Contractor dossier
100 projects on file, including joint ventures this contractor is part of.
Total projects
100
Total budget
₱6B
Average progress
83.9%
Completion rate
73.0%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
5
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 91 | ₱5.5B | 53.7 | 4 | 85.5% |
| Region IV-B | 8 | ₱417.5M | 44.9 | 0 | 63.1% |
| Negros Island Region | 1 | ₱96.5M | 80.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 37 | ₱2.3B | 52.4 | 1 | 81.5% |
| Roads | 34 | ₱2.1B | 52.4 | 0 | 92.4% |
| Buildings and Facilities | 19 | ₱711.1M | 49.4 | 1 | 78.8% |
| Bridges | 5 | ₱284.6M | 54.2 | 0 | 85.5% |
| GAA 2025 SSP | 2 | ₱283.5M | 95.6 | 2 | 2.2% |
| OTHER | 2 | ₱289.5M | 77.6 | 1 | 100.0% |
| Water Provision and Storage | 1 | ₱39.2M | 48.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
| 22D00110CONSTRUCTION OF BY - PASS ROAD AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk75 | —-0.007 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 22D00089CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVER (UPSTREAM), BARANGAY TAYUMAN, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.059 |
| 24D00194CONSTRUCTION OF BYPASS ROAD, PACKAGE 2, AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.9M | 84% | High risk65 | —-0.047 |
| 21D00092REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES - RECONSTRUCTION OF COLLAPSED PAVEMENT AND ROADSIDE STRUCTURES AT BATANGAS TABANGAO LOBO ROAD, K0142 + 640 - K0143 + 140, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 21D00093BATANGAS - TABANGAO - LOBO ROAD, K0143 + 140 - K0145 + 483, BATANGAS CITY, AND REPAIR / RAHABILITATION OF FLOOD CONTROL STRUCTURES ALONG BATANGAS - TABANGAO - LOBO ROAD, K0145 + 489 - K0145 + 663, K0146 + 000 - K0146 + 110 | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 25DE0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF LIBJO - DUMUKLAY CONDE RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 1% | High risk65 | —-0.025 |
| 25DE0052ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVER CONTROL PROJECT, BARA | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 11% | High risk65 | —-0.017 |
| 25DE0043ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 3, BARANGAY LIBJO, BATAN | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.5M | 9% | High risk65 | —-0.017 |
| 25DE0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 1, BARANGAY DELA PAZ PRO | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 64% | High risk65 | —-0.033 |
| 23D00060CONSTRUCTION OF REVETMENT ALONG BATAAN BRIDGE, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.1M | 95% | High risk65 | —-0.024 |
| 22D00006CONSTRUCTION OF MISSING LINKS / NEW ROADSLOBO - MALABRIGO - LAIYA - SAN JUAN ROAD, PACKAGE I, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱159.2M | 12% | High risk65 | —-0.000 |
| 24DE0136CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BANALO, LOBO, BATANGAS (PACKAGE 2) | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.075 |
| 24D00164FY 2024 DPWH INFRASTRUCTURE PROGRAM -ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE VIII, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.6M | 31% | High risk64 | —-0.006 |
| 23DE0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LOBO RIVER, NAGTALU | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 23DE0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) (PHASE V), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱148.5M | 23% | High risk64 | —-0.004 |
| 22D00063FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BYPASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱99.4M | 100% | High risk63 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24D00308CONSTRUCTION OF DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT REGION 4A - REGIONAL OFFICE, MARAWOY, LIPA CITY, BATANGAS (PACKAGE B) | Region IV-A | Region IV-A | On-Going | ₱145.5M | 0% | Medium risk58 | Flagged0.054 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24D00308CONSTRUCTION OF DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT REGION 4A - REGIONAL OFFICE, MARAWOY, LIPA CITY, BATANGAS (PACKAGE B) | Region IV-A | Region IV-A | On-Going | ₱145.5M | 0% | Medium risk58 | Flagged0.054 |
| 27 | 24D00180CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱48.5M | 32% | Medium risk55 | —-0.039 |
| 28 | 23D00154CONSTRUCTION OF MULTIPURPOSE FACILITIES (DSWD) MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱47.3M | 42% | Medium risk55 | —-0.032 |
| 29 | 22DD0066ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA-BATANGAS RD - K0078 + 276 - K0079 + 396, K0082 + 778 | Region IV-A | Batangas 4th DEO | Completed | ₱84.3M | 100% | Medium risk54 | —-0.100 |
| 30 | 25DE0112ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BATANGAS CITY-SAN PASCUAL-BAUAN DIVERSION ROAD (SECTION 6), BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱70.9M | 48% | Medium risk54 | —-0.056 |
| 31 | 22D00061FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE I, BATANGAS | Region IV-A | Region IV-A | Completed | ₱60.8M | 100% | Medium risk54 | —-0.092 |
| 32 | 22DE0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING) (PHASE 4), POBLACION, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk54 | —-0.084 |
| 33 | 25DE0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE AT EASTERN LIBJO, NEW SAN VICENTE UPSTREAM, (BESIDES D | Region IV-A | Batangas 2nd DEO | On-Going | ₱58.2M | 28% | Medium risk53 | —-0.029 |
| 34 | 22DE0033ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱79.1M | 100% | Medium risk53 | —-0.069 |
| 35 | 21DE0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BARANGAY FABRICA, LOBO RIVE | Region IV-A | Batangas 2nd DEO | Completed | ₱86.9M | 100% | Medium risk53 | —-0.077 |
| 36 | 20DE0103LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG LOBO RIVER (DOWNSTREAM), FABRICA, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱79.2M | 100% | Medium risk53 | —-0.082 |
| 37 | 24DE0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PACKAGE 1, BRGY. TALAHIB PAN | Region IV-A | Batangas 2nd DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.082 |
| 38 | 22DE0034ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱78.5M | 100% | Medium risk53 | —-0.078 |
| 39 | 21DE0040ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION/REHABILITATION OF LOBO RIVER FLO | Region IV-A | Batangas 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.085 |
| 40 | 24DE0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALO | Region IV-A | Batangas 2nd DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.082 |
| 41 | 21E00053CONSTRUCTION OF NAUJAN-POLA BYPASS ROAD-MELGAR B TO MONTELAGO TO MONTEMAYOR, STA. 0+000.00-STA. 2+040.00, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.081 |
| 42 | 20DE0125LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF THE LOBO MUNICIPAL HALL PHASE 1, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk53 | —-0.093 |
| 43 | 21DE0057LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL - PHASE 2), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk53 | —-0.095 |
| 44 | 22DD0180CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF TAYSAN - ROSARIO ROAD, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.104 |
| 45 | 22DE0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. POBLACION, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱29.7M | 100% | Medium risk51 | —-0.084 |
| 46 | 24DE0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MUNICIPAL BUILDING, LOBO, BATANGAS (PHASE VI) | Region IV-A | Batangas 2nd DEO | On-Going | ₱37.6M | 0% | Medium risk51 | —-0.027 |
| 47 | 24DE0168CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BALATBAT, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.104 |
| 48 | 20DE0134CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF PASTOR ROAD INCLUDING DRAINAGE, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.101 |
| 49 | 22DE0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 50 | 24DE0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO SAN VICENTE (UPSTREAM), BRGY. LIBJO, BATANGAS C | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.087 |