA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱93.6M | 100% | High risk69 | —-0.011 |
| 24C00556ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱32.6M | 100% | High risk69 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00633DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, CANDABA DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱19.6M | 0% | Low risk28 | Flagged0.017 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 23C00094NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱243.2M | 97% | Medium risk55 | Flagged0.003 |
| 22C00111NETWORK DEVELOPMENT PROGRAM-CONST. OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION) PACKAGE 1, PACKAGE 2, PACKAGE 3 AND PACKAGE 4, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱263.7M | 21% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22CG0145SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/ OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF KALSADANG BAYU (MACABEBE - MASANTOL ROAD), MACABEBE AND MASANTOL, P | Region III | Pampanga 1st DEO | Completed | ₱55.9M | 100% | Medium risk38 | —-0.100 |
| 77 | 22CG0171ASSET PRESERVATION PROGRAM: CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN - MACABEBE SECT) K0064+236 - K0064+410, K0067+425 - K0068+075, K0068+155 - K0069+730, K0069+781 - K007 | Region III | Pampanga 1st DEO | Completed | ₱55.6M | 100% | Medium risk38 | —-0.100 |
| 78 | 24CG0062ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CANDABA - SN MIGUEL RD - K0074+497 - K0074+671 | Region III | Pampanga 1st DEO | Completed | ₱65.8M | 100% | Medium risk38 | —-0.101 |
| 79 | 19CG0057CONSTRUCTION OF SLOPE PROTECTION OF PAMPANGA DELTA DIKE, MACABEBE - MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱82.5M | 100% | Medium risk38 | —-0.084 |
| 80 | 20CG0099ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - APALIT - MACABEBE - MASANTOL RD - K0058+060 - K0058+800, K0059+015 - K0059+393, K0061+355 - K0061+550, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱55.1M | 100% | Medium risk38 | —-0.100 |
| 81 | 18CG0212ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN - MACABEBE SECT.), K0064+392 - K0064+719.5, K0067+033 - K0067+099, K0067+160 - K0068+898, K0070+810 - K0072+13 | Region III | Pampanga 1st DEO | Completed | ₱48.8M | 100% | Medium risk36 | —-0.103 |
| 82 | 24CG0080ASSET PRESERVATION PROGRAM: CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN - MACABEBE SECT) - K0064+748 -K0067+080 | Region III | Pampanga 1st DEO | Completed | ₱51.3M | 100% | Medium risk36 | —-0.102 |
| 83 | 20CH0079CONSTRUCTION/REHABILITATION OF THE PAMPANGA PROVINCIAL DIALYSIS CENTER INCLDING SITE DEVELOPMENT IN SAN MATIAS, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱28.5M | 100% | Medium risk36 | —-0.099 |
| 84 | 22CG0029SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SAN JUAN BRIDGE, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱64.3M | 100% | Medium risk36 | —-0.062 |
| 85 | 20CG0019REHABILITATION OF PAMPANGA RIVER ALONG STA. CRUZ (PHASE I), SAN SIMON, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱87M | 100% | Medium risk36 | —-0.083 |
| 86 | 23CG0183BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES - MAPALAD BR. (B01483LZ) ALONG JOSE ABAD SANTOS AVE (JASA) | Region III | Pampanga 1st DEO | Completed | ₱59.4M | 100% | Medium risk36 | —-0.062 |
| 87 | 21CG0015ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MANILA NORTH RD - K0061+454 - K0061+1114, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱50.6M | 100% | Medium risk36 | —-0.103 |
| 88 | 24CG0300BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE FACILITY (MUNICIPAL SPORTS CENTER), SAN AGUSTIN, SAN SIMON, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱38.3M | 100% | Medium risk35 | —-0.101 |
| 89 | 22CG0043FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK ALONG BARANGAY SAN JUAN, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱83.8M | 100% | Medium risk35 | —-0.085 |
| 90 | 24CG0173FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT WALL (PAMPANGA DELTA DEVELOPMENT PROJECT), BARANGAY CAPALANGAN, PHASE II, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱74.9M | 100% | Medium risk35 | —-0.088 |
| 91 | 23CG0001FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AT PAMPANGA DELTA DIKES ALONG LEFT BANK, CONSUELO (PHASE I), MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱47.3M | 100% | Medium risk35 | —-0.089 |
| 92 | 20CH0078CONSTRUCTION/REHABILITATION OF LUBAO HEALTH CENTER INCLUDING SITE DEVELOPMENT IN STA. CATALINA, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱19M | 100% | Medium risk35 | —-0.103 |
| 93 | 24CG0018FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TELACSAN - TACASAN RIVER, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱74.5M | 100% | Medium risk35 | —-0.081 |
| 94 | 18CG0473CONSTRUCTION OF THREE (3) UNITS, THREE(3) STOREY, NINE (9), CLASSROOM SCHOOL BUILDING AT MACABEBE HS, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱82.2M | 100% | Medium risk35 | —-0.022 |
| 95 | 18CG0472CONSTRUCTION OF 3 UNITS - FOUR (4)- STOREY, EIGHT(8) CLASSROOM AND 1 UNIT - TWO (2)- STOREY, SIX (6) CLASSROOM SCHOOL BUILDING AT SAN MATIAS NHS, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱69.8M | 100% | Medium risk34 | —-0.025 |
| 96 | 23CG0117ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SN VICENTE - APALIT RD - K0055+(-449) - K0056+174 | Region III | Pampanga 1st DEO | Completed | ₱42.8M | 100% | Medium risk33 | —-0.104 |
| 97 | 20CG0212CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱34.4M | 100% | Medium risk33 | —-0.104 |
| 98 | 24CG0158ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - APALIT - MACABEBE - MASANTOL RD - K0057+094 - K0057+665 | Region III | Pampanga 1st DEO | Completed | ₱32.8M | 100% | Medium risk33 | —-0.105 |
| 99 | 20CG0234CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱32.6M | 100% | Medium risk33 | —-0.104 |
| 100 | 18CG0471CONSTRUCTION OF 3 UNITS - FOUR (4)- STOREY, EIGHT(8) CLASSROOM SCHOOL BUILDING AT MACABEBE CENTRAL ES, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱57.9M | 100% | Medium risk33 | —-0.042 |