Contractor dossier
154 projects on file, including joint ventures this contractor is part of.
Total projects
154
Total budget
₱13.4B
Average progress
92.5%
Completion rate
78.6%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
10
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 134 | ₱10.4B | 57.5 | 6 | 92.2% |
| Region IV-B | 16 | ₱3B | 60.9 | 4 | 93.2% |
| Region III | 3 | ₱11.8M | 16.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱52.1M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱8.3B | 62.0 | 6 | 92.8% |
| Roads | 32 | ₱3.1B | 53.1 | 0 | 97.1% |
| Buildings and Facilities | 24 | ₱675.6M | 42.8 | 0 | 94.9% |
| Bridges | 9 | ₱767M | 58.6 | 0 | 61.8% |
| OTHER | 8 | ₱458.4M | 58.5 | 3 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱145.2M | 94.3 | 1 | 82.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0199REHABILITATION OF QUIAPO PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk73 | —-0.008 |
| 23OE0214INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0215INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0211INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.6M | 100% | High risk69 | —-0.015 |
| 23OE0212INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱93.9M | 100% | High risk69 | —-0.016 |
| 25OE0066CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE II, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.1M | 18% | High risk68 | —-0.015 |
| 25OE0062CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 45% | High risk68 | —-0.026 |
| 25OE0047REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 94% | High risk68 | —-0.037 |
| 25OE0065CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE I, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 62% | High risk68 | —-0.027 |
| 25OE0040INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.1M | 100% | High risk68 | —-0.066 |
| 25OE0050REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY (PHASE 2) | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 88% | High risk68 | —-0.035 |
| 24OE0179REHABILITATION OF BINONDO PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱143.2M | 100% | High risk67 | —-0.066 |
| 24OE0178REHABILITATION OF ESCOLTA PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱144.5M | 100% | High risk67 | —-0.066 |
| 25OE0048REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 87% | High risk67 | —-0.034 |
| 24OE0034INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (LA TORRE ST.) (PACKAGE 1A), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.066 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OE0208REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | Flagged0.027 |
| 24OE0232REHABILITATION OF ROAD ALONG BLUEMENTRITT EXT., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk65 | Flagged0.027 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0224REHABILITATION OF ROAD WITH DRAINAGE ALONG PIY MARGAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱62.7M | 100% | High risk65 | Flagged0.017 |
| 24E00186FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 71% | High risk67 | Flagged0.004 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24E00184FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 82% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 23E00139SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, LUCUTAN SECTION (PHASE 2), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 102 | 23E00140SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, SUALIN SECTION (PHASE 1), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 103 | 23E00141SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, SUALIN SECTION (PHASE 2), OCC. MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.079 |
| 104 | 20OE0083ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE ALONG ZONE 8, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱29.4M | 100% | Medium risk53 | —-0.037 |
| 105 | 22OE0026INSTALLATION OF BOOSTER PUMP INCLUDING ACCESSORIES ALONG ESTERO DE SAN MIGUEL AT NEPOMUCENO ST. (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱89M | 100% | Medium risk53 | —-0.080 |
| 106 | 23OE0064INSTALLATION OF BOOSTER PUMP INCLUDING RETARDING BASIN AT ESTERO DE MAYPAJO (NEAR RIZAL AVENUE ST.), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱86.8M | 100% | Medium risk53 | —-0.081 |
| 107 | 22OE0003INSTALLATION OF PUMP AT VALENCIA PUMPING STATION (PHASE VI), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱61M | 100% | Medium risk53 | —-0.083 |
| 108 | 23OE0031INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA, PHASE VI, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱70.4M | 100% | Medium risk53 | —-0.084 |
| 109 | 22OE0023INSTALLATION OF AUTOMATIC TRASH SCREEN & HORIZONTAL CONVEYOR AT ESTERO DE SAN MIGUEL AT NEPOMUCENO ST. (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱65.7M | 100% | Medium risk53 | —-0.085 |
| 110 | 22OE0146CONSTRUCTION OF AUTOMATIC TRASH SCREEN RAKE INCLUDING ACCESSORIES AND PLATFORM ALONG ESTERO DE VALENCIA, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.4M | 100% | Medium risk53 | —-0.085 |
| 111 | 23OE0034INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO (PHASE VI), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱70.4M | 100% | Medium risk53 | —-0.086 |
| 112 | 23OE0027INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO PHASE IV, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱70.4M | 100% | Medium risk53 | —-0.086 |
| 113 | 23OE0033INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO (PHASE V), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱72.3M | 100% | Medium risk53 | —-0.086 |
| 114 | 23OH0022ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF DRAINAGE SYSTEM (BOX CULVERT) ALONG ANDREW AVE. FROM NEWPORT 10TH ST. TO AURORA | National Capital Region | South Manila DEO | Completed | ₱62.7M | 100% | Medium risk53 | —-0.086 |
| 115 | 22OE0086CONSTRUCTION OF MULTIPURPOSE BUILDING (PACKAGE 2 ) FOR THE DSWD NATIONAL CAPITAL REGION, LEGARDA ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱39M | 100% | Medium risk52 | —-0.099 |
| 116 | 23OH0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 767, ZONE 83, SAN ANDRES BUKID, MANILA | National Capital Region | South Manila DEO | Completed | ₱38.4M | 100% | Medium risk52 | —-0.091 |
| 117 | 23OH0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING ZONE 83 BRGY. 767, SAN ANDRES, BUKID, MANILA | National Capital Region | South Manila DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.092 |
| 118 | 23D00055CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN)ACCESS ROAD LEADING TO CALATAGAN PORT, CALATAGAN, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱52.1M | 100% | Medium risk51 | —-0.053 |
| 119 | 22OE0001INSTALLATION OF AUTOMATIC TRASH SCREEN & ACCESSORIES AT ESTERO DE MAYPAJO, JUAN LUNA SECTION, MANILA | National Capital Region | North Manila DEO | Completed | ₱54.2M | 100% | Medium risk51 | —-0.088 |
| 120 | 18OE0286STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATIONS CENTERS, NATIONAL CAPITAL REGION (VARIOUS SCHOOL BUILDING) | National Capital Region | North Manila DEO | Completed | ₱20.1M | 100% | Medium risk50 | —-0.102 |
| 121 | 20OE0174CONSTRUCTION OF PATRICIA COMPLEX | National Capital Region | North Manila DEO | Completed | ₱24.5M | 100% | Medium risk49 | —-0.101 |
| 122 | 20OE0191REHABILITATION / RECONSTRUCTION / IMPROVEMENT OF MULTI - PURPOSE BUILDING, PATRICIA PARAISO COMPLEX, BRGY. 177, TONDO, MANILA | National Capital Region | North Manila DEO | Completed | ₱19.8M | 100% | Medium risk49 | —-0.094 |
| 123 | 23OE0085CONSTRUCTION OF BOX CULVERT ALONG SALAMISIM ST., BACOOD, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 124 | 22OE0030REHABILITATION OF DRAINAGE SYSTEM AT ZONE 41 - 57, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 125 | 22OE0165BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE MAGDALENA, STA. 0+000.00 TO STA. 0+76.00 BOTH SIDE, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |