Opening the dossier…
Opening the dossier…
Contractor dossier
300 projects on file, including joint ventures this contractor is part of.
Total projects
300
Total budget
₱23.9B
Average progress
94.5%
Completion rate
69.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
24
8.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 276 | ₱20.4B | 62.1 | 21 | 94.5% |
| Region X | 21 | ₱729.3M | 51.3 | 1 | 95.4% |
| Central Office | 2 | ₱2.8B | 79.0 | 2 | 90.2% |
| Region XI | 1 | ₱39.2M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱15.8B | 60.6 | 7 | 96.2% |
| Flood Control and Drainage | 33 | ₱2.7B | 65.9 | 1 | 87.6% |
| Buildings and Facilities | 20 | ₱585.5M | 46.9 | 1 | 100.0% |
| Bridges | 17 | ₱669.9M | 55.9 | 3 | 93.6% |
| GAA 2025 OO-1 | 7 | ₱512.1M | 93.8 | 4 | 67.7% |
| OTHER | 7 | ₱1.8B | 77.3 | 5 | 100.0% |
| GAA 2025 SSP | 2 | ₱151.4M | 94.8 | 2 | 64.6% |
| Bridges, Roads | 2 | ₱1.5B | 76.1 | 1 | 86.7% |
| Water Provision and Storage | 2 | ₱68.7M | 49.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 25JB0069PREVENTIVE MAINTENANCE RIZAL-DAKAK-DAPITAN COASTAL LOOP ROAD K1828+673.20-K1829+000, K1829+000-K1830+000,K1830+000-K1831+000,K1831+000-K1831+208.30 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 95% | High risk94 | Flagged0.002 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 25KH0064ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (S01247MN) - K1441+(-840) - K1441+817, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.2M | 79% | High risk94 | —-0.005 |
| 25KH0063ASSET PRES-PREV MAINT- PRIMARY ROADS BUT CITY-CAG DE ORO CITY-ILIGAN CITY RD (S01246MN) - K1441+291 - K1441+666, (S01246MN) - K1441+666 - K1441+832, (S01246MN) - K1441+832 - K1442+610, (S01246MN) - K1442+610 - K1443+350 (S01246MN) -K1443+350 - K1444+236 | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.1M | 80% | High risk94 | —-0.006 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 25KH0066ASSET PRES. - PREV. MAINT- TERTIARY RD CDO-CADRE CIRC. EXT RD (S00580MN) CH 0 - CH 755, (S00604MN) CH 0 - CH 556, CDO-CADRE CIRC EXT RD (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00602MN) CHAINAGE 0 - CHAINAGE 439, CDOC | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱53M | 95% | High risk93 | —-0.014 |
| 17J00071CONSTRUCTION OF KUMALARANG PSCG BRIDGE #3 AND APPROACHES ALONG IMELDA - BAYOG - KUMALARANG - LAPUYAN - MARGOSATUBIG ROAD, ZAMBOANGA DEL SUR, STA. 0+000.00 - STA. 0+600.00, ABUTMENT -A : STA. 0+260.00, ABUTMENT -B : STA. 0+350.84, RIVER PROTECTION NET LEN | Region IX | Region IX | Completed | ₱114.5M | 100% | High risk82 | —-0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23J00160PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱143.7M | 55% | High risk75 | —-0.010 |
| 18JI0072CONSTRUCTION OF BRIDGE AND ROAD APPROACHES, BRGY. CONCEPCION, ALICIA, Z.S | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱44.9M | 100% | High risk75 | —-0.012 |
| 25J00011CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (DOWNSTREAM - LEFT SI | Region IX | Region IX | On-Going | ₱145.6M | 63% | High risk74 | —-0.008 |
| 24J00155CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱173.6M | 93% | High risk74 | —-0.018 |
| 18J00015CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (CURUAN - LUBIGAN SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱127.7M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00287ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONCRETING ALONG NRJ BARANGAY SAN ISIDRO - SAS - KALAWIT - NAMNAMA, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱154.3M | 60% | High risk66 | Flagged0.049 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 22J00123CONSTRUCTION OF MISSING LINKS/NEW ROADS - SINDANGAN - BAYOG - LAKEWOOD ROAD, BIWA BRIDGE, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱64.3M | 24% | High risk62 | Flagged0.023 |
