Contractor dossier
720 projects on file, including joint ventures this contractor is part of.
Total projects
720
Total budget
₱84.9B
Average progress
94.7%
Completion rate
82.1%
Average risk score
53.6
Medium risk on average, out of 100
Flagged as unusual
66
9.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 370 | ₱45.1B | 51.0 | 42 | 92.7% |
| Region X | 329 | ₱36.9B | 56.3 | 21 | 97.3% |
| Region IV-B | 9 | ₱1.6B | 57.0 | 1 | 100.0% |
| Central Office | 6 | ₱949.3M | 59.3 | 0 | 100.0% |
| Region III | 5 | ₱450.8M | 65.0 | 2 | 57.4% |
| Region IV-A | 1 | ₱47.5M | 50.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 369 | ₱44.3B | 49.9 | 4 | 95.4% |
| Bridges | 137 | ₱11.6B | 50.3 | 8 | 96.8% |
| Flood Control and Drainage | 113 | ₱13.7B | 52.1 | 6 | 98.4% |
| OTHER | 40 | ₱6.3B | 79.3 | 25 | 90.9% |
| Bridges, Roads | 17 | ₱2.6B | 57.1 | 1 | 95.6% |
| GAA 2025 OO-1 | 16 | ₱1.7B | 92.9 | 9 | 71.5% |
| Water Provision and Storage | 10 | ₱1.3B | 50.1 | 4 | 85.0% |
| Buildings and Facilities | 9 | ₱1.5B | 51.6 | 0 | 83.0% |
| GAA 2025 OO-2 | 5 | ₱1.2B | 92.5 | 5 | 72.0% |
| GAA 2025 SSP | 4 | ₱677.2M | 95.2 | 4 | 64.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00077CONSTRUCTION OF ROAD, CABADBARAN-PUTING BATO- LANUZA, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, PACKAGE C, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱125.8M | 57% | High risk95 | Flagged0.031 |
| 25N00074CONSTRUCTION OF TRENTO SOUTH EAST DIVERSION ROAD | Region XIII | Region XIII | On-Going | ₱182.9M | 60% | High risk95 | Flagged0.043 |
| 25CJ0304CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BARAS-BARAS, TARLAC CITY, TARLAC (PHASE 3) | Region III | Tarlac DEO | On-Going | ₱82.6M | 87% | High risk95 | Flagged0.008 |
| 25N00057BUTUAN CITY-PIANING-TANDAG ROAD, BRGY. KOLAMBOGAN-PADIAY, SIBAGAT, PACKAGE K, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱48M | 82% | High risk94 | Flagged0.000 |
| 25N00018MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)-K1243+800-K1246+389, K1246+413.15- K1248+550 | Region XIII | Region XIII | On-Going | ₱287.1M | 31% | High risk94 | Flagged0.047 |
| 25N00040MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1304+(-404)- K1306+958, K1307+296- K1307+471, K1307+493-K1307+585, K1309+183-K1312+690, K1313+076-K1313+077, K1313+462-K1313+690, K1321+532-K1322+520 | Region XIII | Region XIII | On-Going | ₱207.7M | 42% | High risk94 | Flagged0.040 |
| 25N00133SURIGAO-AGUSAN WEST COASTAL RD, PACKAGE 12, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱168M | 46% | High risk94 | Flagged0.027 |
| 25K00301CONST. OF BY-PASS AND DIVERSION ROADS MANOLO FORTICH-MISAMIS ORIENTAL ALTERNATE/BYPASS ROAD, PACKAGE 12, BUKIDNON | Region X | Region X | On-Going | ₱95.5M | 42% | High risk94 | Flagged0.011 |
| 25K00183CONST. OF BY-PASS AND DIVERSION ROADS CDO-NEW WESTERN DIVERSION ROAD (MACABALAN-BONBON BRIDGE AND ACCESS ROAD), PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱95.2M | 86% | High risk94 | —-0.002 |
| 25K00167CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CDO-OPOL-EI SALVADOR-ALUBIJID-LAGUINDINGAN AIRPORT (PUEBLO DE ORO/CDO AIRPORT TO JCT. BCIR LAGUINDINGAN) MOUNTAIN DIVERSION ROAD, BAIKINGON BRIDGE, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱71.6M | 100% | High risk94 | —-0.013 |
| 25K00156CONST. OF BY-PASS AND DIVERSION ROADS, MISAMIS ORIENTAL-BUKIDNON BYPASS ROAD (PHIVIDEC-ALAE), PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱92.7M | 100% | High risk94 | —-0.009 |
| 25N00027DAANG MAHARLIKA (ALTERNATE ROUTE) (NRJ-MAYOR DEMOCRITO D. PLAZA II AVENUE - LAS NIEVES - SIBAGAT), PACKAGE 9, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱50.4M | 66% | High risk94 | Flagged0.011 |
| 25N00218BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 32, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱115.4M | 75% | High risk93 | Flagged0.011 |
| 25N00217BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 31, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱115.4M | 93% | High risk93 | Flagged0.005 |
| 25N00245MAGSAYSAY BR. (B01723MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR RD) | Region XIII | Region XIII | On-Going | ₱192.4M | 36% | High risk93 | Flagged0.032 |
| 25K00362CONSTRUCTION OF BY-PASS AND DIVERSION ROADS OPOL DIVERSION ROAD (OPOL-CANITO-AN), PACKAGE 18, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱47.8M | 60% | High risk93 | —-0.002 |
