Opening the dossier…
Opening the dossier…
Contractor dossier
720 projects on file, including joint ventures this contractor is part of.
Total projects
720
Total budget
₱84.9B
Average progress
94.7%
Completion rate
82.1%
Average risk score
53.6
Medium risk on average, out of 100
Flagged as unusual
66
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 370 | ₱45.1B | 51.0 | 42 | 92.7% |
| Region X | 329 | ₱36.9B | 56.3 | 21 | 97.3% |
| Region IV-B | 9 | ₱1.6B | 57.0 | 1 | 100.0% |
| Central Office | 6 | ₱949.3M | 59.3 | 0 | 100.0% |
| Region III | 5 | ₱450.8M | 65.0 | 2 | 57.4% |
| Region IV-A | 1 | ₱47.5M | 50.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 369 | ₱44.3B | 49.9 | 4 | 95.4% |
| Bridges | 137 | ₱11.6B | 50.3 | 8 | 96.8% |
| Flood Control and Drainage | 113 | ₱13.7B | 52.1 | 6 | 98.4% |
| OTHER | 40 | ₱6.3B | 79.3 | 25 | 90.9% |
| Bridges, Roads | 17 | ₱2.6B | 57.1 | 1 | 95.6% |
| GAA 2025 OO-1 | 16 | ₱1.7B | 92.9 | 9 | 71.5% |
| Water Provision and Storage | 10 | ₱1.3B | 50.1 | 4 | 85.0% |
| Buildings and Facilities | 9 | ₱1.5B | 51.6 | 0 | 83.0% |
| GAA 2025 OO-2 | 5 | ₱1.2B | 92.5 | 5 | 72.0% |
| GAA 2025 SSP | 4 | ₱677.2M | 95.2 | 4 | 64.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00077CONSTRUCTION OF ROAD, CABADBARAN-PUTING BATO- LANUZA, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, PACKAGE C, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱125.8M | 57% | High risk95 | Flagged0.031 |
| 25N00074CONSTRUCTION OF TRENTO SOUTH EAST DIVERSION ROAD | Region XIII | Region XIII | On-Going | ₱182.9M | 60% | High risk95 | Flagged0.043 |
| 25CJ0304CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BARAS-BARAS, TARLAC CITY, TARLAC (PHASE 3) | Region III | Tarlac DEO | On-Going | ₱82.6M | 87% | High risk95 | Flagged0.008 |
| 25N00057BUTUAN CITY-PIANING-TANDAG ROAD, BRGY. KOLAMBOGAN-PADIAY, SIBAGAT, PACKAGE K, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱48M | 82% | High risk94 | Flagged0.000 |
| 25N00018MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)-K1243+800-K1246+389, K1246+413.15- K1248+550 | Region XIII | Region XIII | On-Going | ₱287.1M | 31% | High risk94 | Flagged0.047 |
| 25N00040MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1304+(-404)- K1306+958, K1307+296- K1307+471, K1307+493-K1307+585, K1309+183-K1312+690, K1313+076-K1313+077, K1313+462-K1313+690, K1321+532-K1322+520 | Region XIII | Region XIII | On-Going | ₱207.7M | 42% | High risk94 | Flagged0.040 |
| 25N00133SURIGAO-AGUSAN WEST COASTAL RD, PACKAGE 12, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱168M | 46% | High risk94 | Flagged0.027 |
| 25K00301CONST. OF BY-PASS AND DIVERSION ROADS MANOLO FORTICH-MISAMIS ORIENTAL ALTERNATE/BYPASS ROAD, PACKAGE 12, BUKIDNON | Region X | Region X | On-Going | ₱95.5M | 42% | High risk94 | Flagged0.011 |
| 25K00183CONST. OF BY-PASS AND DIVERSION ROADS CDO-NEW WESTERN DIVERSION ROAD (MACABALAN-BONBON BRIDGE AND ACCESS ROAD), PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱95.2M | 86% | High risk94 | —-0.002 |
| 25K00167CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CDO-OPOL-EI SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD, BAIKINGON BRIDGE, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱71.6M | 100% | High risk94 | —-0.013 |
| 25K00156CONST. OF BY-PASS AND DIVERSION ROADS, MISAMIS ORIENTAL-BUKIDNON BYPASS ROAD (PHIVIDEC-ALAE), PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱92.7M | 100% | High risk94 | —-0.009 |
| 25N00027DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE - LAS NIEVES - SIBAGAT), PACKAGE 9, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱50.4M | 66% | High risk94 | Flagged0.011 |
| 25N00218BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 32, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱115.4M | 75% | High risk93 | Flagged0.011 |
| 25N00217BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 31, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱115.4M | 93% | High risk93 | Flagged0.005 |
| 25N00245MAGSAYSAY BR. (B01723MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR RD) | Region XIII | Region XIII | On-Going | ₱192.4M | 36% | High risk93 | Flagged0.032 |
| 25K00362CONSTRUCTION OF BY-PASS AND DIVERSION ROADS OPOL DIVERSION ROAD (OPOL-CANITO-AN), PACKAGE 18, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱47.8M | 60% | High risk93 | —-0.002 |
| 25N00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 4, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱285.7M | 70% | High risk93 | Flagged0.021 |
| 25N00106CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 3, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱285.7M | 70% | High risk93 | Flagged0.021 |