| 21J00067CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱134.2M | 67% | High risk73 | Flagged0.022 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 19J00134CONCRETING OF BRGY. GATA - GATA FMR, BRGY. GATA - GATA, PANGLIMA ESTINO, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk67 | Flagged0.008 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 19J00132CONCRETING OF BRGY. BATU UGIS FMR, BRGY. BATU UGIS, MAIMBUNG, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk68 | Flagged0.008 |
| 21J00086CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - REHABILITATION OF JOLO MAINLAND WATER DISTRICT, BRGY. ASTURIAS, JOLO, SULU | Region IX | Region IX | Completed | ₱173.2M | 100% | High risk70 | Flagged0.007 |
| 25J00032ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO- PAGADIAN- ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱112.1M | 13% | High risk67 | Flagged0.006 |
| 22J00045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DIPLO RIVER, DIPLO BRIDGE (B00551MN) (DOWNSTREAM) ALONG PAGADIAN - ZAMBOANGA CITY ROAD (S01453MN), ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱63M | 63% | High risk62 | Flagged0.004 |
| 22J00112PREVENTIVE MAINTENANCE - TERTIARY ROADS SANGA - SANGA BATO - BATO ROAD | Region IX | Region IX | On-Going | ₱57.9M | 76% | High risk66 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 24JD0051CONSTRUCTION OF CABANCALAN ROAD, LILOY, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | On-Going | ₱39M | 100% | Medium risk52 | —-0.052 |
| 252 | 25JD0016PREVENTIVE MAINTENANCE - PRIMARY ROADS, LILOY-IPIL RD - K1979 + 057 - K1981 + 108.50, K1984 + 359.24 - K1984 + 703.20, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱39.6M | 100% | Medium risk52 | —-0.084 |
| 253 | 23JB0033PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1857+(-1123)-K1857+(-837) | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱8M | 100% | Medium risk52 | —-0.081 |
| 254 | 21JD0035REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS RIZAL-DAKAK-DAPITAN COASTAL LOOP ROAD K1846+943-K1847+043,K1848+968-K1849+069,K1852+038-K1852+071 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱9.7M | 100% | Medium risk52 | —-0.085 |
| 255 | 22JB0003CONSTRUCTION OF CONCRETE ROAD -JCT. DIPOLOG-SINDANGAN ROAD CONNECTING TO BAGO-DALONGDONG (JOAQUIN MACIAS) IN SUPPORT OF RICE, RUBBER, COCONUT AND ABACA INDUSTRIES, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱9.6M | 100% | Medium risk52 | —-0.085 |
| 256 | 18JD0034CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS ACCESS ROAD LEADING TO DAPITAN PORT INCLUDING ROW, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱7.3M | 100% | Medium risk52 | —-0.077 |
| 257 | 18JF0019CONSTRUCTION OF CONCRETE BRIDGE ALONG BUAYAN BR. II ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD. ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱38.2M | 100% | Medium risk52 | —-0.055 |
| 258 | 22KH0043ASSET PRESERVATION-CONSTRUCTION/UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS: BUTUAN CITY-CDOC-ILIGAN CITY RD.-S01246MN: K1441+(-588)-K1441+(-538), K1441+(-518)-K1441+(-498), K1441+250-K1441+281.41,K1441+453.6-K1441+843.4, S01247MN: K1 | Region X | Cagayan de Oro City 1st DEO | Completed | ₱76.2M | 100% | Medium risk52 | —-0.081 |
| 259 | 19JE0004REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE BOTEL BR. (B01204 MN), ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD. | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.052 |
