Contractor dossier
100 projects on file, including joint ventures this contractor is part of.
Total projects
100
Total budget
₱6B
Average progress
83.9%
Completion rate
73.0%
Average risk score
53.3
Medium risk on average, out of 100
Flagged as unusual
5
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 91 | ₱5.5B | 53.7 | 4 | 85.5% |
| Region IV-B | 8 | ₱417.5M | 44.9 | 0 | 63.1% |
| Negros Island Region | 1 | ₱96.5M | 80.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 37 | ₱2.3B | 52.4 | 1 | 81.5% |
| Roads | 34 | ₱2.1B | 52.4 | 0 | 92.4% |
| Buildings and Facilities | 19 | ₱711.1M | 49.4 | 1 | 78.8% |
| Bridges | 5 | ₱284.6M | 54.2 | 0 | 85.5% |
| GAA 2025 SSP | 2 | ₱283.5M | 95.6 | 2 | 2.2% |
| OTHER | 2 | ₱289.5M | 77.6 | 1 | 100.0% |
| Water Provision and Storage | 1 | ₱39.2M | 48.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
| 22D00110CONSTRUCTION OF BY - PASS ROAD AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk75 | —-0.007 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 22D00089CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVER (UPSTREAM), BARANGAY TAYUMAN, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.059 |
| 24D00194CONSTRUCTION OF BYPASS ROAD, PACKAGE 2, AT BARANGAY BANALO (SITIO HULONG BANALO), LOBO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.9M | 84% | High risk65 | —-0.047 |
| 21D00092REHABILITATION OF DISASTER RELATED INFRASTRUCTURE AND OTHER FACILITIES - RECONSTRUCTION OF COLLAPSED PAVEMENT AND ROADSIDE STRUCTURES AT BATANGAS TABANGAO LOBO ROAD, K0142 + 640 - K0143 + 140, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 21D00093BATANGAS - TABANGAO - LOBO ROAD, K0143 + 140 - K0145 + 483, BATANGAS CITY, AND REPAIR / RAHABILITATION OF FLOOD CONTROL STRUCTURES ALONG BATANGAS - TABANGAO - LOBO ROAD, K0145 + 489 - K0145 + 663, K0146 + 000 - K0146 + 110 | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.031 |
| 25DE0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF LIBJO - DUMUKLAY CONDE RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 1% | High risk65 | —-0.025 |
| 25DE0052ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVER CONTROL PROJECT, BARA | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 11% | High risk65 | —-0.017 |
| 25DE0043ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 3, BARANGAY LIBJO, BATAN | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.5M | 9% | High risk65 | —-0.017 |
| 25DE0035ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SECTION 1, BARANGAY DELA PAZ PRO | Region IV-A | Batangas 2nd DEO | On-Going | ₱94.6M | 64% | High risk65 | —-0.033 |
| 23D00060CONSTRUCTION OF REVETMENT ALONG BATAAN BRIDGE, SAN JUAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.1M | 95% | High risk65 | —-0.024 |
| 22D00006CONSTRUCTION OF MISSING LINKS / NEW ROADSLOBO - MALABRIGO - LAIYA - SAN JUAN ROAD, PACKAGE I, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱159.2M | 12% | High risk65 | —-0.000 |
| 24DE0136CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. BANALO, LOBO, BATANGAS (PACKAGE 2) | Region IV-A | Batangas 2nd DEO | Completed | ₱99M | 100% | High risk64 | —-0.075 |
| 24D00164FY 2024 DPWH INFRASTRUCTURE PROGRAM -ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE VIII, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱94.6M | 31% | High risk64 | —-0.006 |
| 23DE0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LOBO RIVER, NAGTALU | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 23DE0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) (PHASE V), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱148.5M | 23% | High risk64 | —-0.004 |
| 22D00063FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BYPASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱99.4M | 100% | High risk63 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24D00308CONSTRUCTION OF DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT REGION 4A - REGIONAL OFFICE, MARAWOY, LIPA CITY, BATANGAS (PACKAGE B) | Region IV-A | Region IV-A | On-Going | ₱145.5M | 0% | Medium risk58 | Flagged0.054 |
| 25DE0175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY TALAHIB PANDAYA | Region IV-A | Batangas 2nd DEO | On-Going | ₱141.9M | 3% | High risk95 | Flagged0.039 |
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 24DF0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF BREAKWATER STRUCTURE AT BRGY SAN RAFAEL, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱57.3M | 0% | High risk74 | Flagged0.012 |
