Contractor dossier
138 projects on file, including joint ventures this contractor is part of.
Total projects
138
Total budget
₱5.4B
Average progress
89.1%
Completion rate
42.8%
Below 70%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
18
13.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 138 | ₱5.4B | 56.3 | 18 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 80 | ₱3.6B | 52.3 | 5 | 89.8% |
| Buildings and Facilities | 21 | ₱223.9M | 51.1 | 0 | 97.0% |
| Bridges | 10 | ₱199.3M | 49.0 | 0 | 99.0% |
| OTHER | 9 | ₱677.1M | 84.2 | 8 | 66.7% |
| Flood Control and Drainage | 9 | ₱291.6M | 48.5 | 0 | 100.0% |
| GAA 2025 SSP | 5 | ₱183M | 95.6 | 4 | 65.5% |
| GAA 2025 OO-1 | 2 | ₱57.9M | 91.9 | 1 | 50.3% |
| GAA 2025 OO-2 | 2 | ₱76M | 86.2 | 0 | 81.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00059SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0755+085 - K0755+170, K0755+170 - K0756+000, K | Region VIII | Region VIII | On-Going | ₱46.6M | 41% | High risk96 | Flagged0.024 |
| 25IK0047CSSP- SIPAG- INTERJURISDICTIONALROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION) CONST. OF ROAD, BRGY. BAGACAY TO BRGY. CONCORD, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 75% | High risk96 | Flagged0.014 |
| 25IK0052CSSP-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ACCESS ROAD, POB. 1 TO BRGY, BOTAERA, ZUMARRAGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.3M | 18% | High risk96 | Flagged0.027 |
| 25IJ0002CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, STO. NIÑO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱38.9M | 94% | High risk96 | Flagged0.004 |
| 25IJ0008CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TAGAPUL-AN, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱38.8M | 100% | High risk96 | —-0.000 |
| 25IJ0060OO1: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED ROADS - TERTIARY ROADS CALBAYOG DIVERSION RD. K0739+000 - K0740+000 | Region VIII | Samar 1st DEO | On-Going | ₱34.4M | 10% | High risk92 | Flagged0.017 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 25IJ0026OO1: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CALBAYOG DIVERSION RD. - K0733+030 - K0733+347, K0738+000 - K0738+505, K0738+700 - K0739+000 | Region VIII | Samar 1st DEO | On-Going | ₱23.5M | 90% | High risk92 | —-0.004 |
| 25IK0033CONCRETING OF BRGY. ALBALATE TO BRGY. CAGUTIAN TO BRGY. CAGUSIPAN FMR, BRGY. ALBALATE, BRGY. CAGUTIAN, BRGY. CAGUSIPAN, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.9M | 34% | High risk89 | Flagged0.059 |
| 25IK0034CONCRETING OF BRGY. BACYARAN TO BRGY. BULAO FMR, BRGY. BACYARAN AND BRGY. BULAO, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.9M | 64% | High risk89 | Flagged0.051 |
| 25IJ0017OO2: CONTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY PIZARRO, GANDARA, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱42.8M | 82% | High risk87 | —-0.014 |
| 25IK0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DOLONGAN, BASEY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱33.2M | 80% | High risk85 | —-0.012 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 24IK0094CONSTRUCTION OF CONCRTE ROAD, BRGY. LAGUNDI TO BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.4M | 59% | High risk83 | Flagged0.018 |
| 24IJ0078CSSP: CONSTRUCTION OF ROAD, BRGY. DEIT - BRGY. MAHAYAG, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱59M | 86% | High risk81 | Flagged0.006 |
| 24IK0069CONST. OF ROAD, POBLACION TO BARANGAY SOONG, STA. 0+000.00-STA. 1+965.00, DARAM, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱47.7M | 77% | High risk80 | Flagged0.006 |
| 24IK0068CONST. OF ROAD, BARANGAY ASTORGA TO BARANGAY SAN VICENTE, STA. 0+000.00-STA. 1+965.00, DARAM, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱47.7M | 63% | High risk80 | Flagged0.012 |
| 17IK0001CLUSTER I - PREVENTIVE MAINT. WRIGHT OLD ROUTE, KO826+797-KO826+182; SAN JUANICO-BASEY-SOHOTON ROAD, KO896+290-KO900+500 & KO900+850-KO907+450; SAN JUANICO-BASEY-SOHOTON ROAD, KO909+278-KO909+422 | Region VIII | Samar 2nd DEO | Completed | ₱27.9M | 100% | High risk78 | —-0.035 |
| 21I00056CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND | Region VIII | Region VIII | On-Going | ₱443.9M | 95% | High risk66 | Flagged0.010 |
