Opening the dossier…
Opening the dossier…
Contractor dossier
194 projects on file, including joint ventures this contractor is part of.
Total projects
194
Total budget
₱9.5B
Average progress
91.6%
Completion rate
75.3%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
12
6.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 188 | ₱9.3B | 57.2 | 9 | 93.1% |
| Region IV-B | 4 | ₱26.6M | 50.2 | 3 | 33.6% |
| Region I | 1 | ₱141.4M | 67.0 | 0 | 60.9% |
| National Capital Region | 1 | ₱5.8M | 47.4 | 0 | 90.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 69 | ₱3.4B | 56.7 | 0 | 91.9% |
| Flood Control and Drainage | 64 | ₱3.7B | 54.1 | 1 | 96.3% |
| Bridges | 28 | ₱674M | 50.1 | 0 | 98.4% |
| OTHER | 21 | ₱1.3B | 77.3 | 9 | 83.4% |
| Buildings and Facilities | 8 | ₱216M | 49.1 | 0 | 72.1% |
| Water Provision and Storage | 2 | ₱9.8M | 44.1 | 2 | 0.2% |
| GAA 2025 OO-2 | 1 | ₱85.9M | 91.9 | 0 | 94.1% |
| GAA 2025 OO-1 | 1 | ₱19M | 90.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FC0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MATOGDON RIVER, BARANGAY BAUTISTA, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱85.9M | 94% | High risk92 | —-0.018 |
| 23F00441CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱144.7M | 51% | High risk92 | Flagged0.072 |
| 25FC0010NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS STA. ELENA - CAPALONGA BY PASS COASTAL RD - K0281+893 - K0282+220, CAPALONGA, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱19M | 100% | High risk91 | —-0.011 |
| 24F00507ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG | Region V | Region V | On-Going | ₱140.4M | 37% | High risk90 | Flagged0.069 |
| 23F00410CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD AT BARANGAY PAMBUHAN, MERCEDES, CAMARINES NORTE-(PHAS | Region V | Region V | On-Going | ₱96.1M | 28% | High risk82 | Flagged0.027 |
| 24F00237CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRTUCITON OF CONGW. MARISOL C. PANOT | Region V | Region V | On-Going | ₱94.6M | 60% | High risk82 | Flagged0.007 |
| 24F00238CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCITON OF CONGW. MARISOL C. PANOTE | Region V | Region V | On-Going | ₱94.2M | 75% | High risk82 | Flagged0.003 |
| 24FC0049CONSTRUCTION OF STA. ROSA NORTE - SAN RAFAEL - SITIO SUGSUGIN PARANG ROAD TO BARANGAY NAKALAYA, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱99M | 88% | High risk80 | Flagged0.004 |
| 23FC0046CONSTRUCTION OF ROAD, BRGY. MAHAWANHAWAN - BRGY. MASALONG, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 23F00440CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱140.3M | 30% | High risk78 | Flagged0.042 |
| 22FC0013NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LABO BYPASS ROAD, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | Region V | On-Going | ₱88.8M | 61% | High risk77 | Flagged0.022 |
| 21FC0129CONSTRUCTION OF BY-PASS ROAD WITH SEAWALL AT BRGY. PARANG - SOUTH POBLACION, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.022 |
| 22FC0111CONSTRUCTION OF BYPASS ROAD OF CORY AQUINO BLVD., BRGY. DEL CARMEN, TALISAY, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱47.7M | 100% | High risk75 | —-0.034 |
| 22FC0066CONSTRUCTION OF ROAD, BARANGAY MALATAP, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱38.9M | 100% | High risk75 | —-0.032 |
| 22FC0093CONSTRUCTION OF ROAD, BARANGAY CALABASA - BARANGAY BAAY, LABO, CAMARINES NORTE, BRGY. CALABASA, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱47.5M | 100% | High risk74 | —-0.026 |
| 22FC0081CONSTRUCTION OF ROAD, BARANGAY SAN FELIPE BASUD - SITIO PATAG, BARANGAY SAN ISIDRO, SAN LORENZO RUIZ, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱28.8M | 100% | High risk74 | —-0.029 |
