Contractor dossier
154 projects on file, including joint ventures this contractor is part of.
Total projects
154
Total budget
₱13.4B
Average progress
92.5%
Completion rate
78.6%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
10
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 134 | ₱10.4B | 57.5 | 6 | 92.2% |
| Region IV-B | 16 | ₱3B | 60.9 | 4 | 93.2% |
| Region III | 3 | ₱11.8M | 16.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱52.1M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱8.3B | 62.0 | 6 | 92.8% |
| Roads | 32 | ₱3.1B | 53.1 | 0 | 97.1% |
| Buildings and Facilities | 24 | ₱675.6M | 42.8 | 0 | 94.9% |
| Bridges | 9 | ₱767M | 58.6 | 0 | 61.8% |
| OTHER | 8 | ₱458.4M | 58.5 | 3 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱145.2M | 94.3 | 1 | 82.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0199REHABILITATION OF QUIAPO PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk73 | —-0.008 |
| 23OE0214INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0215INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0211INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.6M | 100% | High risk69 | —-0.015 |
| 23OE0212INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱93.9M | 100% | High risk69 | —-0.016 |
| 25OE0066CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE II, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.1M | 18% | High risk68 | —-0.015 |
| 25OE0062CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 45% | High risk68 | —-0.026 |
| 25OE0047REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 94% | High risk68 | —-0.037 |
| 25OE0065CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE I, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 62% | High risk68 | —-0.027 |
| 25OE0040INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.1M | 100% | High risk68 | —-0.066 |
| 25OE0050REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY (PHASE 2) | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 88% | High risk68 | —-0.035 |
| 24OE0179REHABILITATION OF BINONDO PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱143.2M | 100% | High risk67 | —-0.066 |
| 24OE0178REHABILITATION OF ESCOLTA PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱144.5M | 100% | High risk67 | —-0.066 |
| 25OE0048REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 87% | High risk67 | —-0.034 |
| 24OE0034INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (LA TORRE ST.) (PACKAGE 1A), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.066 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OE0208REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | Flagged0.027 |
| 24OE0232REHABILITATION OF ROAD ALONG BLUEMENTRITT EXT., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk65 | Flagged0.027 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0224REHABILITATION OF ROAD WITH DRAINAGE ALONG PIY MARGAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱62.7M | 100% | High risk65 | Flagged0.017 |
| 24E00186FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 71% | High risk67 | Flagged0.004 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24E00184FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 82% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 25OE0181REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 25-40 (PHASE V), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱94.7M | 90% | High risk62 | —-0.059 |
| 77 | 25OE0016REHABILITATION OF ROAD WITHIN ZONE 41 TO 57, MANILA | National Capital Region | North Manila DEO | Completed | ₱94.7M | 100% | High risk62 | —-0.082 |
| 78 | 25OE0071REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT ALONG OROQUIETA STREET, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94.7M | 100% | High risk62 | —-0.083 |
| 79 | 25OE0070REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT ALONG F. HUERTAS ST. AND CAVITE ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94.7M | 100% | High risk62 | —-0.083 |
| 80 | 25OE0010REHABILITATION OF ROAD WITHIN ZONE 25 TO 40, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱94.8M | 100% | High risk62 | —-0.086 |
| 81 | 24E00077ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, MOGPOG-BALANACAN PORT ROAD, K0013+516-K0014+943 (INTERMITTENT SECTIONS), MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk61 | —-0.049 |
| 82 | 24E00137ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE) , K0016+556-K0016+912, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk61 | —-0.054 |
| 83 | 23OE0183INSTALLATION OF ROAD SAFETY DEVICES (SOLAR LED STREETLIGHTS) ALONG H. LOPEZ BLVD., MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.087 |
| 84 | 23OE0210INSTALLATION OF BOOSTER PUMP AT ESTERO DE CALUBCOB PHASE III, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.3M | 100% | Medium risk59 | —-0.025 |
| 85 | 23OE0209INSTALLATION OF BOOSTER PUMP AT ESTERO DE SAN LAZARO, (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.4M | 100% | Medium risk59 | —-0.025 |
| 86 | 23OE0208INSTALLATION OF BOOSTER PUMP AT ESTERO DE SAN LAZARO, (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.3M | 100% | Medium risk59 | —-0.026 |
| 87 | 23EB0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LUMINTAO RIVER GOING TO SITIO CANSALIW, NEW DAGUPAN, STA. 0+000 - STA. 0+865, CALINTAAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱96.4M | 100% | Medium risk59 | —-0.061 |
| 88 | 25OG0142REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES: KATIPUNAN VIADUCT (NB) (B03322LZ) ALONG C-5 ROAD, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱70.9M | 38% | Medium risk59 | —-0.017 |
| 89 | 23OE00961. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BULWAGAN NG TONDO, MANILA CITY2. CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BULWAGAN NG TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱54.2M | 100% | Medium risk56 | —-0.085 |
| 90 | 23OC0060CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (INSTALLATION OF BOOSTER PUMP) AND GROUNDSILL AT BALIUAG CREEK NEAR MERVILLE GATE 1, DISTRICT 2,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱91.7M | 100% | Medium risk55 | —-0.066 |
| 91 | 25OE0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱48.6M | 0% | Medium risk55 | —-0.030 |
| 92 | 23OB0269CONSTRUCTION OF BARANGAY CONCEPCION DOS MULTI-PURPOSE BUILDING (NACIDA INCUBATOR FACILITY) PHASE 3, BARANGAY, CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱48.5M | 100% | Medium risk55 | —-0.099 |
| 93 | 22OE0004INSTALLATION OF BOOSTER PUMP INCLUDING RETARDING BASIN ALONG ESTERO DE SAN MIGUEL AT MENDIOLA ST. (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱91M | 100% | Medium risk55 | —-0.075 |
| 94 | 25OG0095REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES; MARIABLO BR. (B02335LZ) ALONG E RODRIGUEZ SR, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱70.9M | 25% | Medium risk55 | —-0.013 |
| 95 | 25OG0094REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES: KATIPUNAN VIADUCT (SB) (B03323LZ) ALONG C-5 ROAD, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱70.9M | 75% | Medium risk55 | —-0.028 |
| 96 | 23OB0268CONSTRUCTION OF BARANGAY CONCEPCION DOS MULTI-PURPOSE BUILDING (NACIDA INCUBATOR FACILITY) PHASE 2, BARANGAY, CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱48.5M | 100% | Medium risk55 | —-0.099 |
| 97 | 25OG0071PREVENTIVE MAINTENANCE - SECONDARY ROADS: C-5 ROAD - K0015 + (-714) - K0015 + 1062, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱85.1M | 100% | Medium risk55 | —-0.065 |
| 98 | 25OG0067PREVENTIVE MAINTENANCE - TERTIARY ROADS: E RODRIGUEZ SR - K0008 + (-252) - K0008 +730, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱75.6M | 100% | Medium risk55 | —-0.066 |
| 99 | 22OE0123REHABILITATION OF PSG HEAD QUARTERS BUILDING (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk54 | —-0.087 |
| 100 | 23E00138SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES /FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, LUCUTAN SECTION (PHASE 1), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |