Contractor dossier
154 projects on file, including joint ventures this contractor is part of.
Total projects
154
Total budget
₱13.4B
Average progress
92.5%
Completion rate
78.6%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
10
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 134 | ₱10.4B | 57.5 | 6 | 92.2% |
| Region IV-B | 16 | ₱3B | 60.9 | 4 | 93.2% |
| Region III | 3 | ₱11.8M | 16.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱52.1M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱8.3B | 62.0 | 6 | 92.8% |
| Roads | 32 | ₱3.1B | 53.1 | 0 | 97.1% |
| Buildings and Facilities | 24 | ₱675.6M | 42.8 | 0 | 94.9% |
| Bridges | 9 | ₱767M | 58.6 | 0 | 61.8% |
| OTHER | 8 | ₱458.4M | 58.5 | 3 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱145.2M | 94.3 | 1 | 82.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0199REHABILITATION OF QUIAPO PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk73 | —-0.008 |
| 23OE0214INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0215INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0211INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.6M | 100% | High risk69 | —-0.015 |
| 23OE0212INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱93.9M | 100% | High risk69 | —-0.016 |
| 25OE0066CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE II, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.1M | 18% | High risk68 | —-0.015 |
| 25OE0062CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 45% | High risk68 | —-0.026 |
| 25OE0047REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 94% | High risk68 | —-0.037 |
| 25OE0065CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE I, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 62% | High risk68 | —-0.027 |
| 25OE0040INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.1M | 100% | High risk68 | —-0.066 |
| 25OE0050REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY (PHASE 2) | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 88% | High risk68 | —-0.035 |
| 24OE0179REHABILITATION OF BINONDO PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱143.2M | 100% | High risk67 | —-0.066 |
| 24OE0178REHABILITATION OF ESCOLTA PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱144.5M | 100% | High risk67 | —-0.066 |
| 25OE0048REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 87% | High risk67 | —-0.034 |
| 24OE0034INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (LA TORRE ST.) (PACKAGE 1A), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.066 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OE0208REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | Flagged0.027 |
| 24OE0232REHABILITATION OF ROAD ALONG BLUEMENTRITT EXT., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk65 | Flagged0.027 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0224REHABILITATION OF ROAD WITH DRAINAGE ALONG PIY MARGAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱62.7M | 100% | High risk65 | Flagged0.017 |
| 24E00186FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 71% | High risk67 | Flagged0.004 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24E00184FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 82% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24OH0051OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PUMPING STATION, APACIBLE STREET ALONG ESTERO DE PACO, BRGY 673, MANILA CITY | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 52 | 24OE0208REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | Flagged0.027 |
| 53 | 24OE0180REHABILITATION OF DRAINAGE SYSTEM, ZONE 1-12, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.2M | 100% | High risk64 | —-0.077 |
| 54 | 22OE0005INSTALLATION OF BOOSTER PUMP INCLUDING RETARDING BASIN AT ESTERO DE VITAS, BARANGAY 151, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.072 |
| 55 | 22OE0024INSTALLATION OF BOOSTER PUMP INCLUDING RETARDING BASIN ALONG ESTERO DE SAN MIGUEL AT NEPOMUCENO ST. (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱91.7M | 100% | High risk64 | —-0.027 |
| 56 | 24OE0167REHABILITATION OF DRAINAGE SYSTEM, BARANGAY 1 - 146, TONDO, MANILA (PHASE II) | National Capital Region | North Manila DEO | Completed | ₱99M | 100% | High risk64 | —-0.076 |
| 57 | 23OE0060CONSTRUCTION OF PUMPING STATION AT BARANGAY 182, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.075 |
| 58 | 23OE0091IMPROVEMENT OF ROAD WITH DRAINAGE AT ZONE 58 TO 62, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 59 | 24OH0045OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT.PROGRAM-CONST./MAINT.OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-REHABILITATION OF LUNETA PUMPING STATION AT KATIGBAK PARKWAY, ERMITA,MANILA CITY, PHASE II | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 60 | 23OE0057RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - SUNOG APOG BR. (B01792LZ) ALONG ESTERO DE SUNOG APOG, HONORIO LOPEZ ST. TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.052 |
| 61 | 23OE0021INSTALLATION OF BOOSTER PUMP ALONG ESTERO DELA REINA, CM RECTO AVE., (PHASE II), TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 62 | 24OH0073ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT OF LAGUSNILAD PUMPING STATION, MANILA CITY PHASE 2 | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 63 | 24OH0025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHAB. OF LUNETA PUMPING STATION AT KATIGBAK PARKWAY, ERMITA, MANILA CITY-PHASE I | National Capital Region | South Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 64 | 22OA0109CONSTRUCTION OF TWO (2) PUMPING STATIONS ALONG NAVOTAS COASTAL DIKE, PHASE 5, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 65 | 22OA0108CONSTRUCTION OF TWO (2) PUMPING STATIONS ALONG NAVOTAS COASTAL DIKE, PHASE 4, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 66 | 23OE0191INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE X, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 67 | 23OE0012INSTALLATION OF BOOSTER PUMP ALONG ESTERO DELA REINA, CM RECTO AVE., (PHASE I), TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 68 | 24OH0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, SAN ANDRES, MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 77% | High risk63 | —-0.039 |
| 69 | 24E00110ASSET PRESERVATION ROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+602-K0051+691, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk63 | —-0.027 |
| 70 | 24E00111ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+691-K0051+781, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk63 | —-0.057 |
| 71 | 24E00029ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD- K0051+781-K0051+870, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk63 | —-0.057 |
| 72 | 22OE0018REHABILITATION OF LAKANDULA DRAINAGE MAIN, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱69.1M | 100% | High risk62 | —-0.026 |
| 73 | 20OE0194CONSTRUCTION OF MULTI - PURPOSE BUILDINGS (DAYCARE CENTERS), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.073 |
| 74 | 24E00107ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+495-K0119+430 (INTERMITTENT SECTIONS), OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk62 | —-0.062 |
| 75 | 24E00182ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+235-K0118+485, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk62 | —-0.058 |