Contractor dossier
29 projects on file, including joint ventures this contractor is part of.
Total projects
29
Total budget
₱593.9M
Average progress
96.6%
Completion rate
96.6%
Average risk score
39.6
Medium risk on average, out of 100
Flagged as unusual
1
3.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 24 | ₱450.5M | 37.9 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱106.7M | 51.7 | 1 | 66.7% |
| Region IV-A | 1 | ₱17.2M | 45.1 | 0 | 100.0% |
| Region XIII | 1 | ₱19.6M | 39.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 17 | ₱235.5M | 36.9 | 0 | 100.0% |
| Roads | 7 | ₱184.5M | 42.7 | 1 | 85.7% |
| Flood Control and Drainage | 5 | ₱173.9M | 44.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17PI0060ASSET PRESERVATIONF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4), SECONDARY ROADS:MT. PROVINCE-N VISCAYA RD - K03 | Cordillera Administrative Region | Mountain Province 1st DEO | Terminated | ₱21.2M | 0% | Medium risk60 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17PI0060ASSET PRESERVATIONF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4), SECONDARY ROADS:MT. PROVINCE-N VISCAYA RD - K03 | Cordillera Administrative Region | Mountain Province 1st DEO | Terminated | ₱21.2M | 0% | Medium risk60 | Flagged0.004 |
| 2 | 23PG0032LUBUONG-BOKIAWAN-NUNGULUNAN ROAD LEADING TO BAKUNG SPIDER WEB AND OTHER TOURISM DESTINATIONS, HUNGDUAN, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.072 |
| 3 | 18BH0026CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, CORDON, ISABELA | Region II | Isabela 4th DEO | Completed | ₱16.7M | 100% | Medium risk47 | —-0.084 |
| 4 | 18BH0030CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDINGS, ECHAGUE | Region II | Isabela 4th DEO | Completed | ₱12.1M | 100% | Medium risk47 | —-0.085 |
| 5 | 23BI0018ORGANIZATIONAL OUTCOME 2- PROTECT LIVE AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG M | Region II | Nueva Vizcaya DEO | Completed | ₱47.3M | 100% | Medium risk46 | —-0.067 |
| 6 | 22PG0027REHAB./RECONST'N. OF NAT'L. RDS. W/ SLIPS SLOPE COLLAPSE AND LANDSLIDE ALONG BAN-HUNG-BENGUET BDRY. RD. - K0387+650-K0387+680,K0389+170-K0389+182,K0369+790-K0369+819,K0377+081-K0377+150,HUNGDUAN, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱37.6M | 100% | Medium risk46 | —-0.079 |
| 7 | 17DF0113CONSTRUCTION OF 4STY 8CL SCHOOL BUILDING AT MANGGAHAN ES, GENERAL TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱17.2M | 100% | Medium risk45 | —-0.031 |
| 8 | 18BB0105REPAIR/RESTORATION OF ERODED SHOULDER/RIVER CONTROL (REVETMENT) ALONG JCT. GATTARAN-CUMAO-CAPISSAYAN-STA. MARGARITA-BOLOS ROAD, STA. MARGARITA, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21.1M | 100% | Medium risk44 | —-0.066 |
| 9 | 18BB0107REPAIR/IMPROVEMENT OF SLIPPED ROADS AND SLOPE PROTECTION, CAPISSAYAN SUR, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱10.9M | 100% | Medium risk44 | —-0.081 |
| 10 | 18BH0005ROAD WIDENING TERTIARY ROADS SANTIAGO-BALUARTE-QUIRINO BDRY. (K0329+305-K0331-000) | Region II | Isabela 4th DEO | Completed | ₱45.4M | 100% | Medium risk44 | —-0.075 |
| 11 | 18BH0018CONSTRUCTION OF DALIBUBON FLOOD CONTROL PROJECT (STA. 0+000-STA.0+710) | Region II | Isabela 4th DEO | Completed | ₱45.8M | 100% | Medium risk44 | —-0.068 |
| 12 | 22BI0028ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER CONTROL, PAITAN SECTION | Region II | Nueva Vizcaya DEO | Completed | ₱40.8M | 100% | Medium risk44 | —-0.067 |
| 13 | 18BI0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. LUCIA SECTION ALONG | Region II | Nueva Vizcaya DEO | Completed | ₱18.8M | 100% | Medium risk44 | —-0.070 |
| 14 | 18BB0125CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (2-SCI-LAB & 2-ICT) SCHOOL BUILDING, CALAOAGAN DACKEL NHS, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk43 | —-0.035 |
| 15 | 18BB0111CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (4-REGULAR WORKSHOP) SCHOOL BUILDING, GATTARAN NTS, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk43 | —-0.036 |
| 16 | 18BB0121CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (2-SCI-LAB & 2-ICT) SCHOOL BUILDING, GATTARAN NTS, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk43 | —-0.036 |
| 17 | 18BB0122CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (2-SCI-LAB & 2-ICT) SCHOOL BUILDING, DON MARIANO MARCOS NHS, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk43 | —-0.037 |
| 18 | 18BB0112CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (4-REGULAR WORKSHOP) SCHOOL BUILDING (9.5M X 46.00M), DON MARIANO MARCOS NHS, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk43 | —-0.037 |
| 19 | 18BB0117CONSTRUCTION AND COMPLETION OF TWO-STOREY 8-CL (2-SCI-LAB & 2-ICT) SCHOOL BUILDING, LUGA NHS, STA. TERESITA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱21M | 100% | Medium risk42 | —-0.035 |
| 20 | 22NE0044REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT-LORETO ROAD K0015+195-K0015+318,K0021+810-K0022+000, SAN JOSE, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱19.6M | 100% | Medium risk39 | —-0.088 |
| 21 | 17BB0134CONSTRUCTION OF 1-STOREY (2) TWO CLASSROOMS SCHOOL BUILDING WITH TOILET, BARBARIT ES; BATUG SUR ES; BOLOS PT. ES; CAPIDDIGAN ES, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱11.9M | 100% | Medium risk37 | —-0.010 |
| 22 | 17BB0136CONSTRUCTION OF VARIOUS SCHOOL BUILDING WITH TOILE, GANZANO ES; GUISING ES; NAGATUTUAN ES, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱10.4M | 100% | Medium risk37 | —-0.012 |
| 23 | 17BB0135CONSTRUCTION OF VARIOUS SCHOOL BUILDING WITH TOILET, MABUNO ES; BASAO ES; CULLIT ES, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱10.4M | 100% | Medium risk37 | —-0.010 |
| 24 | 17BB0119CONSTRUCTION OF VARIOUS SCHOOL BUILDING WITH TOILET, BARSAT EAST ES; SANTOR ES, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱11.9M | 100% | Medium risk37 | —-0.004 |
| 25 | 17BB0126CONSTRUCTION OF 1-STOREY (3) THREE CLASSROOMS SCHOOL BUILDING WITH TOILET, CALAOAGAN DACKEL NHS - CAPISSAYAN ANNEX; CALAOAGAN DACKEL NHS - CAPISSAYAN ANNEX; CALAOAGAN DACKEL NHS - CAPISSAYAN ANNEX, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱13.4M | 100% | Medium risk37 | —-0.016 |