| 260 | 20JF0031CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. ROAD CONNECTING PPRPC TO JUNCTION NATIONAL HIGHWAY IN SUPPORT OF RUBBER PROCESSING, LA PAZ, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱15.7M | 100% | Medium risk51 | —-0.085 |
| 261 | 22JE0015BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF ROAD, BARANGAY BAMBONG DIUT TO BARANGAY BAGONG OPON, MUNICIPALITY OF RAMON MAGSAYSAY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱12.9M | 100% | Medium risk51 | —-0.081 |
| 262 | 18JD0074REHABILITATION OF ROAD LEADING TO THE MANIWAY PEAKS AND HIGHLAND RESORT RIZAL, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱4.8M | 100% | Medium risk51 | —-0.086 |
| 263 | 22JE0014CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, NRJ TO BGRY. KAHAYAGAN WEST- BRGY. PASINGKALAN IN SUPPORT TO VIRGIN COCONUT OIL PROCESSING, AURORA AND RAMON MAGSAYSAY, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱8M | 100% | Medium risk51 | —-0.073 |
| 264 | 23JB0032PREVENTIVE MAINTENANCE DIPOLOG-POLANCO-PIÑAN-JCT. OROQUIETA ROAD K1826+620-K1826+888.20 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱5.4M | 100% | Medium risk51 | —-0.082 |
| 265 | 21JF0101CONSTRUCTION (COMPLETION) OF DPWH STANDARD DESIGN, DPWH ZAMBOANGA SIBUGAY 2ND DEO, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱19.3M | 100% | Medium risk51 | —-0.081 |
| 266 | 24JD0001PREVENTIVE MAINTENANCE - PRIMARY ROADS, SINDANGAN - LILOY RD - K1933 + 474 - K1933 + 633, K1934 + 516 - K1935 + 000, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱8.8M | 100% | Medium risk50 | —-0.086 |
| 267 | 18JG0055CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL III, MARGOSATUBIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱27.9M | 100% | Medium risk50 | —-0.040 |
| 268 | 20JF0032CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. KALIANTANA ROAD CONNECTING BRGY. KALIANTANA AND JUNCTION NATIONAL HIGHWAY IN SUPPORT OF SEAWEEDS AND COCONUT INDUSTRIES, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.7M | 100% | Medium risk50 | —-0.084 |
| 269 | 21JF0102COMPLETION OF MPB (POWER HOUSE AND OTHER UTILITIES) FOR ZAMBOANGA SIBUGAY MEDICAL CENTER, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱14.8M | 100% | Medium risk50 | —-0.081 |
| 270 | 21JF0006CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. KALIANTANA ROAD CONNECTING BRGY. KALIANTANA AND JUNCTION NATIONAL HIGHWAY IN SUPPORT OF SEAWEEDS AND COCONUT INDUSTRIES, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱7.3M | 100% | Medium risk50 | —-0.085 |
| 271 | 21JF0103CONSTRUCTION OF MPB (POWER HOUSE AND OTHER UTILITIES) FOR ZAMBOANGA SIBUGAY MEDICAL CENTER, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱9.8M | 100% | Medium risk50 | —-0.082 |
| 272 | 20JF0029CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LEADING TO TIPAN CAVE AND WALO-BALUT CAVE BRGY. TIPAN, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱13.3M | 100% | Medium risk50 | —-0.086 |
| 273 | 25KH0065ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (S01247MN) - K1440+037 - K1439+124, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱48.9M | 87% | Medium risk49 | —-0.055 |
| 274 | 21JF0004CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LEADING TO TIPAN CAVE AND WALO-BALUT CAVE BRGY. TIPAN, NAGA, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.084 |
| 275 | 21JB0084CONSTRUCTION OF WATER SUPPLY SYSTEM, MUNICIPALITY OF SINDANGAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱40.7M | 100% | Medium risk49 | —-0.028 |