Opening the dossier…
Opening the dossier…
Contractor dossier
300 projects on file, including joint ventures this contractor is part of.
Total projects
300
Total budget
₱23.9B
Average progress
94.5%
Completion rate
69.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
24
8.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 276 | ₱20.4B | 62.1 | 21 | 94.5% |
| Region X | 21 | ₱729.3M | 51.3 | 1 | 95.4% |
| Central Office | 2 | ₱2.8B | 79.0 | 2 | 90.2% |
| Region XI | 1 | ₱39.2M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱15.8B | 60.6 | 7 | 96.2% |
| Flood Control and Drainage | 33 | ₱2.7B | 65.9 | 1 | 87.6% |
| Buildings and Facilities | 20 | ₱585.5M | 46.9 | 1 | 100.0% |
| Bridges | 17 | ₱669.9M | 55.9 | 3 | 93.6% |
| GAA 2025 OO-1 | 7 | ₱512.1M | 93.8 | 4 | 67.7% |
| OTHER | 7 | ₱1.8B | 77.3 | 5 | 100.0% |
| GAA 2025 SSP | 2 | ₱151.4M | 94.8 | 2 | 64.6% |
| Bridges, Roads | 2 | ₱1.5B | 76.1 | 1 | 86.7% |
| Water Provision and Storage | 2 | ₱68.7M | 49.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 25JB0069PREVENTIVE MAINTENANCE RIZAL-DAKAK-DAPITAN COASTAL LOOP ROAD K1828+673.20-K1829+000, K1829+000-K1830+000,K1830+000-K1831+000,K1831+000-K1831+208.30 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 95% | High risk94 | Flagged0.002 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 25KH0064ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (S01247MN) - K1441+(-840) - K1441+817, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.2M | 79% | High risk94 | —-0.005 |
| 25KH0063ASSET PRES-PREV MAINT- PRIMARY ROADS BUT CITY-CAG DE ORO CITY-ILIGAN CITY RD (S01246MN) - K1441+291 - K1441+666, (S01246MN) - K1441+666 - K1441+832, (S01246MN) - K1441+832 - K1442+610, (S01246MN) - K1442+610 - K1443+350 (S01246MN) -K1443+350 - K1444+236 | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.1M | 80% | High risk94 | —-0.006 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 25KH0066ASSET PRES. - PREV. MAINT- TERTIARY RD CDO-CADRE CIRC. EXT RD (S00580MN) CH 0 - CH 755, (S00604MN) CH 0 - CH 556, CDO-CADRE CIRC EXT RD (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00602MN) CHAINAGE 0 - CHAINAGE 439, CDOC | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱53M | 95% | High risk93 | —-0.014 |
| 17J00071CONSTRUCTION OF KUMALARANG PSCG BRIDGE #3 AND APPROACHES ALONG IMELDA - BAYOG - KUMALARANG - LAPUYAN - MARGOSATUBIG ROAD, ZAMBOANGA DEL SUR, STA. 0+000.00 - STA. 0+600.00, ABUTMENT -A : STA. 0+260.00, ABUTMENT -B : STA. 0+350.84, RIVER PROTECTION NET LEN | Region IX | Region IX | Completed | ₱114.5M | 100% | High risk82 | —-0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23J00160PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱143.7M | 55% | High risk75 | —-0.010 |
| 18JI0072CONSTRUCTION OF BRIDGE AND ROAD APPROACHES, BRGY. CONCEPCION, ALICIA, Z.S | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱44.9M | 100% | High risk75 | —-0.012 |
| 25J00011CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (DOWNSTREAM - LEFT SI | Region IX | Region IX | On-Going | ₱145.6M | 63% | High risk74 | —-0.008 |
| 24J00155CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱173.6M | 93% | High risk74 | —-0.018 |
