Contractor dossier
131 projects on file, including joint ventures this contractor is part of.
Total projects
131
Total budget
₱8.9B
Average progress
83.2%
Completion rate
61.1%
Below 70%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
18
13.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 47 | ₱3B | 54.8 | 3 | 79.8% |
| Region III | 30 | ₱1.5B | 50.9 | 2 | 96.8% |
| Region IV-A | 13 | ₱1.1B | 57.4 | 0 | 81.2% |
| Region IV-B | 9 | ₱1.1B | 54.9 | 5 | 58.7% |
| Region XI | 9 | ₱353.5M | 47.2 | 0 | 100.0% |
| Negros Island Region | 7 | ₱398.2M | 51.1 | 0 | 100.0% |
| Region X | 6 | ₱190.7M | 45.8 | 0 | 83.1% |
| Region VII | 3 | ₱573.2M | 66.5 | 3 | 21.0% |
| Region I | 3 | ₱161M | 63.6 | 3 | 70.5% |
| Region VIII | 2 | ₱379.4M | 68.7 | 1 | 78.5% |
| Region VI | 2 | ₱138.8M | 64.8 | 1 | 65.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 65 | ₱5.9B | 58.5 | 8 | 86.8% |
| Buildings and Facilities | 36 | ₱1.9B | 48.4 | 6 | 71.3% |
| Roads | 26 | ₱819.4M | 46.1 | 1 | 93.4% |
| GAA 2025 SSP | 2 | ₱145.5M | 94.6 | 2 | 32.1% |
| OTHER | 1 | ₱106.1M | 79.6 | 1 | 100.0% |
| Bridges | 1 | ₱10.5M | 47.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0359CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 3) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱72.8M | 30% | High risk95 | Flagged0.024 |
| 25OB0360CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 4) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱72.8M | 34% | High risk95 | Flagged0.024 |
| 24GA0249CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AKLAN RIVER (PACKAGE 2-A), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱105.1M | 30% | High risk83 | Flagged0.063 |
| 24CL0051CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 9, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.5M | 97% | High risk82 | —-0.013 |
| 24CL0024CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE I | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 63% | High risk80 | Flagged0.003 |
| 24CL0027CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE IV | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 65% | High risk80 | Flagged0.001 |
| 24CL0025CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE II | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 96% | High risk80 | —-0.012 |
| 24CL0060CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.044 |
| 24A00226CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG BONGO RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 100% | High risk80 | Flagged0.018 |
| 24HM0014CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE III AT DATAG RIVER (DO | Negros Island Region | Siquijor DEO | Completed | ₱96.5M | 100% | High risk77 | —-0.027 |
| 24CC0385CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, POBLACION SECTION, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.059 |
| 23CC0532CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. SULIVAN BALIUAG, BULACAN STA.. 004+531 TO STA. 004+831 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.005 |
| 23CC0529CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS AT BRGY. PAGALA BALIUAG, BULACAN STA. 003+462 TO SR=TA. 003+762 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.005 |
| 22CD0236REHABILITATION OF MUNICIPAL BUILDING, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.1M | 100% | High risk73 | —-0.071 |
| 24CC0407CONSTRUCTION OF ROAD, BRGY. KAPITANGAN, PAOMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱39.6M | 100% | High risk70 | —-0.068 |
| 24I00042CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱190.9M | 67% | High risk69 | Flagged0.000 |
| 24I00043CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱188.5M | 90% | High risk69 | —-0.005 |
| 24E00150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OC | Region IV-B | Region IV-B | On-Going | ₱232.4M | 90% | High risk68 | Flagged0.000 |
| 24E00053BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOODMITIGATION STUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACLITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER (EAST SIDE), SITIO MALINAO SECTION, BRGY. TAGUMPAY, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱247.5M | 100% | High risk68 | —-0.039 |
