Contractor dossier
161 projects on file, including joint ventures this contractor is part of.
Total projects
161
Total budget
₱10.4B
Average progress
95.7%
Completion rate
87.0%
Average risk score
42.1
Medium risk on average, out of 100
Flagged as unusual
11
6.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 142 | ₱8.3B | 38.9 | 8 | 97.4% |
| Region IV-A | 7 | ₱442.6M | 72.8 | 0 | 63.4% |
| Central Office | 5 | ₱1.4B | 75.3 | 2 | 91.3% |
| Region II | 3 | ₱209.2M | 55.7 | 1 | 93.7% |
| National Capital Region | 3 | ₱75.4M | 49.0 | 0 | 100.0% |
| Region I | 1 | ₱48.2M | 49.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 52 | ₱3.5B | 40.4 | 1 | 94.7% |
| Flood Control and Drainage | 45 | ₱3.3B | 44.2 | 0 | 98.5% |
| Buildings and Facilities | 41 | ₱978.9M | 28.5 | 1 | 94.2% |
| Bridges | 10 | ₱1.6B | 46.9 | 3 | 95.3% |
| OTHER | 8 | ₱673.9M | 74.6 | 5 | 95.8% |
| GAA 2025 SSP | 3 | ₱188.2M | 91.6 | 0 | 96.4% |
| GAA 2025 OO-1 | 1 | ₱144.7M | 92.2 | 1 | 80.4% |
| GAA 2025 OO-2 | 1 | ₱46.4M | 84.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DP0084CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT SAMPALOC LAKE CIRCUMFERENTIAL ROAD (DAGATAN BLVD.), SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱65.9M | 89% | High risk93 | —-0.001 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 25DP0048CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY SAN ISIDRO AND BARANGAY MASIIT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱56.5M | 100% | High risk91 | —-0.033 |
| 25DP0054CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY DAYAP TO BARANGAY WAKAT, CALAUAN, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱65.8M | 100% | High risk90 | —-0.028 |
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 25CG0039FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION ALONG SAPANG BALEN CREEK, (DEL CARMEN - BULAON PORTION), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.4M | 100% | High risk85 | —-0.050 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 19C00043REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161.5M | 100% | High risk77 | —-0.002 |
| 20C00047REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱161M | 100% | High risk77 | —-0.003 |
| 18C00044REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱174.3M | 100% | High risk77 | —-0.043 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00596CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PUROSE FACILITY, GUAGUA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱48.7M | 0% | High risk76 | —-0.005 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 24CG0310BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDINGS, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱18.9M | 100% | High risk73 | —-0.072 |
| 17DN0120EXPANSION OF ROAD ALONG M.L. QUEZON EXTENSION, BRGY. SAN ROQUE,ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱53.5M | 100% | High risk71 | —-0.039 |
| 19C00053REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF MAASIM RIVER ALONG PULONG GUBAT, MAASIM, CANDABA, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱93.6M | 100% | High risk69 | —-0.011 |
| 24C00556ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱32.6M | 100% | High risk69 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Region II | Isabela 4th DEO | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 25CG0176CONCRETING OF CADUANG TETE TO BRGY. SAPLAD DAVID FARM-TO-MARKET ROAD, BRGY. CADUANG TETE AND BRGY. SAPLAD DAVID, MACABEBE PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 99% | High risk79 | Flagged0.029 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 22C00022NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY(, MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 100% | High risk76 | Flagged0.023 |
| 23C00041NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 92% | High risk76 | Flagged0.021 |
| 24C00633DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, CANDABA DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱19.6M | 0% | Low risk28 | Flagged0.017 |
| 25C00071NETWORK DEVELOPMENT PROGRAM-CONST. OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGE INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORTH ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱144.7M | 80% | High risk92 | Flagged0.011 |
| 24C00021NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES, STO. TOMAS INTERCHANGES INCLUDING ROADS AND BRIDGES FROM NLEX (NORTH LUZON EXPRESSWAY)-MANILA NORT ROAD, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱115.8M | 94% | High risk76 | Flagged0.007 |
| 23C00094NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱243.2M | 97% | Medium risk55 | Flagged0.003 |
