Contractor dossier
161 projects on file, including joint ventures this contractor is part of.
Total projects
161
Total budget
₱10.4B
Average progress
95.7%
Completion rate
87.0%
Average risk score
42.1
Medium risk on average, out of 100
Flagged as unusual
11
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 142 | ₱8.3B | 38.9 | 8 | 97.4% |
| Region IV-A | 7 | ₱442.6M | 72.8 | 0 | 63.4% |
| Central Office | 5 | ₱1.4B | 75.3 | 2 | 91.3% |
| Region II | 3 | ₱209.2M | 55.7 | 1 | 93.7% |
| National Capital Region | 3 | ₱75.4M | 49.0 | 0 | 100.0% |
| Region I | 1 | ₱48.2M | 49.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱3.5B | 40.4 | 1 | 94.7% |
| Flood Control and Drainage | 45 | ₱3.3B | 44.2 | 0 | 98.5% |
| Buildings and Facilities | 41 | ₱978.9M | 28.5 | 1 | 94.2% |
| Bridges | 10 | ₱1.6B | 46.9 | 3 | 95.3% |
| OTHER | 8 | ₱673.9M | 74.6 | 5 | 95.8% |
| GAA 2025 SSP | 3 | ₱188.2M | 91.6 | 0 | 96.4% |
| GAA 2025 OO-1 | 1 | ₱144.7M | 92.2 | 1 | 80.4% |
| GAA 2025 OO-2 | 1 | ₱46.4M | 84.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0084CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT SAMPALOC LAKE CIRCUMFERENTIAL ROAD (DAGATAN BLVD.), SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱65.9M | 89% | High risk93 | —-0.001 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 25DP0048CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY SAN ISIDRO AND BARANGAY MASIIT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱56.5M | 100% | High risk91 | —-0.033 |
| 25DP0054CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY DAYAP TO BARANGAY WAKAT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱65.8M | 100% | High risk90 | —-0.028 |
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 25CG0039FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION ALONG SAPANG BALEN CREEK, (DEL CARMEN - BULAON PORTION), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | High risk85 | —-0.050 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 19C00043REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161.5M | 100% | High risk77 | —-0.002 |
| 20C00047REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161M | 100% | High risk77 | —-0.003 |
| 18C00044REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱174.3M | 100% | High risk77 | —-0.043 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00596CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PUROSE FACILITY, GUAGUA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱48.7M | 0% | High risk76 | —-0.005 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 24CG0310BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDINGS, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱18.9M | 100% | High risk73 | —-0.072 |
| 17DN0120EXPANSION OF ROAD ALONG M.L. QUEZON EXTENSION, BRGY. SAN ROQUE,ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱53.5M | 100% | High risk71 | —-0.039 |
| 19C00053REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF MAASIM RIVER ALONG PULONG GUBAT, MAASIM, CANDABA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱93.6M | 100% | High risk69 | —-0.011 |
| 24C00556ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱32.6M | 100% | High risk69 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00633DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, CANDABA DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱19.6M | 0% | Low risk28 | Flagged0.017 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 23C00094NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱243.2M | 97% | Medium risk55 | Flagged0.003 |
| 22C00111NETWORK DEVELOPMENT PROGRAM-CONST. OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION) PACKAGE 1, PACKAGE 2, PACKAGE 3 AND PACKAGE 4, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱263.7M | 21% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20CG0093ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN TAIL DIKE SECT) - K0068+(-800) - K0068+(-700), K0069+105-K0069+989, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk33 | —-0.102 |
| 102 | 20CG0078ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - SN SIMON - BALIWAG RD - K0065+800 - K0066+000, K0066+894 - K0067+550, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk33 | —-0.104 |
| 103 | 23CG0046ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BAHAY PARE - SN LUIS - STO DOMINGO RD - K0059 + (-1026) - K0059 + (-1009), K0064+054 - K0064+069, K0065+185 - K0065+511, K0066+1062 - K0068+049, | Region III | Pampanga 1st DEO | Completed | ₱45.1M | 100% | Medium risk33 | —-0.099 |
| 104 | 23CG0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARIT (CANDABA) - SAN JUAN (SAN LUIS) BY-PASS ROAD, BARANGAY BARI | Region III | Pampanga 1st DEO | Completed | ₱41.9M | 100% | Medium risk33 | —-0.099 |