| 22FC0115CONSTRUCTION OF DIVERSION / BY-PASS ROAD OF CORY AQUINO BOULEVARD, BARANGAY DEL CARMEN, TALISAY - CALANGCAWAN SUR, VINZONS, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱19.1M | 100% | High risk74 | —-0.035 |
| 22FC0186CONSTRUCTION OF ROAD, SITIO NABOONGAN, BRGY. DAGUIT TO LABO - SITIO IGANG, BRGY. BATOBALANI, PARACALE, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱19M | 87% | High risk74 | Flagged0.010 |
| 24EE0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, PALAWAN STATE UNIVERSITY CUYO CAMPUS, CUYO, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱11.9M | 65% | High risk73 | Flagged0.017 |
| 22FC0060CONSTRUCTION OF ROAD, BARANGAYS TAMISAN, STA. CRUZ AND SAN JOSE, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱23.8M | 100% | High risk73 | —-0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23F00441CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱144.7M | 51% | High risk92 | Flagged0.072 |
| 24F00507ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG | Region V | Region V | On-Going | ₱140.4M | 37% | High risk90 | Flagged0.069 |
| 23F00440CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱140.3M | 30% | High risk78 | Flagged0.042 |
| 23F00410CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD AT BARANGAY PAMBUHAN, MERCEDES, CAMARINES NORTE-(PHAS | Region V | Region V | On-Going | ₱96.1M | 28% | High risk82 | Flagged0.027 |
| 22FC0013NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LABO BYPASS ROAD, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | Region V | On-Going | ₱88.8M | 61% | High risk77 | Flagged0.022 |
| 24EE0072CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM, LUCBUAN, MAGSAYSAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱4.9M | 0% | Medium risk44 | Flagged0.018 |
| 24EE0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, PALAWAN STATE UNIVERSITY CUYO CAMPUS, CUYO, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱11.9M | 65% | High risk73 | Flagged0.017 |
| 24EE0073CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM, COCORO, MAGSAYSAY, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱4.9M | 0% | Medium risk44 | Flagged0.015 |
| 22FC0186CONSTRUCTION OF ROAD, SITIO NABOONGAN, BRGY. DAGUIT TO LABO - SITIO IGANG, BRGY. BATOBALANI, PARACALE, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱19M | 87% | High risk74 | Flagged0.010 |
| 24F00237CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRTUCITON OF CONGW. MARISOL C. PANOT | Region V | Region V | On-Going | ₱94.6M | 60% | High risk82 | Flagged0.007 |
| 24FC0049CONSTRUCTION OF STA. ROSA NORTE - SAN RAFAEL - SITIO SUGSUGIN PARANG ROAD TO BARANGAY NAKALAYA, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱99M | 88% | High risk80 | Flagged0.004 |
| 24F00238CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCITON OF CONGW. MARISOL C. PANOTE | Region V | Region V | On-Going | ₱94.2M | 75% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25FC0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MATOGDON RIVER, BARANGAY BAUTISTA, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱85.9M | 94% | High risk92 | —-0.018 |
| 2 | 23F00441CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱144.7M | 51% | High risk92 | Flagged0.072 |
| 3 | 25FC0010NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS STA. ELENA - CAPALONGA BY PASS COASTAL RD - K0281+893 - K0282+220, CAPALONGA, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱19M | 100% | High risk91 | —-0.011 |
| 4 | 24F00507ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG | Region V | Region V | On-Going | ₱140.4M | 37% | High risk90 | Flagged0.069 |
| 5 | 23F00410CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD AT BARANGAY PAMBUHAN, MERCEDES, CAMARINES NORTE-(PHAS | Region V | Region V | On-Going | ₱96.1M | 28% | High risk82 | Flagged0.027 |
| 6 | 24F00237CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRTUCITON OF CONGW. MARISOL C. PANOT | Region V | Region V | On-Going | ₱94.6M | 60% | High risk82 | Flagged0.007 |
| 7 | 24F00238CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCITON OF CONGW. MARISOL C. PANOTE | Region V | Region V | On-Going | ₱94.2M | 75% | High risk82 | Flagged0.003 |
| 8 | 24FC0049CONSTRUCTION OF STA. ROSA NORTE - SAN RAFAEL - SITIO SUGSUGIN PARANG ROAD TO BARANGAY NAKALAYA, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱99M | 88% | High risk80 | Flagged0.004 |
| 9 | 23FC0046CONSTRUCTION OF ROAD, BRGY. MAHAWANHAWAN - BRGY. MASALONG, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 10 | 23F00440CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | Region V | On-Going | ₱140.3M | 30% | High risk78 | Flagged0.042 |
| 11 | 22FC0013NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LABO BYPASS ROAD, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | Region V | On-Going | ₱88.8M | 61% | High risk77 | Flagged0.022 |
| 12 | 21FC0129CONSTRUCTION OF BY-PASS ROAD WITH SEAWALL AT BRGY. PARANG - SOUTH POBLACION, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.022 |
| 13 | 22FC0111CONSTRUCTION OF BYPASS ROAD OF CORY AQUINO BLVD., BRGY. DEL CARMEN, TALISAY, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱47.7M | 100% | High risk75 | —-0.034 |
| 14 | 22FC0066CONSTRUCTION OF ROAD, BARANGAY MALATAP, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱38.9M | 100% | High risk75 | —-0.032 |
| 15 | 22FC0093CONSTRUCTION OF ROAD, BARANGAY CALABASA - BARANGAY BAAY, LABO, CAMARINES NORTE, BRGY. CALABASA, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱47.5M | 100% | High risk74 | —-0.026 |
| 16 | 22FC0081CONSTRUCTION OF ROAD, BARANGAY SAN FELIPE BASUD - SITIO PATAG, BARANGAY SAN ISIDRO, SAN LORENZO RUIZ, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱28.8M | 100% | High risk74 | —-0.029 |
| 17 | 22FC0115CONSTRUCTION OF DIVERSION / BY-PASS ROAD OF CORY AQUINO BOULEVARD, BARANGAY DEL CARMEN, TALISAY - CALANGCAWAN SUR, VINZONS, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱19.1M | 100% | High risk74 | —-0.035 |
| 18 | 22FC0186CONSTRUCTION OF ROAD, SITIO NABOONGAN, BRGY. DAGUIT TO LABO - SITIO IGANG, BRGY. BATOBALANI, PARACALE, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱19M | 87% | High risk74 | Flagged0.010 |
| 19 | 24EE0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, PALAWAN STATE UNIVERSITY CUYO CAMPUS, CUYO, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱11.9M | 65% | High risk73 | Flagged0.017 |
| 20 | 22FC0060CONSTRUCTION OF ROAD, BARANGAYS TAMISAN, STA. CRUZ AND SAN JOSE, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱23.8M | 100% | High risk73 | —-0.034 |
| 21 | 23FC0044CONSTRUCTION OF PARANG - SOUTH POBLACION BY PASS ROAD, SOUTH POBLACION SECTION, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱48.2M | 100% | High risk73 | —-0.032 |
| 22 | 22FC0067CONSTRUCTION OF ROAD, BARANGAY CABUSAY, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱19M | 100% | High risk73 | —-0.034 |
| 23 | 22FC0126CONSTRUCTION OF PARANG - SOUTH POBLACION BY-PASS SOUTH POBLACION SECTION, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱49M | 100% | High risk72 | —-0.033 |
| 24 | 22FC0188CONSTRUCTION OF ROAD, BARANGAY PAG-ASA, JOSE PANGANIBAN, CAMARINES NORTE | Region V | Camarines Norte DEO | Completed | ₱19.2M | 100% | High risk71 | —-0.033 |
| 25 | 24F00155ORGANIZATIONAL OUTCOME 2 (OO2): PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ALAWIHAO, DAET, CAMAR | Region V | Region V | Completed | ₱140.4M | 100% | High risk71 | —-0.064 |