Opening the dossier…
Opening the dossier…
Contractor dossier
300 projects on file, including joint ventures this contractor is part of.
Total projects
300
Total budget
₱23.9B
Average progress
94.5%
Completion rate
69.0%
Below 70%
Average risk score
61.4
High risk on average, out of 100
Flagged as unusual
24
8.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 276 | ₱20.4B | 62.1 | 21 | 94.5% |
| Region X | 21 | ₱729.3M | 51.3 | 1 | 95.4% |
| Central Office | 2 | ₱2.8B | 79.0 | 2 | 90.2% |
| Region XI | 1 | ₱39.2M | 47.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱15.8B | 60.6 | 7 | 96.2% |
| Flood Control and Drainage | 33 | ₱2.7B | 65.9 | 1 | 87.6% |
| Buildings and Facilities | 20 | ₱585.5M | 46.9 | 1 | 100.0% |
| Bridges | 17 | ₱669.9M | 55.9 | 3 | 93.6% |
| GAA 2025 OO-1 | 7 | ₱512.1M | 93.8 | 4 | 67.7% |
| OTHER | 7 | ₱1.8B | 77.3 | 5 | 100.0% |
| GAA 2025 SSP | 2 | ₱151.4M | 94.8 | 2 | 64.6% |
| Bridges, Roads | 2 | ₱1.5B | 76.1 | 1 | 86.7% |
| Water Provision and Storage | 2 | ₱68.7M | 49.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 25JB0069PREVENTIVE MAINTENANCE RIZAL-DAKAK-DAPITAN COASTAL LOOP ROAD K1828+673.20-K1829+000, K1829+000-K1830+000,K1830+000-K1831+000,K1831+000-K1831+208.30 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 95% | High risk94 | Flagged0.002 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 25KH0064ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (S01247MN) - K1441+(-840) - K1441+817, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.2M | 79% | High risk94 | —-0.005 |
| 25KH0063ASSET PRES-PREV MAINT- PRIMARY ROADS BUT CITY-CAG DE ORO CITY-ILIGAN CITY RD (S01246MN) - K1441+291 - K1441+666, (S01246MN) - K1441+666 - K1441+832, (S01246MN) - K1441+832 - K1442+610, (S01246MN) - K1442+610 - K1443+350 (S01246MN) -K1443+350 - K1444+236 | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱77.1M | 80% | High risk94 | —-0.006 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 25KH0066ASSET PRES. - PREV. MAINT- TERTIARY RD CDO-CADRE CIRC. EXT RD (S00580MN) CH 0 - CH 755, (S00604MN) CH 0 - CH 556, CDO-CADRE CIRC EXT RD (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00581MN) CHAINAGE 0 - CHAINAGE 473, (S00602MN) CHAINAGE 0 - CHAINAGE 439, CDOC | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱53M | 95% | High risk93 | —-0.014 |
| 17J00071CONSTRUCTION OF KUMALARANG PSCG BRIDGE #3 AND APPROACHES ALONG IMELDA - BAYOG - KUMALARANG - LAPUYAN - MARGOSATUBIG ROAD, ZAMBOANGA DEL SUR, STA. 0+000.00 - STA. 0+600.00, ABUTMENT -A : STA. 0+260.00, ABUTMENT -B : STA. 0+350.84, RIVER PROTECTION NET LEN | Region IX | Region IX | Completed | ₱114.5M | 100% | High risk82 | —-0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23J00160PREVENTIVE MAINTENANCE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱143.7M | 55% | High risk75 | —-0.010 |
| 18JI0072CONSTRUCTION OF BRIDGE AND ROAD APPROACHES, BRGY. CONCEPCION, ALICIA, Z.S | Region IX | Zamboanga Sibugay 1st DEO | Completed | ₱44.9M | 100% | High risk75 | —-0.012 |
| 25J00011CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (DOWNSTREAM - LEFT SI | Region IX | Region IX | On-Going | ₱145.6M | 63% | High risk74 | —-0.008 |
| 24J00155CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱173.6M | 93% | High risk74 | —-0.018 |
