Opening the dossier…
Opening the dossier…
Contractor dossier
132 projects on file, including joint ventures this contractor is part of.
Total projects
132
Total budget
₱4.1B
Average progress
88.3%
Completion rate
70.5%
Average risk score
41.0
Medium risk on average, out of 100
Flagged as unusual
6
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 125 | ₱4B | 40.5 | 6 | 88.4% |
| National Capital Region | 7 | ₱170.4M | 48.9 | 0 | 85.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 61 | ₱1.7B | 43.9 | 3 | 84.7% |
| Roads | 38 | ₱426.3M | 31.9 | 0 | 90.8% |
| Flood Control and Drainage | 28 | ₱1.6B | 42.9 | 0 | 97.5% |
| GAA 2025 SSP | 2 | ₱285M | 95.6 | 2 | 50.2% |
| OTHER | 2 | ₱3.8M | 28.0 | 0 | 100.0% |
| Bridges | 1 | ₱47.5M | 66.5 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CD0188CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF SAN JOSE DEL MONTE SCHOOL OF NURSING AND ALLIED HEALTH (PHASE 2), BARANGAY MINUYAN PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 30% | High risk79 | —-0.009 |
| 25CD0194REHABILITATION OF MULTI-PURPOSE BUILDING (MANPOWER DEVELOPMENT BUILDING), BARANGAY GRACEVILLE, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.003 |
| 24C00105BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION, PHASE II, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.8M | 77% | High risk76 | —-0.034 |
| 24C00534BASIC INFRASTRUCTURE PROGRAM-BIP - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING AT BULACAN STATE UNIVERSITY (BSU) SAN RAFAEL CAMPUS, SAN ROQUE, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.8M | 0% | High risk76 | —-0.008 |
| 24C00540CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA. PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING(BSU AUDITORIUM),BULACAN STATE UNIVERSITY-SAN RAFAEL CAMPUS,BRGY. MAGUINAO,SAN RAFAEL,BULACAN(PH | Region III | Region III | On-Going | ₱48.8M | 9% | High risk76 | —-0.009 |
| 25CD0149COMPLETION OF ANGAT NEW MUNICIPAL HALL BUILDING, BARANGAY SAN ROQUE, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱48M | 75% | High risk76 | —-0.034 |
| 24C00473FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MAASIM RIVER, DILIMAN II SECTION, BARANGAY DILIMAN II, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.2M | 99% | High risk74 | —-0.031 |
| 25CP0029FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD REVETMENT STRUCTURE ALONG SAN MIGUEL RIVER, SEGMENT B, BARANGAY SANTA INES, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 57% | High risk74 | —-0.018 |
| 24C00541CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF MULTI-PURPOSE BUILDING(COVERED COURT),SITIO GULOD,BRGY. MAGUINAO, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱24.4M | 5% | High risk73 | —-0.010 |
| 24C00113BASIC INFRASTRUCTURE PROGRAM - BIP - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF SAN MIGUEL DISTRICT HOSPITAL(PHASE IV),BARANGAY SANTA RITA MATANDA, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱29.3M | 1% | High risk72 | —-0.009 |
| 25C00387SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD OF PARTIDA TO STA LUCIA, BARANGAY. STA LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 46% | High risk72 | —-0.026 |
| 24C00119BASIC INFRASTRUCTURE PROGRAM-BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱14.6M | 97% | High risk72 | —-0.043 |
| 25CP0086CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD OF STA. LUCIA TO LAMBAKIN, BARANGAY . | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 0% | High risk72 | —-0.016 |
| 24C00128BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION,SAN RAFAEL,BULACAN | Region III | Region III | Completed | ₱9.8M | 100% | High risk72 | —-0.075 |
| 24C00124BASIC INFRASTRACTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TUKOD, SAN RAFAEL BULACAN | Region III | Region III | On-Going | ₱14.6M | 94% | High risk72 | —-0.036 |
| 25CP0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAPANG BULAK ELEMENTARY SCHOOL, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱17.5M | 88% | High risk72 | —-0.040 |
| 24C00125BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MATIMBUBONG, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱9.9M | 100% | High risk71 | —-0.074 |
| 25CP0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRAT. PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF ROAD, BARANGAY BMA- BALAGTAS, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱19.5M | 0% | High risk69 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00612STATE UNIVERSITIES AND COLLEGES (SUCS)-ESTABLISHMENT AND/OR SUPPORT TO THE COLLEGE OF MEDICINES, SAN RAFAEL CAMPUS-BULACAN STATE UNIVERSITY, SAN RAFAEL, BULACAN, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱98.5M | 30% | Medium risk50 | Flagged0.028 |
| 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 23C00335BASIC EDUCATIONAL FACILITIES FUND (BEFF)-BATCH 1-CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOMS SCHOOL BUILDING IN CARLOS F. GONZALES (MAGUINAO CRUZ NA DAAN NHS), SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱70.9M | 86% | Medium risk56 | Flagged0.017 |
| 24C00102SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE, SAPANG PUTIK-DILIMAN II, SAN ILDEFONSO, BULACAN | Region III | Region III | On-Going | ₱47.5M | 0% | High risk67 | Flagged0.012 |