| 23HK0082SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF NOVALLAS RIVER CONTROL, STA. CRUZ NUEVO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk80 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24DE0042ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DELA PAZ, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.088 |
| 77 | 24DE0043ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TALAHIB PANDAYAN, BATAN | Region IV-A | Batangas 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.088 |
| 78 | 21DE0043ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION/REHABILITATION OF FLOOD CONTROL | Region IV-A | Batangas 2nd DEO | Completed | ₱41.4M | 100% | Medium risk47 | —-0.088 |
| 79 | 22DE0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE AT BRGY. DELA PA | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.088 |
| 80 | 20DE0100CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAWANG RIVER (SITIO BUNGAHAN II AND SITIO ULOPONG), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.088 |
| 81 | 20DE0101CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF FLOOD STRUCTURE ALONG SAWANG RIVER (SITIO SAIMSIM), LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.088 |
| 82 | 24DE0056ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, PALICO-BALAYAN-BATANGAS RD - K0149+1147 - K0150+288 | Region IV-A | Batangas 2nd DEO | On-Going | ₱23.5M | 100% | Medium risk47 | —-0.067 |
| 83 | 24DE0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY PAGKILATAN | Region IV-A | Batangas 2nd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.108 |
| 84 | 23DE0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD WITH CANAL OF BARANGAY HALIGUE SILANGAN, BATAN | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.109 |
| 85 | 19DE0179CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING/IMPROVEMENT OF LOCAL ACCESS ROAD AT BRGY. LAGADLARIN, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.108 |
| 86 | 19DE0178CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING/IMPROVEMENT OF LOCAL ACCESS ROAD AT BRGY.TAYUMAN, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.109 |
| 87 | 22DE0117ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, BAUAN-MABINI RD - K0151+879 - K0152+150 | Region IV-A | Batangas 2nd DEO | Completed | ₱8.9M | 100% | Medium risk46 | —-0.105 |
| 88 | 22DE0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD IN BARANGAY BANALO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.105 |
| 89 | 21E00050CONSTRUCTION/REHABILITATION OF SAN ANDRES PUTIK (MAG-ASAWANG TUBIG), NAUJAN, STA. 0+442.00-STA. 0+964.00, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱48.2M | 100% | Medium risk43 | —-0.070 |
| 90 | 25ED0051CONSTRUCTION OF SEAWALL, BRGY. POBLACION, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱47.5M | 0% | Medium risk43 | —-0.014 |
| 91 | 25ED0052CONSTRUCTION OF SEAWALL, PHASE II, BRGY. POBLACION, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱47.5M | 0% | Medium risk43 | —-0.014 |
| 92 | 25ED0053CONSTRUCTION OF FLOOD CONTROL, PHASE 2, BRGY. TABINAY, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱47.5M | 9% | Medium risk43 | —-0.015 |
| 93 | 19DE0195CY 2019 BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 2STY 6CL AT LAGADLARIN/OLO-OLO ELEMENTARY SCHOOL, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱19.2M | 100% | Medium risk43 | —-0.056 |
| 94 | 19DE0190CY 2019 BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 1STY 2CL AT CALUMPIT ELEMENTARY SCHOOL, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5.7M | 100% | Medium risk43 | —-0.060 |
| 95 | 19DE0191CY 2019 BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 1STY 2CL AT MALAPAD NA PARANG ELEMENTARY SCHOOL, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5.2M | 100% | Medium risk43 | —-0.060 |
| 96 | 23DE0159CY 2023 BASIC EDUCATIONAL FACILITIES FUND (BEFF) - BATCH 1: CONSTRUCTION OF 1STY3CL AT SAN NICOLAS ELEMENTARY SCHOOL | Region IV-A | Batangas 2nd DEO | Completed | ₱10M | 100% | Medium risk42 | —-0.060 |
| 97 | 22DE0118CONCRETING OF BRGY. MALABRIGO FMR, BRGY. MALABRIGO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱12.7M | 100% | Medium risk42 | —-0.048 |
| 98 | 19DE0192CY 2019 BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 1STY 2CL AT NAGTOCTOC ELEMENTARY SCHOOL, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5.7M | 100% | Medium risk42 | —-0.059 |
| 99 | 19DE0193CY 2019 BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 1STY 2CL AT SAWANG ELEMENTARY SCHOOL, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5.3M | 100% | Medium risk42 | —-0.060 |
| 100 | 24ED0122CONSTRUCTION OF ROAD, BARANGAY PALANGAN, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱4.8M | 100% | Medium risk38 | —-0.087 |