| 18J00015CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BUENAVISTA - BOLONG COASTAL BYPASS ROAD (CURUAN - LUBIGAN SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱127.7M | 100% | High risk73 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00287ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONCRETING ALONG NRJ BARANGAY SAN ISIDRO - SAS - KALAWIT - NAMNAMA, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱154.3M | 60% | High risk66 | Flagged0.049 |
| 25J00036PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱78M | 50% | High risk95 | Flagged0.032 |
| 22J00123CONSTRUCTION OF MISSING LINKS/NEW ROADS - SINDANGAN - BAYOG - LAKEWOOD ROAD, BIWA BRIDGE, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱64.3M | 24% | High risk62 | Flagged0.023 |
| 21J00067CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN - BAYOG - LAKEWOOD ROAD, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱134.2M | 67% | High risk73 | Flagged0.022 |
| 25J00056ROAD WIDENING - PRIMARY ROADS MAHARLIKA HIGHWAY (PAGADIAN CITY - ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱64.3M | 12% | High risk94 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Central Office | Roads Management Cluster II (Multilateral) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
| 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 23JA0021CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BUNGUIAO FLOOD CONTROL STRUCTURE, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.9M | 100% | High risk81 | Flagged0.017 |
| 25JB0071PREVENTIVE MAINTENANCE POLANCO-MACLEODES ROAD K1832+013.40-K1833+000, K1833+000-K1834+704.10 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱93.5M | 55% | High risk94 | Flagged0.014 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Central Office | Roads Management Cluster II (Multilateral) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 23JB0048REHAB/RECONST OF NATIONAL RD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY ROAD K1878+900-K1878+979.60, K1879+100-K1879+180 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱24.2M | 100% | High risk77 | Flagged0.010 |
| 23JB0010CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) OPAO, DAPITAN CITY,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱4.9M | 100% | High risk78 | Flagged0.009 |
| 25KH0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CDO-AIRPORT-BUKIDNON RD - K1440 + 900 - K1442 + 422, K1445 + 000 - K1447 + 500, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱73.4M | 79% | High risk95 | Flagged0.009 |
| 19J00134CONCRETING OF BRGY. GATA - GATA FMR, BRGY. GATA - GATA, PANGLIMA ESTINO, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk67 | Flagged0.008 |
| 25JB0025PREVENTIVE MAINTENANCE DIPOLOG-PUNTA-DANSULLAN-S. OSMEÑA-ZAMBOANGA DEL NORTE/SUR BDRY RD K1872+402-K1873+887.70 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱53.5M | 57% | High risk94 | Flagged0.008 |
| 19J00132CONCRETING OF BRGY. BATU UGIS FMR, BRGY. BATU UGIS, MAIMBUNG, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk68 | Flagged0.008 |
| 21J00086CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - REHABILITATION OF JOLO MAINLAND WATER DISTRICT, BRGY. ASTURIAS, JOLO, SULU | Region IX | Region IX | Completed | ₱173.2M | 100% | High risk70 | Flagged0.007 |
