Contractor dossier
100 projects on file, including joint ventures this contractor is part of.
Total projects
100
Total budget
₱6B
Average progress
83.9%
Completion rate
73.0%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
5
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 91 | ₱5.5B | 53.7 | 4 | 85.5% |
| Region IV-B | 8 | ₱417.5M | 44.9 | 0 | 63.1% |
| Negros Island Region | 1 | ₱96.5M | 80.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 37 | ₱2.3B | 52.4 | 1 | 81.5% |
| Roads | 34 | ₱2.1B | 52.4 | 0 | 92.4% |
| Buildings and Facilities | 19 | ₱711.1M | 49.4 | 1 | 78.8% |
| Bridges | 5 | ₱284.6M | 54.2 | 0 | 85.5% |
| GAA 2025 SSP | 2 | ₱283.5M | 95.6 | 2 | 2.2% |
| OTHER | 2 | ₱289.5M | 77.6 | 1 | 100.0% |
| Water Provision and Storage | 1 | ₱39.2M | 48.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
| 22D00110CONSTRUCTION OF BY - PASS ROAD AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk75 | —-0.007 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 22D00089CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVER (UPSTREAM), BARANGAY TAYUMAN, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.059 |
| 24D00194CONSTRUCTION OF BYPASS ROAD, PACKAGE 2, AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.9M | 84% | High risk65 | —-0.047 |
| 21D00092REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES - RECONSTRUCTION OF COLLAPSED PAVEMENT AND ROADSIDE STRUCTURES AT BATANGAS TABANGAO LOBO ROAD, K0142 + 640 - K0143 + 140, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 21D00093BATANGAS - TABANGAO - LOBO ROAD, K0143 + 140 - K0145 + 483, BATANGAS CITY, AND REPAIR / RAHABILITATION OF FLOOD CONTROL STRUCTURES ALONG BATANGAS - TABANGAO - LOBO ROAD, K0145 + 489 - K0145 + 663, K0146 + 000 - K0146 + 110 | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 25DE0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF LIBJO - DUMUKLAY CONDE RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 1% | High risk65 | —-0.025 |
| 25DE0052ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVER CONTROL PROJECT, BARA | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 11% | High risk65 | —-0.017 |
| 25DE0043ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 3, BARANGAY LIBJO, BATAN | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.5M | 9% | High risk65 | —-0.017 |
| 25DE0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 1, BARANGAY DELA PAZ PRO | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 64% | High risk65 | —-0.033 |
| 23D00060CONSTRUCTION OF REVETMENT ALONG BATAAN BRIDGE, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.1M | 95% | High risk65 | —-0.024 |
| 22D00006CONSTRUCTION OF MISSING LINKS / NEW ROADSLOBO - MALABRIGO - LAIYA - SAN JUAN ROAD, PACKAGE I, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱159.2M | 12% | High risk65 | —-0.000 |
| 24DE0136CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BANALO, LOBO, BATANGAS (PACKAGE 2) | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.075 |
| 24D00164FY 2024 DPWH INFRASTRUCTURE PROGRAM -ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE VIII, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.6M | 31% | High risk64 | —-0.006 |
| 23DE0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LOBO RIVER, NAGTALU | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 23DE0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) (PHASE V), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱148.5M | 23% | High risk64 | —-0.004 |
| 22D00063FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BYPASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱99.4M | 100% | High risk63 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24D00308CONSTRUCTION OF DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT REGION 4A - REGIONAL OFFICE, MARAWOY, LIPA CITY, BATANGAS (PACKAGE B) | Region IV-A | Region IV-A | On-Going | ₱145.5M | 0% | Medium risk58 | Flagged0.054 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23DE0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. TALAHIB PANDAYAN, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.087 |
| 52 | 22DE0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. LAGADLARIN DOWNSTREAM, LOBO, | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 53 | 24DE0040ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER BANK PROTECTION, BARANGAY POBLACION, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 54 | 22DE0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL PROJECT AT BRGY. OLO-OLO UPSTREAM, LOBO, BATANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.076 |
| 55 | 22DE0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO ILAYA, MABILOG NA BUNDOK, LOB | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 56 | 22DE0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY SOLOC DOWNSTREAM, LOBO, BA | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 57 | 22DE0059CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC FRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. JAYBANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 58 | 24ED0082CONSTRUCTION/IMPROVEMENT OF CALUCMOY BRIDGE, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱57.9M | 96% | Medium risk49 | —-0.019 |
| 59 | 21ED0202CONSTRUCTION OF BYPASS ROAD, TABINAY - POBLACION STO. NINO - BALATERO - SAN ISIDRO LEADING TO WHITE BEACH, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱67.5M | 100% | Medium risk48 | —-0.084 |
| 60 | 23DE0151CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, 1. CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY JAYBANGA, LOBO, BATANGAS 2. CONSTRUCTION OF SOL | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.062 |
| 61 | 24DE0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), BRGY. MALALIM NA SANOG, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.106 |
| 62 | 23DE0167CONCRETING OF SITIO LAUREL, BRGY. MALABRIGO FMR (PHASE 2), BRGY. MALABRIGO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱14.9M | 97% | Medium risk48 | —-0.004 |
| 63 | 24DE0137CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), BRGY. CALO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.105 |
| 64 | 23DE0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY, BARANGAY APAR, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.105 |
| 65 | 20DE0118LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), LOBO MUNICIPAL COMPOUND, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱24.8M | 100% | Medium risk48 | —-0.094 |
| 66 | 24DE0052ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, TALAHIB PANDAYAN BR. (B03045LZ) ALONG BATANGAS-TABANGAO-LOBO RD | Region IV-A | Batangas 2nd DEO | On-Going | ₱24M | 100% | Medium risk47 | —-0.030 |
| 67 | 22DE0088CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY BANALO (SI | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.094 |
| 68 | 22DD0077ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE- SECONDARY ROADS, BATANGAS - QUEZON RD - K0116 + 000 - K0116 + 225, K0127 + 000 - K0127 + 610, K0130 + 000 - K0130 + 958 | Region IV-A | Batangas 4th DEO | Completed | ₱40.5M | 100% | Medium risk47 | —-0.105 |
| 69 | 22DE0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ACCESS ROAD WITH DRAINAGE, BARANGAY FABRICA, LOBO, BA | Region IV-A | Batangas 2nd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.107 |
| 70 | 22DE0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.107 |
| 71 | 24DE0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT BRGY. TALAHIB PANDA | Region IV-A | Batangas 2nd DEO | Completed | ₱29M | 100% | Medium risk47 | —-0.107 |
| 72 | 22DE0145REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES EMERGENCY REHABILITATION/ DECK SLAB REPLACEMENT OF PERMANENT BRIDGES, TALAHIB PANDAYAN BR. (B03045LZ) ALONG BATANGAS TABANGAO-LOBO ROAD | Region IV-A | Batangas 2nd DEO | Completed | ₱8.7M | 100% | Medium risk47 | —-0.059 |
| 73 | 23DE0038OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY LIBJO (SECTION 1), BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.079 |
| 74 | 24DE0028ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN ISIDRO SECTION 3, B | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.087 |
| 75 | 23DE0039OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY LIBJO (SECTION 2), BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.087 |