| 25CD0194REHABILITATION OF MULTI-PURPOSE BUILDING (MANPOWER DEVELOPMENT BUILDING), BARANGAY GRACEVILLE, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 2 | 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 3 | 25CD0188CONSTRUCTION OF MULTI-PURPOSE BUILDING, CITY COLLEGE OF SAN JOSE DEL MONTE SCHOOL OF NURSING AND ALLIED HEALTH (PHASE 2), BARANGAY MINUYAN PROPER, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 30% | High risk79 | —-0.009 |
| 4 | 25CD0194REHABILITATION OF MULTI-PURPOSE BUILDING (MANPOWER DEVELOPMENT BUILDING), BARANGAY GRACEVILLE, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 0% | High risk79 | Flagged0.003 |
| 5 | 24C00105BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION, PHASE II, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.8M | 77% | High risk76 | —-0.034 |
| 6 | 24C00534BASIC INFRASTRUCTURE PROGRAM-BIP - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING AT BULACAN STATE UNIVERSITY (BSU) SAN RAFAEL CAMPUS, SAN ROQUE, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.8M | 0% | High risk76 | —-0.008 |
| 7 | 24C00540CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA. PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONST. OF MULTI-PURPOSE BUILDING(BSU AUDITORIUM),BULACAN STATE UNIVERSITY-SAN RAFAEL CAMPUS,BRGY. MAGUINAO,SAN RAFAEL,BULACAN(PH | Region III | Region III | On-Going | ₱48.8M | 9% | High risk76 | —-0.009 |
| 8 | 25CD0149COMPLETION OF ANGAT NEW MUNICIPAL HALL BUILDING, BARANGAY SAN ROQUE, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱48M | 75% | High risk76 | —-0.034 |
| 9 | 24C00473FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MAASIM RIVER, DILIMAN II SECTION, BARANGAY DILIMAN II, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱48.2M | 99% | High risk74 | —-0.031 |
| 10 | 25CP0029FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD REVETMENT STRUCTURE ALONG SAN MIGUEL RIVER, SEGMENT B, BARANGAY SANTA INES, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 57% | High risk74 | —-0.018 |
| 11 | 24C00541CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONST. OF MULTI-PURPOSE BUILDING(COVERED COURT),SITIO GULOD,BRGY. MAGUINAO, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱24.4M | 5% | High risk73 | —-0.010 |
| 12 | 24C00113BASIC INFRASTRUCTURE PROGRAM - BIP - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF SAN MIGUEL DISTRICT HOSPITAL(PHASE IV),BARANGAY SANTA RITA MATANDA, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱29.3M | 1% | High risk72 | —-0.009 |
| 13 | 25C00387SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD OF PARTIDA TO STA LUCIA, BARANGAY. STA LUCIA, SAN MIGUEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 46% | High risk72 | —-0.026 |
| 14 | 24C00119BASIC INFRASTRUCTURE PROGRAM-BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PULONG SAMPALOC, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Region III | On-Going | ₱14.6M | 97% | High risk72 | —-0.043 |
| 15 | 25CP0086CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD OF STA. LUCIA TO LAMBAKIN, BARANGAY . | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 0% | High risk72 | —-0.016 |
| 16 | 24C00128BASIC INFRASTRUCTURE PROGRAM-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY POBLACION,SAN RAFAEL,BULACAN | Region III | Region III | Completed | ₱9.8M | 100% | High risk72 | —-0.075 |
| 17 | 24C00124BASIC INFRASTRACTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TUKOD, SAN RAFAEL BULACAN | Region III | Region III | On-Going | ₱14.6M | 94% | High risk72 | —-0.036 |
| 18 | 25CP0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAPANG BULAK ELEMENTARY SCHOOL, DONA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱17.5M | 88% | High risk72 | —-0.040 |
| 19 | 24C00125BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MATIMBUBONG, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱9.9M | 100% | High risk71 | —-0.074 |
| 20 | 25CP0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRAT. PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF ROAD, BARANGAY BMA- BALAGTAS, SAN RAFAEL, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱19.5M | 0% | High risk69 | —-0.015 |
| 21 | 24C00484SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SAMPALOC-PINAC-PINACAN ROAD,BARANGAY SAMPALOC, SAN RAFAEL,BUL. | Region III | Region III | On-Going | ₱19M | 87% | High risk69 | —-0.039 |
| 22 | 24C00528BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG MALANGAN RIVER (LEFT BANK), BARANGAY TUKOD, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱39.6M | 86% | High risk69 | —-0.027 |
| 23 | 24C00529BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG MALANGAN RIVER (RIGHT BANK), BARANGAY TUKOD, SAN RAFAEL, BULACAN | Region III | Region III | On-Going | ₱39.6M | 90% | High risk69 | —-0.029 |
| 24 | 24C00116SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF AMRIS LATERAL A1,SAN RAFAEL,BULACAN(KATUBIGAN-KALSADA TUNGO SA KATUBIGAN) | Region III | Region III | On-Going | ₱22.7M | 63% | High risk69 | —-0.028 |
| 25 | 24C00135SUSTAINABLE INFRASTRUCT. PROJ. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS RDS. AND/OR BRS. FROM THE NATL. RD./S LEADING TO MAJOR/STRATEG. PUBLIC BLDGS./FACILITIES-CONST. OF AMRIS LATERAL A,SAN RAFAEL,BUL.(KATUBIGAN-KALSADA TUNGO SA PATUBIGAN),SAN RAFAEL,BUL. | Region III | Region III | On-Going | ₱8.3M | 74% | High risk69 | —-0.034 |