Contractor dossier
297 projects on file, including joint ventures this contractor is part of.
Total projects
297
Total budget
₱38.4B
Average progress
90.0%
Completion rate
65.7%
Below 70%
Average risk score
66.2
High risk on average, out of 100
Flagged as unusual
71
23.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 296 | ₱38.3B | 66.2 | 71 | 90.0% |
| Region IX | 1 | ₱140M | 74.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 151 | ₱18.9B | 58.5 | 8 | 93.2% |
| Flood Control and Drainage | 61 | ₱6.7B | 60.0 | 4 | 92.8% |
| OTHER | 49 | ₱8.3B | 83.2 | 33 | 84.9% |
| GAA 2025 OO-1 | 14 | ₱2B | 95.1 | 10 | 82.4% |
| GAA 2025 SSP | 10 | ₱1.3B | 96.2 | 10 | 78.9% |
| GAA 2025 OO-2 | 6 | ₱1.1B | 93.5 | 6 | 50.1% |
| Bridges | 3 | ₱62.8M | 48.0 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱7.4M | 34.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 25IF0011CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 11+700 - STA. 11+810, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 89% | High risk96 | Flagged0.025 |
| 25IF0017CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG JARO - RUBAS - ORMOC RAOD (ORMOC CITY SIDE), STA. 9+180 - STA. 9+230, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 93% | High risk96 | Flagged0.024 |
| 25IF0015CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+480 - STA. 10+580, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IF0018CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+700 - STA. 10+790, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 91% | High risk96 | Flagged0.024 |
| 25IF0007CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+580 - STA. 10+700, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IL0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25IL0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25I00024ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0691+000 - K0691+150 | Region VIII | Region VIII | On-Going | ₱192.9M | 76% | High risk96 | Flagged0.023 |
| 25I00127ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROADS - BILIRAN CIRCUMFERENTIAL RD. - K1036+657 - K1036+778, K1036+885 - K1036+951 | Region VIII | Region VIII | On-Going | ₱144.6M | 75% | High risk96 | Flagged0.014 |
| 25I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱163.9M | 61% | High risk95 | Flagged0.034 |
| 25I00128ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD. - K1071+895 - K1072+180 | Region VIII | Region VIII | On-Going | ₱144.6M | 78% | High risk95 | Flagged0.015 |
| 25I00033ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0864+261 - K0864+552 | Region VIII | Region VIII | On-Going | ₱193M | 71% | High risk95 | Flagged0.027 |
| 25I00034ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN POLICARPO - ARTECHE - LAPINIG RD - K0863+750 - K0864+000 | Region VIII | Region VIII | On-Going | ₱192.9M | 88% | High risk95 | Flagged0.024 |
| 25I00038ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0881+985 - K0882+170 (LS) | Region VIII | Region VIII | On-Going | ₱144.6M | 65% | High risk95 | Flagged0.021 |
| 25I00030NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BY-PASS ROAD EXTENSION, PACKAGE P, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱337.6M | 80% | High risk95 | Flagged0.031 |
| 25I00147SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF DRAINAGE AND FLOOD CONTROL STRUCTURE ALONG GUINARONA RIVER, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱62.7M | 72% | High risk95 | Flagged0.016 |
| 25IA0118REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+660 - K1039+710 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 85% | High risk95 | —-0.005 |
| 25IA0119REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+710 - K1039+750 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 90% | High risk95 | —-0.007 |
| 25IA0120REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+750 - K1039+780 | Region VIII | Biliran DEO | On-Going | ₱49M | 100% | High risk95 | —-0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | Region VIII | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 24I00399CLUSTER 14: 1.) ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD - K0811+951 - K0812+085; 2.) ASSET PRESERVATION - REHABILITATION/ RECONS | Region VIII | Region VIII | On-Going | ₱192.9M | 35% | High risk92 | Flagged0.085 |
| 23I00216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, PHASE 1-B, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱134.8M | 92% | High risk92 | Flagged0.072 |
| 24IF0126CONSTRUCTION OF BURAUEN - ALBUERA ROAD, STA. 9+795 - STA. 9+850, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 100% | High risk92 | Flagged0.055 |