| 18J00015CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (CURUAN - LUBIGAN SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱127.7M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00287ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONCRETING ALONG NRJ BARANGAY SAN ISIDRO - SAS - KALAWIT - NAMNAMA, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱154.3M | 60% | High risk66 | Flagged0.049 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 22J00123CONSTRUCTION OF MISSING LINKS/NEW ROADS - SINDANGAN - BAYOG - LAKEWOOD ROAD, BIWA BRIDGE, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱64.3M | 24% | High risk62 | Flagged0.023 |
| 21J00067CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱134.2M | 67% | High risk73 | Flagged0.022 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 19J00134CONCRETING OF BRGY. GATA - GATA FMR, BRGY. GATA - GATA, PANGLIMA ESTINO, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk67 | Flagged0.008 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 19J00132CONCRETING OF BRGY. BATU UGIS FMR, BRGY. BATU UGIS, MAIMBUNG, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk68 | Flagged0.008 |
| 21J00086CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - REHABILITATION OF JOLO MAINLAND WATER DISTRICT, BRGY. ASTURIAS, JOLO, SULU | Region IX | Region IX | Completed | ₱173.2M | 100% | High risk70 | Flagged0.007 |
| 25J00032ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO- PAGADIAN- ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱112.1M | 13% | High risk67 | Flagged0.006 |
| 22J00045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DIPLO RIVER, DIPLO BRIDGE (B00551MN) (DOWNSTREAM) ALONG PAGADIAN - ZAMBOANGA CITY ROAD (S01453MN), ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱63M | 63% | High risk62 | Flagged0.004 |
| 22J00112PREVENTIVE MAINTENANCE - TERTIARY ROADS SANGA - SANGA BATO - BATO ROAD | Region IX | Region IX | On-Going | ₱57.9M | 76% | High risk66 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 21LD0074OFF-CARRIAGEWAY IMPROVEMENT: FLARING OF INTERSECTIONS/IMPROVEMENT OF INTERSECTIONS - DAVAO-COTABATO RD (DAVAO CITY-JCT DIGOS SECT) - K1561+220, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.090 |
| 277 | 17JF0041COMPLETION OF ZAMBOANGA SIBUGAY MEDICAL CENTER, TENAN, IPIL, ZAMBOANGA SIBUGAY | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | Flagged0.002 |
| 278 | 20KI0014CONSTRUCTION OF NEW BRIDGES, SIBULA BRIDGE ALONG OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA ROAD, LOPEZ JAENA, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱33.2M | 100% | Medium risk47 | —-0.051 |
| 279 | 20KI0013WIDENING OF PERMANENT BRIDGES TIPAN BRIDGE (B01101MN) ALONG OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA ROAD (PHASE II), OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱17.1M | 100% | Medium risk46 | —-0.064 |
| 280 | 20KD0029CONSTRUCTION OF QUALITY ASSURANCE BUILDING OF DPWH CAGAYAN DE ORO 2ND DEO, MACABALAN, CDOC | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱26M | 100% | Medium risk46 | —-0.090 |
| 281 | 22KH0041REHABILITATION/MAJOR REPAIR OF PERMANENT BIDGES CARMEN STEEL BR. (B01353MN) ALONG CARMEN-PATAG-BULUA ROAD, BRGY. CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱18.6M | 100% | Medium risk46 | —-0.064 |
| 282 | 25KH0027CONSTRUCTION OF ROAD WITH DRAINAGE, BARANGAY CANITOAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱24.4M | 90% | Medium risk45 | —-0.056 |
| 283 | 25KH0009ASSET PRESERVATION - CONSTRUCTION / UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1444 + 127 - K1444 + 227, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱18.1M | 92% | Medium risk45 | —-0.057 |