| 105 | 24CG0068ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - STO. TOMAS - MINALIN RD (MINALIN-MACABEBE SECT) - K0064+748 - K0065+393.50, K0065+740 - K0066+037.60 | Region III | Pampanga 1st DEO | Completed | ₱39.4M | 100% | Medium risk33 | —-0.102 |
| 106 | 20CG0129ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BALIWAG - CANDABA - STA. ANA RD - K0067+571 - K0067+653, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk33 | —-0.103 |
| 107 | 18CG0208CONSTRUCTION/UPGRADING/REHABILITATION OF PRIMARY ROADS, MANILA NORTH ROAD - K0059+000 - K0060+084, K0060+096 - K0061+308, K0061+360 - K0061+410, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱45M | 100% | Medium risk33 | —-0.102 |
| 108 | 18CG0119CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION CONSTRUCTION OF SLOPE PROTECTION OF PAMPANGA DELTA DIKES, MACABEBE & MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Medium risk33 | —-0.091 |
| 109 | 22CG0108SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CADUANG TETE MAIN ROAD, BARANGAY CADUANG TETE, MACABEBE, PAMPANG | Region III | Pampanga 1st DEO | Completed | ₱18.7M | 100% | Medium risk32 | —-0.106 |
| 110 | 24CG0060ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CANDABA - SN MIGUEL RD - K0074+423 - K0074+497 | Region III | Pampanga 1st DEO | Completed | ₱29.3M | 100% | Medium risk32 | —-0.104 |
| 111 | 23CG0138ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CANDABA - SN MIGUEL RD - K0074+304 - K0074+371 | Region III | Pampanga 1st DEO | Completed | ₱29.1M | 100% | Medium risk32 | —-0.105 |
| 112 | 24CG0140ASSET PRESERVATION PROGRAM: CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BAHAY PARE - SN LUIS - STO DOMINGO RD - K0070 + 900 - K0072 + 328, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱30.5M | 100% | Medium risk32 | —-0.105 |
| 113 | 24C00552ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-TULAOC-STO. DOMINGO ROAD-CHAINAGE O-CHAINAGE 183, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱19.3M | 100% | Medium risk32 | —-0.106 |
| 114 | 22CG0250BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF STA. LUCIA ANAC MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. STA. LUCIA ANAC, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.6M | 100% | Medium risk32 | —-0.107 |
| 115 | 20CG0262LOCAL INFRASTRUCTURE PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES -REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE BUILDING (COVENTION CENTER), BRGY. LOURDES, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.1M | 100% | Medium risk32 | —-0.104 |
| 116 | 18CC0001PREVENTIVE MAINTENANCE - BIGAA-PLARIDEL VIA BULACAN & MALOLOS ROAD K0032+000 TO K0033+000 GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱7.3M | 100% | Medium risk32 | —-0.103 |
| 117 | 19CG0136CONSTRUCTION OF 4 - CLASSROOM SCHOOL BUILDING SAN LUIS CS ANNEX, STA. LUCIA, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.6M | 100% | Medium risk31 | —-0.107 |
| 118 | 18CG0470CONSTRUCTION OF 2 UNITS TWO(2) STOREY, FOUR (4) AND 2 UNITS TWO (2) STOREY, SIX (6) CLASSROOM SCHOOL BUILDING AT STA. LUCIA MATUA ES, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱48.8M | 100% | Medium risk31 | —-0.043 |
| 119 | 18CG0373REHABILITATION OF ERODED BANKS ALONG PAMPANGA RIVER APALIT SAN SIMON, SAN LUIS & CANDABA, PAMPANGA, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱47M | 100% | Medium risk31 | —-0.092 |
| 120 | 23CG0033BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES - CANIUPAN BR. 3 (B01491LZ) ALONG BAHAY PARE - SAN LUIS - STO. DOMINGO RD. | Region III | Pampanga 1st DEO | Completed | ₱37.8M | 100% | Medium risk30 | —-0.065 |
| 121 | 21CG0108BRIDGE PROGRAM: REHABILIATION/MAJOR REPAIR OF PERMANENT BRIDGES - SAN AGUSTIN BR. (BOMBA BR.) (B00145LZ) ALONG BALIWAG - CANDABA - STA. ANA RD., CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.1M | 100% | Medium risk30 | —-0.066 |
| 122 | 21CG0107BRIDGE PROGRAM: REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CADUANG TETE BR. (B01462LZ) ALONG APALIT - MACABEBE - MASANTOL RD., MACABABE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14.1M | 100% | Medium risk30 | —-0.066 |
| 123 | 19CG0166CONSTRUCTION OF ROAD AND CONCRETE SLOPE PROTECTION (LAND SIDE) OF TAIL DIKE, STO. TOMAS - SAN FERNANDO, PAMPANGA (STO. TOMAS SECTION), STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | Low risk29 | —-0.090 |
| 124 | 19CG0053CONSTRUCTION OF CONCRETE SLOPE PROTECTION OF TAIL DIKE (STO. TOMAS - MINALIN SECTION), STO. TOMAS AND MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.093 |
| 125 | 18CG0040CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION / IMPROVEMENT OF SAPANG ARE CREEK STA. 0+000 - STA. 1+300 AT APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱32.2M | 100% | Low risk29 | —-0.094 |