| 25N00116CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT LOWER AGUSAN RIVER, MAGALLANES PAGATPATAN SECTION, MAGALLANES, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱286M | 71% | High risk93 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00226DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1218+878.50-K1222+079.22 | Region XIII | Region XIII | On-Going | ₱193M | 53% | High risk90 | Flagged0.077 |
| 24N00214CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG LAKE MAINIT-TUBAY RIVER BASIN, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 76% | High risk90 | Flagged0.070 |
| 24CJ0414CONSTRUCTION OF MULTI-PURPOSE BUILDING, TARLAC CITY GENERAL HOSPITAL, TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.6M | 53% | High risk90 | Flagged0.060 |
| 24K00553CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 14, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00550CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 11, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00551CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 12, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 65% | High risk72 | Flagged0.053 |
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00018MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)-K1243+800-K1246+389, K1246+413.15- K1248+550 | Region XIII | Region XIII | On-Going | ₱287.1M | 31% | High risk94 | Flagged0.047 |
| 24N00042REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1367+000- K1367+576, K1367+662- K1367+685, K1367+788- K1367+854, K1368+032- K1368+228, K1372+000- K1372+400, K1373+220- K1374+475, K1374+519- K1375+ | Region XIII | Region XIII | On-Going | ₱240.3M | 76% | High risk80 | Flagged0.045 |
| 25N00074CONSTRUCTION OF TRENTO SOUTH EAST DIVERSION ROAD | Region XIII | Region XIII | On-Going | ₱182.9M | 60% | High risk95 | Flagged0.043 |
| 24N00007DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1254+720- K1255+188, K1255+222- K1257+004, K1260+000- K1261+500 | Region XIII | Region XIII | On-Going | ₱379.7M | 76% | High risk81 | Flagged0.042 |
| 25N00040MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1304+(-404)- K1306+958, K1307+296- K1307+471, K1307+493-K1307+585, K1309+183-K1312+690, K1313+076-K1313+077, K1313+462-K1313+690, K1321+532-K1322+520 | Region XIII | Region XIII | On-Going | ₱207.7M | 42% | High risk94 | Flagged0.040 |
| 24N00013DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1356+790- K1356+805, K1356+859- K1357+636, K1357+759- K1357+800, K1359+000- K1360+519, K1366+000- K1367+000 | Region XIII | Region XIII | On-Going | ₱223M | 85% | High risk80 | Flagged0.039 |
| 17N00154REHABILITATION OF NRJ - BINUCAYAN, LORETO - STA. CRUZ - KATIPUNAN - DEL MONTE, VERUELA AGUSAN DEL SUR (PHASE 3), VERUELA AND LORETO, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱199.8M | 100% | Medium risk45 | Flagged0.036 |
| 24N00049CONSTRUCTION OF NRJ DAANG MAHARLIKA, SIBAGAT (SITIO EUREKA, TABON-TABON)- BUGSUKAN-ANTONGALON ROAD, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 68% | High risk81 | Flagged0.034 |
| 25N00245MAGSAYSAY BR. (B01723MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR RD) | Region XIII | Region XIII | On-Going | ₱192.4M | 36% | High risk93 | Flagged0.032 |
| 22N00086CONSTRUCTION OF MAINIT WATER SUPPLY DEVELOPMENT AND WATER TREATMENT SERVICE FACILITY, MAINIT, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱129.1M | 10% | Medium risk50 | Flagged0.032 |
| 25N00077CONSTRUCTION OF ROAD, CABADBARAN-PUTING BATO- LANUZA, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, PACKAGE C, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱125.8M | 57% | High risk95 | Flagged0.031 |
| 24N00154CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE B, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱190.7M | 73% | High risk81 | Flagged0.031 |
| 24N00006DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1246+000- K1246+389, K1247+030- K1247+260, K1248+000- K1248+212, K1248+261- K1248+385, K1254+000- K1254+720 | Region XIII | Region XIII | On-Going | ₱205.4M | 87% | High risk81 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 23N00123CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG MONTILLA JCT BCIR-SOUTH MONTILLA BOULEVARD-LADP MAIN DRAINAGE CANAL PACKAGE 1, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱241.2M | 100% | Medium risk54 | —-0.032 |
| 277 | 21N00036CONSTRUCTION/ IMPROVEMENT OF ROAD, SALAYSAYON- JAGUIMITAN ROAD, NASIPIT, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱173.7M | 100% | Medium risk53 | —-0.063 |
| 278 | 18N00053CONSTRUCTION OF MISSING LINKS, BUTUAN CITY-PIANING-TANDAG ROAD (BRGY. KOLAMBOGAN-PADIAY, SIBAGAT), PACKAGE B, SIBAGAT, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.055 |
| 279 | 24N00149CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN ANTONIO, MADRID, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.031 |
| 280 | 18N00104CONSTRUCTION OF NRJ STO. TOMAS-STA. TERESA-SAN ISIDRO-STO. NIÑO-KAUSWAGAN-BUGDANGAN - FERDINAND-SABUD-MARANG ROAD WITH BRIDGE, LORETO, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱190.1M | 100% | Medium risk53 | Flagged0.003 |
| 281 | 20N00114ASPHALT OVERLAY ALONG MAYOR DEMOCRITO D. PLAZA II AVENUE- K1238+390- K1240+440, K1242+439- K1242+641, K1249+426- K1250+520, BUTUAN CITY | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱96.5M | 100% | Medium risk53 | —-0.077 |
| 282 | 21N00150NRJ BCIR- JCT. LOGISTICAL HIGHWAY (CABCABON SECTION), BUTUAN CITY | Region XIII | Region XIII | Completed | ₱178.5M | 100% | Medium risk53 | —-0.054 |
| 283 | 25N00203CONSTRUCTION OF BUTUAN CITY WATER SYSTEM, MAIN BYPASS PIPELINE, (BARANGAY TAGUIBO-BARANGAY ANTONGALON SECTION), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱287.8M | 70% | Medium risk53 | Flagged0.014 |
| 284 | 24N00003EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/BUKIDNON AGUSAN-MALAYBALAY ROAD, PACKAGE 9, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱154.4M | 100% | Medium risk53 | —-0.069 |
| 285 | 24N00002EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ BUKIDNON AGUSAN-MALAYBALAY ROAD, PACKAGE 8, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱154.4M | 100% | Medium risk53 | —-0.069 |
| 286 | 24N00088REHABILITATION OF BANK PROTECTION STRUCTURE ALONG TAGUIBO RIVER PROTECTING TAGUIBO DAM WATER-FILTRATION FACILITIES, PACKAGE 2, BARANGAY ANTICALA, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk53 | —-0.035 |
| 287 | 22N00190REHABILITATION OF BANK PROTECTION STRUCTURE ALONG TAGUIBO RIVER PROTECTING TAGUIBO DAM WATER-FILTRATION FACILITIES, BRGY. ANTICALA, BUTUAN CITY | Region XIII | Region XIII | Completed | ₱154.4M | 100% | Medium risk53 | —-0.050 |
| 288 | 24N00077DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1225+923- K1226+000, K1235+515- K1238+135 | Region XIII | Region XIII | On-Going | ₱146.6M | 42% | Medium risk53 | —-0.028 |
| 289 | 23N00184CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LAKE MAINIT-TUBAY RIVER (KALINAWAN- KARAK-AN SECTION), PACKAGE 3, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱159.2M | 100% | Medium risk53 | —-0.051 |
| 290 | 17K00212CONST. OF BY PASSES/DIVERSION ROADS, MIS.OR.-BUK BY PASS RD,PHIVIDEC-ALAE SECT.PACKAGE 1, BUK 1ST LD | Region X | Region X | Completed | ₱154.4M | 100% | Medium risk53 | Flagged0.001 |
| 291 | 23N00059PREVENTIVE MAINTENANCE (ASPAHLT OVERLAY) ALONG BUTUAN CITY-MALAYBALAY ROAD K1247+775- K1250+742, K1250+839- K1255+022.5 | Region XIII | Region XIII | Completed | ₱173.7M | 100% | Medium risk53 | —-0.066 |
| 292 | 20N00017MAYOR DEMOCRITO D. PLAZA II AVE- K1241+780- K1242+439, K1246+440- K1248+622, K1248+671- K1248+907, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱159.6M | 100% | Medium risk53 | —-0.069 |
| 293 | 18N00014CONSTRUCTION OF MISSING LINKS, BDRY. BUKIDNON/ AGUSAN DEL NORTE (BUENAVISTA - SIMBALAN SECTION), AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱177.4M | 100% | Medium risk53 | —-0.064 |
| 294 | 25K00181CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDO-OPOL-EL SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD, ALUBIJID BRIDGE 2, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱71.4M | 100% | Medium risk53 | —-0.029 |
| 295 | 23N00114CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TAGABAKA CREEK, DOWNSTREAM WITH RCBC IMPROVEMENT, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱173.7M | 100% | Medium risk53 | —-0.042 |
| 296 | 21KD0037CONSTRUCTION OF AGORA - OSMENA BRIDGE, LAPASAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱75.2M | 100% | Medium risk53 | —-0.044 |
| 297 | 21KD0039WIDENING BIGAAN 2 PARALLEL BR ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱73.3M | 100% | Medium risk53 | —-0.044 |
| 298 | 25K00174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAGAYAN DE ORO COASTAL ROAD (PUERTO-GUSA SECTION), PACKAGE 9, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱72.2M | 95% | Medium risk53 | —-0.027 |
| 299 | 25K00175CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAGAYAN DE ORO COASTAL ROAD (PUERTO-GUSA SECTION), PACKAGE 10, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱72.2M | 96% | Medium risk53 | —-0.027 |
| 300 | 21KD0025CONST OF PARALLEL BRIDGE-CUGMAN 1 PARALLEL ALONG BCIR | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱77.2M | 100% | Medium risk53 | —-0.044 |