| 22C00111NETWORK DEVELOPMENT PROGRAM-CONST. OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION) PACKAGE 1, PACKAGE 2, PACKAGE 3 AND PACKAGE 4, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱263.7M | 21% | Medium risk55 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21CG0262LOCAL INFRASTRUCTURE PROGRAM: FLOOD CONTROL AND DRAINAGE - DRAINAGE/ PROTECTION WORKS - REHABILITATION OF TABUN CHECKGATE AND CONCRETE PAVEMENT WITH SLOPE PROTECTION, BARANGAY SAN ROQUE (SAN LUIS) AND BARANGAY TALANG (CANDABA), SAN LUIS AND CANDABA, PAMPA | Region III | Pampanga 1st DEO | Completed | ₱28.2M | 100% | Low risk29 | —-0.093 |
| 127 | 18CG0448CONSTRUCTION OF THREE-STOREY, FIFTEEN (15) CLASSROOM SCHOOL BUILDING AT BEBE ANAC ES, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱34M | 100% | Low risk29 | —-0.046 |
| 128 | 20CG0016REHABILITATION OF PAMPANGA RIVER STA. RITA, SAN LUIS, PAMPANG | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.094 |
| 129 | 18CG0469CONSTRUCTION OF FOUR-STOREY, TWENTY(20) CLASSROOMS SCHOOL BUILDING - STA. MARIA HIGH SCHOOL, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱42.6M | 100% | Low risk29 | —-0.030 |
| 130 | 22CG0055SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT CABALANTIAN - MESALIPIT ROAD, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.093 |
| 131 | 22CG0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM AT CABALANTIAN AND SAN VICENTE, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37.2M | 100% | Low risk29 | —-0.092 |
| 132 | 19CG0016CONSTRUCTION/ REHABILITATION OF SAN ANTONIO - CONCEPCION CREEK, BACOLOR, PAMPANGA (R.A. 9506- BACOLOR REHABILITATION ACT) | Region III | Pampanga 1st DEO | Completed | ₱18.5M | 100% | Low risk29 | —-0.092 |
| 133 | 18CG0259CONSTRUCTION OF LINED CANAL AT TINAJERO, STA. INES, SAN VICENTE AND CABAMBANGAN, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.093 |
| 134 | 20CG0098FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF DEL CARMEN/ BALIMBING CREEK, STA. 0+988 TO STA. 2+063, SAN FERNANDO CITY, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱44.1M | 100% | Low risk29 | —-0.091 |
| 135 | 24CG0091SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT SAPANG BALEN (DEL CARMEN - BULAON PORTION), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.092 |
| 136 | 18CG0025DREDGING/EXCAVATION WITH SLOPE PROTECTION AT DIVISORIA-SAN MIGUEL CREEK (STA.0+000 - STA. 1+200) MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱22.9M | 100% | Low risk28 | —-0.092 |
| 137 | 24C00633DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS, CANDABA DISTRICT HOSPITAL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱19.6M | 0% | Low risk28 | Flagged0.017 |
| 138 | 18CG0442CONSTRUCTION OF THREE(3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT SAN MATIAS ES, SANTO TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱31.9M | 100% | Low risk28 | —-0.047 |
| 139 | 18CG0441CONSTRUCTION OF THREE(3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT SAN BARTOLOME ES, SANTO TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱31.9M | 100% | Low risk28 | —-0.047 |
| 140 | 18CG0440CONSTRUCTION OF THREE(3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT POBLACION HS, SANTO TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱31.9M | 100% | Low risk28 | —-0.047 |
| 141 | 23CG0284CONSTRUCTION OF ONE (1) STOREY-TWO (2) CLASSROOM SCHOOL BUILDING AT MASANTOL HS (STA. LUCIA NHS, MASANTOL), MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.7M | 100% | Low risk25 | —-0.055 |
| 142 | 23CG0286CONSTRUCTION OF ONE (1) STOREY-TWO (2) CLASSROOM SCHOOL BUILDING AT PASIG NHS, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.7M | 100% | Low risk25 | —-0.053 |
| 143 | 18CG0169CONSTRUCTION OF TWO-STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT TALANG ES, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱8.4M | 100% | Low risk25 | —-0.054 |
| 144 | 21CG0259CONSTRUCTION/COMPLETION OF (3 UNITS 4STY8CL) MACABEBE ELEMENTARY SCHOOL, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.8M | 100% | Low risk25 | —-0.055 |
| 145 | 23CG0283CONSTRUCTION OF ONE (1) STOREY-TWO (2) CLASSROOM SCHOOL BUILDING AT STA. RITA ES, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.7M | 100% | Low risk25 | —-0.054 |
| 146 | 22CG0144CONCRETING OF BRGY. SAN RAFAEL FMR, BRGY SAN RAFAEL, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱9.6M | 100% | Low risk24 | —-0.046 |
| 147 | 21CG0172CONCRETING OF BRGY. SAGRADA FMR BRGY. SAGRADA, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Terminated | ₱2.4M | 100% | Low risk24 | —-0.011 |
| 148 | 20CG0152LOCAL INFRASTRUCTURE PROGRAM: MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN JUAN, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱4.7M | 100% | Low risk16 | —-0.108 |
| 149 | 22CG0248BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MORAS DELA PAZ BARANGAY ROAD, BRGY. MORAS DELA PAZ, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱4.7M | 100% | Low risk14 | —-0.105 |
| 150 | 22CG0231SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF SAN MIGUEL, SAN SIMON - CANSINALA, APALIT ROAD (SAN MIGUEL, SAN | Region III | Pampanga 1st DEO | Completed | ₱4.7M | 100% | Low risk13 | —-0.104 |