| 25N00107CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 4, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱285.7M | 70% | High risk93 | Flagged0.021 |
| 25N00106CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 3, BUTUAN CITY | Region XIII | Region XIII | On-Going | ₱285.7M | 70% | High risk93 | Flagged0.021 |
| 25N00116CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT LOWER AGUSAN RIVER, MAGALLANES PAGATPATAN SECTION, MAGALLANES, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱286M | 71% | High risk93 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00226DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1218+878.50-K1222+079.22 | Region XIII | Region XIII | On-Going | ₱193M | 53% | High risk90 | Flagged0.077 |
| 24N00214CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG LAKE MAINIT-TUBAY RIVER BASIN, TUBAY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 76% | High risk90 | Flagged0.070 |
| 24CJ0414CONSTRUCTION OF MULTI-PURPOSE BUILDING, TARLAC CITY GENERAL HOSPITAL, TARLAC CITY, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.6M | 53% | High risk90 | Flagged0.060 |
| 24K00553CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 14, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00550CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 11, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00551CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 12, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱237.6M | 65% | High risk72 | Flagged0.053 |
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00018MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)-K1243+800-K1246+389, K1246+413.15- K1248+550 | Region XIII | Region XIII | On-Going | ₱287.1M | 31% | High risk94 | Flagged0.047 |
| 24N00042REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1367+000- K1367+576, K1367+662- K1367+685, K1367+788- K1367+854, K1368+032- K1368+228, K1372+000- K1372+400, K1373+220- K1374+475, K1374+519- K1375+ | Region XIII | Region XIII | On-Going | ₱240.3M | 76% | High risk80 | Flagged0.045 |
| 25N00074CONSTRUCTION OF TRENTO SOUTH EAST DIVERSION ROAD | Region XIII | Region XIII | On-Going | ₱182.9M | 60% | High risk95 | Flagged0.043 |
| 24N00007DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1254+720- K1255+188, K1255+222- K1257+004, K1260+000- K1261+500 | Region XIII | Region XIII | On-Going | ₱379.7M | 76% | High risk81 | Flagged0.042 |
| 25N00040MAHARLIKA HIGHWAY (AGUSAN-DAVAO SECT)- K1304+(-404)- K1306+958, K1307+296- K1307+471, K1307+493-K1307+585, K1309+183-K1312+690, K1313+076-K1313+077, K1313+462-K1313+690, K1321+532-K1322+520 | Region XIII | Region XIII | On-Going | ₱207.7M | 42% | High risk94 | Flagged0.040 |
| 24N00013DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1356+790- K1356+805, K1356+859- K1357+636, K1357+759- K1357+800, K1359+000- K1360+519, K1366+000- K1367+000 | Region XIII | Region XIII | On-Going | ₱223M | 85% | High risk80 | Flagged0.039 |
| 17N00154REHABILITATION OF NRJ - BINUCAYAN, LORETO - STA. CRUZ - KATIPUNAN - DEL MONTE, VERUELA AGUSAN DEL SUR (PHASE 3), VERUELA AND LORETO, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱199.8M | 100% | Medium risk45 | Flagged0.036 |
| 24N00049CONSTRUCTION OF NRJ DAANG MAHARLIKA, SIBAGAT (SITIO EUREKA, TABON-TABON)- BUGSUKAN-ANTONGALON ROAD, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | On-Going | ₱193M | 68% | High risk81 | Flagged0.034 |
| 25N00245MAGSAYSAY BR. (B01723MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR RD) | Region XIII | Region XIII | On-Going | ₱192.4M | 36% | High risk93 | Flagged0.032 |
| 22N00086CONSTRUCTION OF MAINIT WATER SUPPLY DEVELOPMENT AND WATER TREATMENT SERVICE FACILITY, MAINIT, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱129.1M | 10% | Medium risk50 | Flagged0.032 |
| 25N00077CONSTRUCTION OF ROAD, CABADBARAN-PUTING BATO- LANUZA, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, PACKAGE C, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱125.8M | 57% | High risk95 | Flagged0.031 |
| 24N00154CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE B, BOUNDARY AGUSAN DEL NORTE-LANUZA ROAD, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱190.7M | 73% | High risk81 | Flagged0.031 |