| 24IF0127CONSTRUCTION OF BURAUEN - ALBUERA ROAD, STA. 9+850 - STA. 9+920, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 100% | High risk92 | Flagged0.055 |
| 24I00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱236.1M | 31% | High risk84 | Flagged0.049 |
| 23I00215CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱91.4M | 40% | High risk65 | Flagged0.046 |
| 24I00416BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF BENJAMIN ROMUALDEZ INTERNATIONAL CONVENTION CENTER WITH SITE DEVELOPMENT PHASE II, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱247.5M | 17% | High risk84 | Flagged0.044 |
| 24I00100NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, (PACKAGE J), TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱356.2M | 71% | High risk84 | Flagged0.044 |
| 24I00197CLUSTER 9: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - ALPINIG ROAD - K0809+676 - K0809+780; 2. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - PANGPANG - PALAPAG - | Region VIII | Region VIII | On-Going | ₱385.9M | 86% | High risk83 | Flagged0.037 |
| 24I00027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARUSAN RIVER, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱147.5M | 37% | High risk84 | Flagged0.037 |
| 24I00156CLUSTER 6: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+595 - K1101+625 AND OTHER SIX (6) LOCATIONS, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱331.6M | 87% | High risk85 | Flagged0.036 |
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 24I00003SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE A-1, BARANGAY CAMPETIC, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 98% | High risk84 | Flagged0.035 |
| 25I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱163.9M | 61% | High risk95 | Flagged0.034 |
| 24I00158CLUSTER 7: NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+830 - K1101+860; AND SIX (6) OTHER LOCATIONS | Region VIII | Region VIII | On-Going | ₱331.6M | 93% | High risk85 | Flagged0.034 |
| 24I00207CLUSTER 4: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+800 - K0887+890 (RS); 2. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+890 | Region VIII | Region VIII | On-Going | ₱293.8M | 94% | High risk85 | Flagged0.032 |
| 23IM0131CONSTRUCTION OF CROSSING SAN ROQUE - SITIO KULAPNITAN FMR, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱74.6M | 21% | High risk60 | Flagged0.032 |
| 24I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION ALONG THE SHORELINES OF BRGY. NALIBUNAN, BARANGAY LOYONSAWANG, AND BARANGAY BUNTAY, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱192.9M | 79% | High risk84 | Flagged0.032 |
| 25I00030NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BY-PASS ROAD EXTENSION, PACKAGE P, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱337.6M | 80% | High risk95 | Flagged0.031 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23I00053ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD., K0924+274 - K0924+423, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱224.8M | 100% | High risk65 | —-0.063 |
| 127 | 23I00005CLUSTER 2: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NAVAL - CAIBIRAN CROSS COUNRTY RD., K1040+130 - K1040+160, BILIRAN LD; 2. ASSET PRESERVATION - REHABILITATION/RECONSTRUC | Region VIII | Region VIII | Completed | ₱192.8M | 100% | High risk65 | —-0.066 |
| 128 | 23I00004CLUSTER 1: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1038+880 - K1039+020, BILIRAN LD; 2. 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION | Region VIII | Region VIII | Completed | ₱197.6M | 100% | High risk65 | —-0.066 |
| 129 | 21I00075CLUSTER 3: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD - K1038+780 - K1038+880, BILIRAN LD; 2. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION O | Region VIII | Region VIII | Completed | ₱187.5M | 100% | High risk65 | —-0.068 |
| 130 | 19I00123CLUSTER I: 1. REHAB./MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE ALONG PALO-CARIGARA-ORMOC ROAD, K0972+300, BRGY. LEMON, CAPOOCAN, LEYTE; 2. REHAB./MAJOR REPAIR OF ROAD SLOPE PROTECTION STRUCTURE ALONG BURAUEN-MAHAGNAO ROAD, K0989+100................. | Region VIII | Region VIII | Completed | ₱135.9M | 100% | High risk65 | Flagged0.010 |
| 131 | 23I00119CLUSTER 19: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD. - K0922+805 - K0923+011, LEYTE 1ST LD; & 2. ASSET PRESERVATION | Region VIII | Region VIII | Completed | ₱236.4M | 100% | High risk65 | —-0.061 |