| 25J00032ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO- PAGADIAN- ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱112.1M | 13% | High risk67 | Flagged0.006 |
| 22J00045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DIPLO RIVER, DIPLO BRIDGE (B00551MN) (DOWNSTREAM) ALONG PAGADIAN - ZAMBOANGA CITY ROAD (S01453MN), ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱63M | 63% | High risk62 | Flagged0.004 |
| 22J00112PREVENTIVE MAINTENANCE - TERTIARY ROADS SANGA - SANGA BATO - BATO ROAD | Region IX | Region IX | On-Going | ₱57.9M | 76% | High risk66 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 20J00019PREVENTIVE MAINTENANCE - SECONDARY ROADS ASPHALT OVERLAY OF SINDANGAN - SIAYAN - DUMINGAG - MAHAYAG ROAD, SINDANGAN - SIAYAN SECTION | Region IX | Region IX | Completed | ₱101.4M | 100% | High risk68 | —-0.073 |
| 77 | 24JB0053REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS RIZAL-DAKAK-DAPITAN COASTAL LOOP RD K1799+897-1800+000, K1800+460-K1801+587, K1856+005-K1856+985 | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱95.5M | 76% | High risk68 | —-0.037 |
| 78 | 22J00016PREVENTIVE MAINTENANCE - SECONDARY ROADS - RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD | Region IX | Region IX | On-Going | ₱113.5M | 96% | High risk68 | —-0.016 |
| 79 | 18J00078CONSTRUCTION OF BYPASS AND DIVERSION ROADS - JCT. NAT'L. HIGHWAY R.T. LIM - JCT. NAT'L. HIGHWAY SIOCON ROAD, (SURABAY-SAN FERNANDINO), ZAMBOANGA SIBUGAY | Region IX | Region IX | Completed | ₱284.5M | 100% | High risk68 | —-0.039 |
| 80 | 18J00028ROAD WIDENING DIPOLOG - SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE 1ST DEO, K1873+862.00 - K1875+233.00, K1875+377.00 - K1877+534.00, K1881+560.00 - K1884+449.95, K1884+449.95 - K1885+210.00, NET LENGTH: 14.36 LANE KM/7,178.00 LN.M./7.178 KM | Region IX | Region IX | Completed | ₱187.1M | 100% | High risk68 | —-0.057 |
| 81 | 18J00036ROAD WIDENING SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE 2ND DEO, K1958+474.00 - K1960+994.00, K1961+132.00 - K1962+180.00, NET LENGTH: 7.14 LANE KM/3,568.00 LN.M./3.568 KM | Region IX | Region IX | Completed | ₱99.9M | 100% | High risk68 | —-0.070 |
| 82 | 20J00188CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD ALONG PAGASINAN TO LUUK TULAY, PATA, SULU | Region IX | Region IX | Completed | ₱14.2M | 100% | High risk68 | —-0.040 |
| 83 | 19J00132CONCRETING OF BRGY. BATU UGIS FMR, BRGY. BATU UGIS, MAIMBUNG, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk68 | Flagged0.008 |
| 84 | 19J00134CONCRETING OF BRGY. GATA - GATA FMR, BRGY. GATA - GATA, PANGLIMA ESTINO, SULU | Region IX | Region IX | Completed | ₱14.7M | 100% | High risk67 | Flagged0.008 |
| 85 | 19J00041PAVING OF UNPAVED ROADS - SECONDARY ROADS - RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD | Region IX | Region IX | Completed | ₱96.2M | 100% | High risk67 | —-0.075 |
| 86 | 20J00018PREVENTIVE MAINTENANCE - PRIMARY ROADS ASPHALT OVERLAY OF DIPOLOG - OROQUIETA NATIONAL ROAD ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱102.5M | 100% | High risk67 | —-0.074 |