| 22IK0082CONST. OF MULTI-PURPOSE BUILDING, BRGY. ROÑO, MARABUT, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.8M | 100% | High risk66 | —-0.073 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 25IK0033CONCRETING OF BRGY. ALBALATE TO BRGY. CAGUTIAN TO BRGY. CAGUSIPAN FMR, BRGY. ALBALATE, BRGY. CAGUTIAN, BRGY. CAGUSIPAN, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.9M | 34% | High risk89 | Flagged0.059 |
| 25IK0034CONCRETING OF BRGY. BACYARAN TO BRGY. BULAO FMR, BRGY. BACYARAN AND BRGY. BULAO, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.9M | 64% | High risk89 | Flagged0.051 |
| 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 25IK0052CSSP-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ACCESS ROAD, POB. 1 TO BRGY, BOTAERA, ZUMARRAGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.3M | 18% | High risk96 | Flagged0.027 |
| 17IK0020ROAD WIDENING - DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR) K0883+000-KO833+600; KO886+210-KO886+719; KO886+735-KO886+846; KO886+862-KO887+200; KO887+850-KO887+800; KO888+950-KO889+480; KO890+460-KO890+600; KO890+710-KO891+419...,KO893+230-KO894+100 | Region VIII | Samar 2nd DEO | On-Going | ₱147.9M | 100% | High risk63 | Flagged0.025 |
| 25I00059SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0755+085 - K0755+170, K0755+170 - K0756+000, K | Region VIII | Region VIII | On-Going | ₱46.6M | 41% | High risk96 | Flagged0.024 |
| 21IK0056CONCRETING OF BRGY. SAN ANDRES TO BRGY. INARUMBACAN FMR, VILLAREAL, SAMAR, STA. 0+000.000 - STA. 0+700.00 | Region VIII | Samar 2nd DEO | On-Going | ₱16.1M | 64% | Medium risk51 | Flagged0.024 |
| 24IK0094CONSTRUCTION OF CONCRTE ROAD, BRGY. LAGUNDI TO BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱96.4M | 59% | High risk83 | Flagged0.018 |
| 25IJ0060OO1: ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED ROADS - TERTIARY ROADS CALBAYOG DIVERSION RD. K0739+000 - K0740+000 | Region VIII | Samar 1st DEO | On-Going | ₱34.4M | 10% | High risk92 | Flagged0.017 |
| 25IK0047CSSP- SIPAG- INTERJURISDICTIONALROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTION) CONST. OF ROAD, BRGY. BAGACAY TO BRGY. CONCORD, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 75% | High risk96 | Flagged0.014 |
| 24IK0068CONST. OF ROAD, BARANGAY ASTORGA TO BARANGAY SAN VICENTE, STA. 0+000.00-STA. 1+965.00, DARAM, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱47.7M | 63% | High risk80 | Flagged0.012 |
| 21I00056CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ACCESS ROAD FROM LITERON - ANTOL IN CALBIGA TO CANLOBO - LAYO - MAGDAWAT - PELAON OF PINABACDAO TO MABINI IN BASEY CONNECTING ...SAMAR 2ND | Region VIII | Region VIII | On-Going | ₱443.9M | 95% | High risk66 | Flagged0.010 |
| 22IK0037CONST. OF ROAD, BRGY. LOKILOKON-PARANAS-LAWAAN-CONCEPTION-CANLIGUES-PACO-CALAPI-HINICA-AN-CARANAS-BABACLAYON-HIDUROMA-SAN JOSE DE BUAN-CANAPOTE-SAN NICOLAS-SITIO SALVACION-AGUINAYAN-GUSA, SAMAR, BRGY. CARANAS, MOTIONG, SAMAR, BRGY. BABACLAYON, HIDUROMA, H | Region VIII | Samar 2nd DEO | On-Going | ₱86M | 92% | Medium risk59 | Flagged0.009 |
| 24IK0069CONST. OF ROAD, POBLACION TO BARANGAY SOONG, STA. 0+000.00-STA. 1+965.00, DARAM, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱47.7M | 77% | High risk80 | Flagged0.006 |
| 24IJ0078CSSP: CONSTRUCTION OF ROAD, BRGY. DEIT - BRGY. MAHAYAG, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱59M | 86% | High risk81 | Flagged0.006 |
| 25IJ0002CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, STO. NIÑO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱38.9M | 94% | High risk96 | Flagged0.004 |
| 23IK0082CONCRETING OF BRGY. CONCORD FMR, BRGY. CONCORD, HINABANGAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱12.8M | 100% | Medium risk44 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23IJ0033CSSP: CONSTRUCTION OF ROAD, LIBUCAN DAKU CIRCUMFERENTIAL ROAD, TARANGNAN, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.095 |
| 52 | 24IJ0025CSSP: CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TAGAPUL-AN, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱48.9M | 100% | Medium risk53 | —-0.058 |
| 53 | 21IK0057CONCRETING OF BRGY. PACAO TO BRGY. BANQUIL FMR PHASE II, VILLAREAL, SAMAR, STA. 0+000.000 - STA. 0+760.00 | Region VIII | Samar 2nd DEO | Completed | ₱16.6M | 100% | Medium risk53 | —-0.041 |