| 284 | 20KH0030ASSET PRESERVATION - PREVENTIVE MAINTENANCE -SECONDARY ROADS - CARMEN-PATAG BULUA RD (S00584MN) CHAINAGE 000-CHAINAGE 400, K1440+660-K1442+000,K1443+328-K1443+581, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱18.9M | 100% | Medium risk45 | —-0.095 |
| 285 | 21KD0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG SAYRE HIGWAY K1427+721 TO K1428+230 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱16.8M | 100% | Medium risk45 | —-0.096 |
| 286 | 20J00207CONCRETING OF BARANGAY LAMBAYONG FARM TO MARKET ROAD (FMR), BARANGAY LAMBAYONG, INDANAN, SULU | Region IX | Region IX | Completed | ₱12.2M | 100% | Medium risk45 | —-0.019 |
| 287 | 21JD0081CONCRETING OF BRGY. POBLACION NORTH FMR BRGY. POBLACION NORTH POLANCO,ZN | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱11.9M | 100% | Medium risk45 | —-0.039 |
| 288 | 23KH0010REHABILITATION OF IPONAN FLOOD CONTROL WORKS, REVETMENT IPONAN BRIDGE I & II - IPONAN BRIDGE III) ALONG IPONAN RIVER, BULUA SIDE STA 1+088 - STA. 1+441 WITH EXCEPTION, BRGY. IPONAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.080 |
| 289 | 20J00213CONCRETING OF TUBIG PARANG FARM TO MARKET ROAD (FMR), PARANG, INDANAN, SULU | Region IX | Region IX | Completed | ₱12.2M | 100% | Medium risk45 | —-0.019 |
| 290 | 19KH0034CONCRETING OF ROAD WITH DRAINAGE (ROAD1-4) MACANHAN, BRGY. CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱11.2M | 100% | Medium risk44 | —-0.097 |
| 291 | 22KC0074CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING BRGY. TANKULAN, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱7.4M | 100% | Medium risk42 | —-0.096 |
| 292 | 18JD0092CONSTRUCTION OF 1 UNIT 2 STY-4CL REGULAR WORKSHOP BUILDING LA LIBERTAD NHS, LA LIBERTAD, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱9.6M | 100% | Medium risk41 | —-0.043 |
| 293 | 18KD0054CONSTRUCTION OF 3 STOREY. 6 CLASSROOM SCHOOL BUILDING CONSOLACION ELEMENTARY SCHOOL | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱24.1M | 100% | Medium risk41 | —-0.043 |
| 294 | 17JB0172CONSTRUCTION OF FOUR (4) STOREY, SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT LANGATIAN NATIONAL HIGH SCHOOL, PRES. MANUEL A. ROXAS, ZAMBOANGA, DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.5M | 100% | Medium risk37 | —-0.004 |
| 295 | 17JB0165CONSTRUCTION OF THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT MANUKAN NATIONAL HIGH SCHOOL, MANUKAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱30M | 100% | Medium risk36 | —-0.007 |
| 296 | 17JB0111CONSTRUCTION OF THREE (3) STOREY NINE (9) CLASSROOM SCHOOL BUILDING AT DIPOLOG PILOT DEMONSTRATION SCHOOL, DIPOLOG CITY, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱25.3M | 100% | Medium risk35 | —-0.008 |
| 297 | 25J00139ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱4.2M | 5% | Medium risk32 | —-0.023 |
| 298 | 17KD0083CONST OF 4 STOREY 20 CL TECH VOC LIVELIHOOD & OTHER LAB WORKSHOP BLDG FOR BUGO NHS (SHS) | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱49.9M | 100% | Low risk27 | —-0.015 |
| 299 | 17KD0081CONST OF 3 STOREY 12 CL TECH VOC LIVELIHOOD & OTHER LAB WORKSHOP BLDG GUSA NHS-FS CATANICO ANNEX (SH | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱31M | 100% | Low risk21 | —-0.016 |
| 300 | 19KH0024CONCRETING OF ROAD, PUROK 3 (AWING AREA) UPPER CARMEN, BRGY. CARMEN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱2M | 100% | Low risk15 | —-0.093 |