| 24E00039FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, SITIO DIKE, BRGY. APITONG SECTION, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk67 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0249CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AKLAN RIVER (PACKAGE 2-A), KALIBO, AKLAN | Region VI | Aklan DEO | On-Going | ₱105.1M | 30% | High risk83 | Flagged0.063 |
| 24E00216POLYTECHNIC UNIVERSITY OF THE PHILIPPINES- CONST. OF ACADEMIC BUILDING, PUP, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱93.6M | 0% | Medium risk55 | Flagged0.039 |
| 24E00229POLYTECHNIC UNIVERSITY OF THE PHILIPPINES- CONSTRUCTION OF ACADEMIC BUILDING, PUP, BANSUD, ORIENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱93.4M | 0% | Medium risk54 | Flagged0.039 |
| 23H00043OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, CANLASID SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱193M | 0% | High risk67 | Flagged0.032 |
| 23H00044OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, AGAPE SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱166.3M | 0% | High risk67 | Flagged0.025 |
| 25OB0359CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 3) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱72.8M | 30% | High risk95 | Flagged0.024 |
| 25OB0360CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE 4) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱72.8M | 34% | High risk95 | Flagged0.024 |
| 24E00253LGU HOSPITALS - SIBUYAN DISTRICT HOSPITAL, SIBUYAN ISLAND, RIOMBLON | Region IV-B | Region IV-B | On-Going | ₱61.9M | 17% | Medium risk53 | Flagged0.022 |
| 24A00226CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG BONGO RIVER, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱106.1M | 100% | High risk80 | Flagged0.018 |
| 24E00251LGU HOSPITALS - ROMBLON PROVINCIAL HOSPITAL, ROMBLON, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱47.9M | 22% | Medium risk47 | Flagged0.018 |
| 23H00009OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VILLAFLOR SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱213.9M | 63% | High risk66 | Flagged0.017 |
| 21O00075CONSTRUCTION OF LAS PIÑAS GENERAL HOSPITAL AND SATELLITE TRAUMA CENTER BUILDING, BRGY. PULANGLUPA 1, LAS PIÑAS CITY | National Capital Region | National Capital Region | On-Going | ₱494.9M | 61% | High risk65 | Flagged0.008 |
| 24A00063CONSTRUCTION OF MISSING LINKS/ NEW ROADS - JCT ILOCOS NORTE ABRA ROAD - NUEVA ERA - TINEG ROAD, NUEVA ERA, ILOCOS NORTE | Region I | Region I | On-Going | ₱14.2M | 16% | High risk65 | Flagged0.007 |
| 24AE0101CONSTRUCTION OF 4 STOREY-12 CLASSROOM SCHOOL BUILDING AT LA UNION NATIONAL HIGH SCHOOL, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | On-Going | ₱40.6M | 96% | Medium risk46 | Flagged0.004 |
| 24CL0024CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE I | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 63% | High risk80 | Flagged0.003 |
| 24CL0027CONSTRUCTION OF SLOPE PROTECTION ALONG BUCAO RIVER, DOWNSTREAM, NORTH APPROACH, BOTOLAN, ZAMBALES, PHASE IV | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 65% | High risk80 | Flagged0.001 |
| 24I00042CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱190.9M | 67% | High risk69 | Flagged0.000 |
| 24E00150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OC | Region IV-B | Region IV-B | On-Going | ₱232.4M | 90% | High risk68 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24OB0259BANK IMPROVEMENT OF SLOPE PROTECTION ALONG PASIG-MARIKINA RIVER, PASIG CITY (PACKAGE 2) | National Capital Region | Metro Manila 1st DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.088 |
| 77 | 24OB0258BANK IMPROVEMENT OF SLOPE PROTECTION ALONG PASIG-MARIKINA RIVER, PASIG CITY (PACKAGE 1) | National Capital Region | Metro Manila 1st DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.088 |
| 78 | 21OI0112CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE II, BARANGAY TALON 5, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱11.9M | 100% | Medium risk49 | —-0.101 |
| 79 | 24OB0169CONSTRUCTION OF RETAINING WALL AND REHABILITATION OF STA. ANA RIVER, PATEROS, METRO MANILA (PACKAGE VI) | National Capital Region | Metro Manila 1st DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.088 |