| 24N00006DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1246+000- K1246+389, K1247+030- K1247+260, K1248+000- K1248+212, K1248+261- K1248+385, K1254+000- K1254+720 | Region XIII | Region XIII | On-Going | ₱205.4M | 87% | High risk81 | Flagged0.030 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 701 | 20NA0025REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDE-PRIMARY ROADS, DAANG MAHARLIKA(SURIGAO-AGUSAN SECTION), S00399MN, K1172+435 - K1172+467.40 AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱9.9M | 100% | Medium risk39 | —-0.089 |
| 702 | 20NH0047CONSTRUCTION OF JCT. LANUZA BYPASS RD.-SITIO MAMPI, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk39 | —-0.078 |
| 703 | 20NH0048CONSTRUCTION OF NRJ SDR SITIO HANYA-AN - SITIO NEPTUNE ROAD, DIATAGON, LIANGA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱38.2M | 100% | Medium risk38 | —-0.077 |
| 704 | 20NH0045CONSTRUCTION OF NRJ-SDR - BRGY. UNABAN - BRGY. CARAS-AN, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱38.2M | 100% | Medium risk38 | —-0.078 |
| 705 | 24N00014DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1258+292 - K1258+787.5 | Region XIII | Region XIII | Completed | ₱10.8M | 100% | Medium risk38 | —-0.083 |
| 706 | 23NB0037PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - AGUSAN-MALAYBALAY RD K1278+800.00 - K1278+841.00, K1281+213.00 - K1281+253.50, K1287+161.00 - K1287+192.42, ESPERANZA, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱7.2M | 100% | Medium risk38 | —-0.085 |
| 707 | 24N00015DAANG MAHARLIKA (AGUSAN-DAVAO SECT)- K1291+666 - K1291+933.2 | Region XIII | Region XIII | Completed | ₱13.2M | 100% | Medium risk38 | —-0.081 |
| 708 | 24NB0003PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY - NJR BAHBAH-TALACOGON RD K1294+(-499.00) - K1294+(-188.10), PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱6.6M | 100% | Medium risk38 | —-0.079 |
| 709 | 18ND0107DESILTATION/CHANNEL EXCAVATION OF CARBDP EASTBANK CUTOFF CHANNEL MAHAY LEMON CREEK LADP CUTOFF CHANNEL TO PROTECT MAYOR DEMOCRITO PLAZA II AVENUE ALONG MAHAY & LEMON SECTIONS WITH SAND POCKET, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Butuan City DEO | Completed | ₱39.2M | 100% | Medium risk38 | —-0.071 |
| 710 | 18NA0045CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - DREDGING OF LAKE MAINIT TUBAY RIVER, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱27.9M | 100% | Medium risk38 | —-0.070 |
| 711 | 20NA0012CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONSTRUCTION OF ACIGA RIVER FLOOD CONTROL, SANTIAGO, AGUSAN DEL NORTE | Region XIII | Agusan del Norte DEO | Completed | ₱23.8M | 100% | Medium risk38 | —-0.070 |
| 712 | 22NB0010CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF MAUG FLOOD CONTROL STRUCTURE ALONG RIVERBANK OF MAUG BRIDGE PHASE III (DOWNSTREAM), STA.0+000.00 - STA.0+320.00 R/S, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱45.1M | 100% | Medium risk38 | —-0.063 |
| 713 | 22NB0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BANK PROTECTION OF SIANIB RIVER ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECTION), STA. 0+000.00 - STA. 0+350.00 UPSTREAM, STA. 0+000.00 - STA. 0+066.40 DOWNSTREAM, PROSPERIDAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱45.1M | 100% | Medium risk38 | —-0.065 |
| 714 | 20NB0005CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG AGUSAN RIVER, PHASE II LABNIG SECTION, BRGY. LABNIG, TALACOGON, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱29.4M | 100% | Medium risk37 | —-0.065 |
| 715 | 20NH0052CONSTRUCTION OF CONCRETE ROAD - NRJ SDCR, SITIO MAM-ON TUBO-TUBO ROAD, CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱38.2M | 100% | Medium risk37 | —-0.076 |
| 716 | 20CJ0065FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF TARLAC CITY URBAN PUMPING STATION ALONG MASALASA CREEK, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱76.3M | 100% | Medium risk35 | —-0.082 |
| 717 | 24ND0029BUTUAN CITY-MALAYBALAY RD - K1247 + 078 - K1247 + 163.50 | Region XIII | Butuan City DEO | Completed | ₱2.9M | 100% | Low risk18 | —-0.084 |
| 718 | 25NA0014ROAD WIDENING - TERTIARY ROADS, AGUSAN-MALAYBALAY RD - K1276 + 146 - K1276 + 326 | Region XIII | Agusan del Norte DEO | Completed | ₱2.4M | 100% | Low risk17 | —-0.078 |
| 719 | 22N00117NRJ BCIR TO NRJ BUTUAN CITY - MALAYBALAY RD (VIA. DUMALAGAN-NONGNONG-BIT-OS DIVERSION RD), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | Region XIII | Completed | ₱2.4M | 100% | Low risk17 | —-0.080 |
| 720 | 20KL0006ASSET PRESERVATION PREVENTIVE MAINTENANCE TERTIARY ROADSLOGUILO-ALUBIJID BY-PASS ROAD, K1461+(-092) K1461+(-038) | Region X | Misamis Oriental 2nd DEO | Completed | ₱923.5K | 100% | Low risk16 | —-0.092 |