| 87 | 17J00111IMPROVEMENT/CONCRETING OF BALIGUIAN COASTAL ROAD JUNCTION BALIGUIAN - KAUSWAGAN - MAMAD SECTION, ZAMBOANGA DEL NORTE (2ND DEO) STA. 2047+640.00 - STA. 2048+180.00, STA. 2048+610.00 - STA. 2050+984.86, STA. 2051+050.00 - STA. 2051+967.40, NET LENGTH: 7.665 | Region IX | Region IX | Completed | ₱172.7M | 100% | High risk67 | —-0.029 |
| 88 | 17J00065ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA DEL SUR COASTAL ROAD, ZAMBOANGA DEL SUR 2ND DEO, CHAINAGE 0000.00 - CHAINAGE 3107.63, EXCEPTION: CHAINAGE 0915.00 - CHAINAGE 1220.00, NET LENGTH: 5.61 LANE KM | Region IX | Region IX | Completed | ₱87.3M | 100% | High risk67 | —-0.044 |
| 89 | 25J00032ROAD WIDENING - PRIMARY ROADS - MAHARLIKA HIGHWAY (LANAO- PAGADIAN- ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱112.1M | 13% | High risk67 | Flagged0.006 |
| 90 | 17J00079ROAD WIDENING INCLUDING DRAINGE OF NATIONAL ROADS ALONG N1 OF LANAO - PAGADIAN - ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY (2ND DEO) K1770+539.00 - K1773+295.87, K1773+323.83 - K1775+094.29 (NET LENGTH: 4,527.33 LN.M.) | Region IX | Region IX | Completed | ₱112.9M | 100% | High risk67 | —-0.044 |
| 91 | 17J00076ROAD UPGRADING (GRAVEL TO PAVED) OF IMELDA - BAYOG - KUMALARANG - MARGOSATUBIG ROAD, ZAMBOANGA SIBUGAY 1ST DEO, K1767+106.00 TO K1768+463.07, K1770+555.00 TO K1770+730.00, K1770+950.08 TO K1770+967.00, K1771+150.00 TO K1771+460.00, NET LENGTH: 1,858.99 LN | Region IX | Region IX | Completed | ₱123.5M | 100% | High risk67 | —-0.042 |
| 92 | 19J00013REPLACEMENT OF PERMANENT WEAK BRIDGE - VITALI BRIDGE (PARALLEL BRIDGE) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱89.6M | 100% | High risk67 | Flagged0.017 |
| 93 | 17J00043ROAD WIDENING INCLUDING DRAINAGE OF DIPOLOG-OROQUIETA NATIONAL ROAD, ZAMBOANGA DEL NORTE 3RD DEO, K 1826 +588.00 - K 1829 +543.00 (NET LENGTH: 2,969.000 LN.M.) | Region IX | Region IX | Completed | ₱94.9M | 100% | High risk66 | —-0.047 |
| 94 | 23JA0001ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS: ASPHALT OVERLAY- PAGADIAN CITY-ZAMBOANGA CITY RD - K1902 + 747 - K1904 + 502 | Region IX | Zamboanga City 2nd DEO | Completed | ₱67.5M | 100% | High risk66 | —-0.075 |
| 95 | 23JA0002ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS: ASPHALT OVERLAY - PAGADIAN CITY-ZAMBOANGA CITY RD - K1917 + 182 - K1918 + 400 | Region IX | Zamboanga City 2nd DEO | Completed | ₱64.9M | 100% | High risk66 | —-0.072 |
| 96 | 22J00112PREVENTIVE MAINTENANCE - TERTIARY ROADS SANGA - SANGA BATO - BATO ROAD | Region IX | Region IX | On-Going | ₱57.9M | 76% | High risk66 | Flagged0.003 |
| 97 | 22J00114PREVENTIVE MAINTENANCE - TERTIARY ROADS TUNGUSONG -TUBIG INDANGAN ROAD | Region IX | Region IX | On-Going | ₱58.4M | 100% | High risk66 | —-0.005 |
| 98 | 22J00110ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS - BATO-BATO - TARAWAKAN ROAD | Region IX | Region IX | On-Going | ₱57.8M | 100% | High risk66 | —-0.006 |
| 99 | 22J00111PREVENTIVE MAINTENANCE - TERTIARY ROADS BONGAO - PAHUT SANGA - SANGA ROAD | Region IX | Region IX | On-Going | ₱57.9M | 100% | High risk66 | —-0.006 |
| 100 | 20J00038CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY - CONSTRUCTION OF WESTERN MINDANAO COMMAND (WMC) - HOSPITAL BUILDING, CAMP NAVARRO, ZAMBOANGA CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | Completed | ₱96.3M | 100% | High risk66 | —-0.052 |