| 54 | 24IJ0039(RE-ADVERTISED) OO1: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, TERTIARY ROADS, CALBAYOG DIVERSION RD, K0737+572 - K0737+852, K0737+928 - K0738+291, K0738+295 - K0738+323, K0738+328 - K0738+545, K0738+627 - K0738+908 | Region VIII | Samar 1st DEO | On-Going | ₱49.1M | 100% | Medium risk52 | —-0.053 |
| 55 | 23IJ0058CSSP: CONSTRUCTION OF ROAD, BUGTONG - BAYO, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.9M | 100% | Medium risk52 | —-0.094 |
| 56 | 23IJ0045CSSP: (RE-ADVERTISED) CONSTRUCTION OF ROAD PHASE 1, BRGY. CURRY - AGRUFACION TO BRGY. JOLACAO - CAMPERITO, STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.5M | 100% | Medium risk52 | —-0.094 |
| 57 | 24IK0052CONCRETING OF SITIO RAWIS, BRGY. AMANDAYEHAN TO BRGY. SAN ANTONIO (COASTAL ROAD) FMR, BASEY, SAMAR (STA. 0+285.00 - STA. 0+647.00, BASEY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.7M | 100% | Medium risk52 | —-0.003 |
| 58 | 23IJ0016CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO SULPAN CAVE, MATUGUINAO, SAMAR | Region VIII | Samar 1st DEO | On-Going | ₱48.8M | 100% | Medium risk52 | —-0.044 |
| 59 | 23IJ0082CSSP: CONSTRUCTION OF GANDARA - MATUGINAO - LAS NAVAS ROAD, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.093 |
| 60 | 23IK0099CONST. OF MULTI-PURPOSE BUILDING, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱12.6M | 59% | Medium risk52 | —-0.030 |
| 61 | 24IJ0049CSSP: (CLUSTER): CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, 1. BARANGAY IMELDA, TARANGNAN, SAMAR 2. BARANGAY CAMBATOTAY VIEJO, TARANGNAN, SAMAR 3. BARANGAY ALCAZAR, TARANGNAN, SAMAR 4. BARANGAY LUCERDONE, TARANGNAN, SAMAR 5. BARANGAY TIZON, TARA | Region VIII | Samar 1st DEO | Completed | ₱14.8M | 100% | Medium risk52 | —-0.097 |
| 62 | 22IK0062CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BURAY, PARANAS, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.095 |
| 63 | 21IK0056CONCRETING OF BRGY. SAN ANDRES TO BRGY. INARUMBACAN FMR, VILLAREAL, SAMAR, STA. 0+000.000 - STA. 0+700.00 | Region VIII | Samar 2nd DEO | On-Going | ₱16.1M | 64% | Medium risk51 | Flagged0.024 |
| 64 | 23IK0081CONSTRUCTION OF EVACUATION CENTER, BRGY. SALVACION, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱9.7M | 100% | Medium risk51 | —-0.096 |
| 65 | 24IK0055CONCRETING OF SITIO CANBUYOG, BRGY. BORONG TO BRGY. MINATA FMR, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱14.8M | 100% | Medium risk51 | —-0.003 |
| 66 | 22IK0081CONST. OF MULTI-PURPOSE BUILDING, BRGY. LUPIG, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.096 |
| 67 | 22IK0021CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAROBAYBAY, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.9M | 100% | Medium risk51 | —-0.096 |
| 68 | 22IK0094REHABILITATION OF HEALTH CENTER, BRGY. NAVATAS DAKU, TALALORA, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.098 |
| 69 | 24IK0059REHAB. OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. FERRERAS, MARABUT, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.096 |
| 70 | 22IK0012REHAB./RECON./UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), K0849+925 - K0851+200, BRGY. BACYARAN, CALBIGA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱37.4M | 89% | Medium risk50 | —-0.030 |
| 71 | 24IK0030CONSTRUCTION OF ROAD, BARANGAY DOLORES-BARANGAY HITAASAN, SAN SEBASTIAN, SAMAR- STA. 0+000-STA. 0+293, STA. 0+302-STA. 0+991, STA. 1+367-STA. 2+055, SAN SEBASTIAN, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.3M | 100% | Medium risk50 | —-0.050 |
| 72 | 22IK0078ASSET PRESERVATION-REHAB./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS ALONG DAANG MAHARLIKA (SM) (SN JUANICO BR.), K0860+200-K0860+450, BRGY. MADALUNOT, PINABACDAO, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.094 |
| 73 | 22IK0093CONST. OF OFFICERS QUARTERS AND EP BARRACKS, ISAFP, CAMP GENERAL VICENTE LUKBAN, CAMP LUKBAN, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱7.7M | 100% | Medium risk50 | —-0.095 |
| 74 | 23IK0047PREVENTIVE MAINT. - SECONDARY ROADS (BASEY-MARABUT-PINAMITINAN RD), K0913+000-K0913+834, K0914+003-K0914+223, BASEY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱30.3M | 14% | Medium risk50 | —-0.014 |
| 75 | 23IK0100CONSTRUCTION OF MULTI-PURPOSE BUILDING, ILANG-ILANG ST., BARANGAY SAN PABLO, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱6.8M | 100% | Medium risk50 | —-0.095 |