| 132 | 23I00063CLUSTER 18: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD., - (S00066LT) K0928+442 - K0928+500, K0928+571 - K0928+673; 2. | Region VIII | Region VIII | Completed | ₱245.1M | 100% | High risk65 | —-0.061 |
| 133 | 24IC0080CONSTRUCTION OF TIBAK FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, TIBAK RIVER, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱125.4M | 87% | High risk65 | —-0.017 |
| 134 | 23I00055ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD., K0928+314 - K0928+341, K0928+368 - K0928+442, LEYTE 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.066 |
| 135 | 23I00066ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD. - (S00066LT) K0927+173 - K0927+193, K0927+228 - K0927+283, K0928+236 - K0928+3 | Region VIII | Region VIII | Completed | ₱154.4M | 100% | High risk65 | —-0.075 |
| 136 | 21I00041CLUSTER 2: 1.PREVENTIVE MAINTENANCE-SECONDARY ROADS-ALLEN-CATARMAN RD-K0703+086-K0704+000-K0704+000-K0705+477, K0705+489-K0706+000, K0707+000-K0708+000 (S00005SM), NORTHERN SAMAR; 2. PREVENTIVE MAINTENANCE-SECONDARY ROADS-ALLEN-CATARMAN RD-K717+478-K0717+ | Region VIII | Region VIII | Completed | ₱288.5M | 100% | High risk65 | —-0.055 |
| 137 | 21I00038CLUSTER 1: 1. PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR)-K0687+000 - K0688+739, K0688+998-K0690+700 (S0000SM), NORTHERN SAMAR; 2.PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR)-K | Region VIII | Region VIII | Completed | ₱192.4M | 100% | High risk65 | —-0.065 |
| 138 | 20I00071CLUSTER 1: 1. CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) (S00001SM) K0687+700 - K0687+727, PHASE 1, SAN ISIDRO, NORTHERN SAMAR, AND FOUR (4) OTHER PROJECTS | Region VIII | Region VIII | Completed | ₱269.1M | 100% | High risk64 | —-0.056 |
| 139 | 20I00072CLUSTER 2: 1 CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) (S00001SM) K0687+620 - K0687+647, PHASE 1, SAN ISIDRO, NORTHERN SAMAR; AND TWO (2) OTHER PROJECTS | Region VIII | Region VIII | Completed | ₱170.5M | 100% | High risk64 | —-0.070 |
| 140 | 20I00080CLUSTER 3: 1. CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) (S00001SM) K0684+840 - K0684+910, PHASE 1 SAN ISIDRO, NORTHERN SAMAR; AND TWO (2) OTHER LOCATIONS IN NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱201.8M | 100% | High risk64 | —-0.064 |
| 141 | 20I00037(CLUSTER): 1. ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) - K0685+000-K0686+000, K0689+050-K0689+654, (S00002SM), VICTORIA, NORTHERN SAMAR; AND SEVEN (7) OTHER LOCATIONS | Region VIII | Region VIII | Completed | ₱266.2M | 100% | High risk64 | —-0.055 |
| 142 | 21I00023ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSED AND LANDSLIDE - SECONDARY ROADS - CATARMAN - CALBAYOG RD -K0746+140 - K0746+605, K0772+886 - K0773+000, K0773+000 - K0773+060, (S00004SM), K0782+(-040) - K0782+000, | Region VIII | Region VIII | Completed | ₱179.4M | 100% | High risk64 | —-0.066 |
| 143 | 23IC0119FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONST. OF BANGON FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, BRGY. SAN JOSE, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱115.8M | 100% | High risk64 | —-0.065 |
| 144 | 19I00037NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LT), KO963+182-KO965+586, KO965+628-KO966+100, KO969+000-KO969+096, KO969+112-KO970+000, KO971+406-KO971+796, (S00166LT), LEYTE 5TH LD | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.074 |
| 145 | 21I00054CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, PHASE IV-A, TACLOBAN CITY - TACLOBAN BY-PASS ROAD, LEYTE | Region VIII | Region VIII | Completed | ₱95.3M | 100% | High risk64 | —-0.069 |
| 146 | 20I00081CLUSTER 1: 1. CONSTRUCTION OF ROCK GUARD SLOPE PROTECTION ALONG BURAUEN - MAHAGNAO ROAD, K0988+780 - K0989+020, BURAUEN, LEYTE; AND TWO (2) OTHER LOCATIONS IN BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱283.4M | 100% | High risk64 | —-0.051 |
| 147 | 17I00002IMPROVEMENT/WIDENING OF NATIONAL ROADS, ALLEN - CATARMAN ROAD (S00005SM), KO734+000 - KO739+290, NORTHERN SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.036 |
| 148 | 23I00069CLUSTER 11: 1. ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - PALOMPON - ISABEL - MERIDA - ORMOC RD - K1111+811 - K1111880, K1069+697 - K1069+760, LEYTE 4TH LD; 2. ASSET PRESERVATIT | Region VIII | Region VIII | Completed | ₱204.6M | 100% | High risk64 | —-0.064 |
| 149 | 21I00063ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+560 - K0989+685, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |
| 150 | 21I00064ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+685 - K0989+810, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |