Contractor dossier
154 projects on file, including joint ventures this contractor is part of.
Total projects
154
Total budget
₱13.4B
Average progress
92.5%
Completion rate
78.6%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
10
6.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 134 | ₱10.4B | 57.5 | 6 | 92.2% |
| Region IV-B | 16 | ₱3B | 60.9 | 4 | 93.2% |
| Region III | 3 | ₱11.8M | 16.4 | 0 | 100.0% |
| Region IV-A | 1 | ₱52.1M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱8.3B | 62.0 | 6 | 92.8% |
| Roads | 32 | ₱3.1B | 53.1 | 0 | 97.1% |
| Buildings and Facilities | 24 | ₱675.6M | 42.8 | 0 | 94.9% |
| Bridges | 9 | ₱767M | 58.6 | 0 | 61.8% |
| OTHER | 8 | ₱458.4M | 58.5 | 3 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱145.2M | 94.3 | 1 | 82.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0199REHABILITATION OF QUIAPO PUMPING STATION, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk73 | —-0.008 |
| 23OE0214INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0215INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.4M | 100% | High risk69 | —-0.016 |
| 23OE0211INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE II), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.6M | 100% | High risk69 | —-0.015 |
| 23OE0212INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (RECTO SECTION) (PHASE III), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱93.9M | 100% | High risk69 | —-0.016 |
| 25OE0066CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE II, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.1M | 18% | High risk68 | —-0.015 |
| 25OE0062CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 45% | High risk68 | —-0.026 |
| 25OE0047REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 94% | High risk68 | —-0.037 |
| 25OE0065CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE I, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 62% | High risk68 | —-0.027 |
| 25OE0040INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱142.1M | 100% | High risk68 | —-0.066 |
| 25OE0050REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY (PHASE 2) | National Capital Region | North Manila DEO | On-Going | ₱142.2M | 88% | High risk68 | —-0.035 |
| 24OE0179REHABILITATION OF BINONDO PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱143.2M | 100% | High risk67 | —-0.066 |
| 24OE0178REHABILITATION OF ESCOLTA PUMPING STATION, MANILA | National Capital Region | North Manila DEO | Completed | ₱144.5M | 100% | High risk67 | —-0.066 |
| 25OE0048REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱142M | 87% | High risk67 | —-0.034 |
| 24OE0034INSTALLATION OF BOOSTER PUMP AT ESTERO DE MAGDALENA (LA TORRE ST.) (PACKAGE 1A), TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.066 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24OG0138CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 42% | High risk74 | Flagged0.034 |
| 24OE0208REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | Flagged0.027 |
| 24OE0232REHABILITATION OF ROAD ALONG BLUEMENTRITT EXT., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk65 | Flagged0.027 |
| 24OG0139CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱141.8M | 86% | High risk74 | Flagged0.026 |
| 24OE0224REHABILITATION OF ROAD WITH DRAINAGE ALONG PIY MARGAL ST., SAMPALOC, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱62.7M | 100% | High risk65 | Flagged0.017 |
| 24E00186FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 71% | High risk67 | Flagged0.004 |
| 24E00185FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 76% | High risk67 | Flagged0.002 |
| 24E00183FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 81% | High risk67 | Flagged0.001 |
| 25OH0093RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY | National Capital Region | South Manila DEO | On-Going | ₱145.2M | 83% | High risk94 | Flagged0.001 |
| 24E00184FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 82% | High risk67 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22OE0031REHABILITATION OF DRAINAGE SYSTEM ALONG VARIOUS MAJOR ROADS WITHIN ZONE 13 TO ZONE 24, TONDO, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 127 | 20OE0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE BINONDO, (RS) STA | National Capital Region | North Manila DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 128 | 19OE0075LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT WITH FIRE HYDRANT, BRGY. 310, ZONE 31, MANILA. | National Capital Region | North Manila DEO | Completed | ₱7.8M | 100% | Medium risk49 | —-0.044 |