| 80 | 21OG0100CONSTRUCTION OF MULTIPURPOSE BUILDING W/ GYMNASIUM, BRGY. ROXAS, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱24.7M | 100% | Medium risk49 | —-0.101 |
| 81 | 23OG0067REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE XXII), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.089 |
| 82 | 21OF0184CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE BUILDING, BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱18M | 100% | Medium risk49 | —-0.101 |
| 83 | 22OA0081CONSTRUCTION OF MULTI-PURPOSE BUILDING, (TANGOS NATIONAL HIGH SCHOOL), BARANGAY TANGOS NORTH, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.101 |
| 84 | 22OE0105CONSTRUCTION OF MULTI - PURPOSE BUILDING AT BARANGAY 212 ZONE 19, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱10.4M | 100% | Medium risk48 | —-0.104 |
| 85 | 22OB0283REHABILITATION OF MULTI-PURPOSE BUILDING (ADMINISTRATIVE) AT MANDALUYONG HIGH SCHOOL, POBLACION, MANDALUYONG | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk48 | —-0.103 |
| 86 | 21O00061CONSTRUCTION OF BALLISTIC TESTING FACILITY INSIDE NHQCL COMPOUND, CAMP BGEN. RAFAEL T. CRAME, QUEZON CITY (RE-ADVERTISEMENT) | National Capital Region | National Capital Region | Completed | ₱11.2M | 100% | Medium risk48 | —-0.098 |
| 87 | 22HJ0036CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG MALANGSA RIVER, STA. 0+000 - STA. 1+250 (BS, US), PUAN, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.057 |
| 88 | 21OB0232CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT AT MARIETTA-ROMEO VILLAGE, BRGY. STA. LUCIA, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.094 |
| 89 | 24E00251LGU HOSPITALS - ROMBLON PROVINCIAL HOSPITAL, ROMBLON, ROMBLON | Region IV-B | Region IV-B | On-Going | ₱47.9M | 22% | Medium risk47 | Flagged0.018 |
| 90 | 21OH0129LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-REHAB. AT OFFICE OF THE DIRECTOR & BUSINESS INNOVATION DIVISION,IMS 4TH FLOOR, ICC BLDG. DPWH CENTRAL OFFICE, PORT AREA, MANILA | National Capital Region | South Manila DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.100 |
| 91 | 22DH0035RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, DALITIWAN BR. (B02497LZ) ALONG MAJAYJAY-LUCBAN RD, MAJAYJAY, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱10.5M | 100% | Medium risk47 | —-0.066 |
| 92 | 23GA0175REHABILITATION OF AKLAN WEST ROAD (S00480PN) INCLUDING SLOPE PROTECTION, K0251+550 K0251+602 BRGY. UNION, NABAS, AKLAN | Region VI | Aklan DEO | Completed | ₱33.7M | 100% | Medium risk47 | —-0.084 |
| 93 | 22OG0026PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - EPIFANIO DELOS SANTOS AVE. (EDSA) (S05132LZ) - K0016 + (-239) - K0016 + (-006), K0016 + (-431) - K0016 + (-239), K0016 + (-536) - K0016 + (-431), K0016 + 1152 - K0017 + 252, K0016 .... QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱28.2M | 100% | Medium risk47 | —-0.099 |
| 94 | 24AE0101CONSTRUCTION OF 4 STOREY-12 CLASSROOM SCHOOL BUILDING AT LA UNION NATIONAL HIGH SCHOOL, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | On-Going | ₱40.6M | 96% | Medium risk46 | Flagged0.004 |
| 95 | 24HL0015ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF RIVER CONTROL ALONG UPSTREAM A OF BANGCOLOTAN RIVER | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.067 |
| 96 | 24HL0020ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF CANAWAY RIVER CONTROL (UPSTREAM A), SIATON, NEGROS | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.067 |
| 97 | 24OA0039CONSTRUCTION OF MUZON RIVERWALL (PHASE 6), BARANGAY MUZON, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱45.3M | 100% | Medium risk46 | —-0.086 |
| 98 | 22OH0050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-PASIG LINE (SO2838LZ) CHAINAGE 107-CHAINAGE 671, MANILA | National Capital Region | South Manila DEO | Completed | ₱11.2M | 100% | Medium risk46 | —-0.096 |
| 99 | 23OD0219CONSTRUCTON OF ROADS AND DRAINAGE, BRGY. 32 PHASE 2, CLAOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.097 |
| 100 | 23OD0221CONSTRUCTION OF ROADS AND DRAINAGE SYSTEM AT BRGY. 51 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.100 |