| 129 | 22OE0091BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE SAN MIGUEL, BARANGAY 389 PHASE I, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱46.9M | 100% | Medium risk49 | —-0.087 |
| 130 | 20OE0170REHABILITATION OF MULTI-PURPOSE BUILDING, ZONE 8-9, BARANGAY 91-123, MANILA | National Capital Region | North Manila DEO | Completed | ₱14.4M | 100% | Medium risk48 | —-0.101 |
| 131 | 20OA0071REHAB. OF TUGATOG (DIWA) MPB (COVERED COURT) BARANGAY TUGATOG, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.103 |
| 132 | 22OE0129RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - CAPULONG BR. (B01790LZ) ALONG C-2 ROAD | National Capital Region | North Manila DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.066 |
| 133 | 21OE0061RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - C. AGUILA BR. (B02621LZ) ALONG C AGUILA ST | National Capital Region | North Manila DEO | Completed | ₱8.5M | 100% | Medium risk47 | —-0.062 |
| 134 | 18OE0094ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS, J. NEPOMUCENO ST. (SO2561LZ) CHAINAGE 0-CHAINAGE 180 | National Capital Region | North Manila DEO | Completed | ₱4.7M | 100% | Medium risk46 | —-0.044 |
| 135 | 22OE0058PREVENTIVE MAINTENANCE - SECONDARY ROADS - J RIZAL AVE - K0003+529 - K0003+709, K0003+194 - K0003 +529 | National Capital Region | North Manila DEO | Completed | ₱18.9M | 100% | Medium risk46 | —-0.096 |
| 136 | 18OA0033REHABILITATION OF ROAD, MESINA ST., BRGY. PANGHULO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.098 |
| 137 | 19OH0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONST./MAINT. OF FLOOD M | National Capital Region | South Manila DEO | Completed | ₱27.7M | 100% | Medium risk46 | —-0.088 |
| 138 | 18OA0021REHABILITATION OF LOCAL ROAD, COMMERCIO ST., BRGY. TUGATOG, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.099 |
| 139 | 21OE0059PREVENTIVE MAINTENANCE - SECONDARY ROADS, NAGTAHAN BRIDGE SERVICE RD - CHAINAGE 0 -CHAINAGE 53, CHAINAGE 169 - CHAINAGE 490, CHAINAGE 53 - CHAINAGE 169 | National Capital Region | North Manila DEO | Completed | ₱6.4M | 100% | Medium risk46 | —-0.095 |
| 140 | 19OE0066LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT / OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONCRETING OF ROADS WITH DRAINAGE IMPROVEMENT ALONG ANONAS STREET, STA. MESA, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.101 |
| 141 | 20OA0039REHABILITATION OF LOCAL ROAD, QUEZON ST., BRGY. TUGATOG, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱5.7M | 100% | Medium risk46 | —-0.099 |
| 142 | 18OA0006REHABILITATION OF ROAD, ILANG-ILANG ST., BRGY. BARITAN, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱6.2M | 100% | Medium risk45 | —-0.100 |
| 143 | 20OE0202COMPLETION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT ANDRES BONIFACIO ELEMENTARY SCHOOL (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.055 |
| 144 | 17OE0199CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS, C.M. RECTO AVE. AND RIZAL AVE. | National Capital Region | North Manila DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.073 |
| 145 | 19CC0128CONSTRUCTION OF TWO STOREY FOUR CLASSROOM BUILDING BULIHAN HS BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.4M | 100% | Medium risk33 | —-0.107 |
| 146 | 19OA0059IMPROVEMENT OF ROAD, BLK 18 AND 19, BRGY. LONGOS, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.098 |
| 147 | 18OA0019REHABILITATION OF ROAD, PANGHULO ROAD, BRGY. PANGHULO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱4M | 100% | Low risk25 | —-0.097 |
| 148 | 18OA0005REHABILITATION OF ROAD, MARLON ST., BRGY. HULONG DUHAT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.097 |
| 149 | 20OA0109CONSTRUCTION OF MULTI-PURPOSE BLDG. BURULAN, BRGY. TUGATOG, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱2.6M | 100% | Low risk24 | —-0.100 |
| 150 | 19OE0057LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - SCHOOL BUILDINGS - CONSTRUCTION / IMPROVEMENT OF SCHOOL BUILDINGS RAMON MAGSAYSAY HIGH SCHOOL, BARANGAY 478 | National Capital Region | North Manila DEO | Completed | ₱1.9M | 100% | Low risk23 | —-0.102 |