Contractor dossier
297 projects on file, including joint ventures this contractor is part of.
Total projects
297
Total budget
₱38.4B
Average progress
90.0%
Completion rate
65.7%
Below 70%
Average risk score
66.2
High risk on average, out of 100
Flagged as unusual
71
23.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 296 | ₱38.3B | 66.2 | 71 | 90.0% |
| Region IX | 1 | ₱140M | 74.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 151 | ₱18.9B | 58.5 | 8 | 93.2% |
| Flood Control and Drainage | 61 | ₱6.7B | 60.0 | 4 | 92.8% |
| OTHER | 49 | ₱8.3B | 83.2 | 33 | 84.9% |
| GAA 2025 OO-1 | 14 | ₱2B | 95.1 | 10 | 82.4% |
| GAA 2025 SSP | 10 | ₱1.3B | 96.2 | 10 | 78.9% |
| GAA 2025 OO-2 | 6 | ₱1.1B | 93.5 | 6 | 50.1% |
| Bridges | 3 | ₱62.8M | 48.0 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱7.4M | 34.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 25IF0011CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 11+700 - STA. 11+810, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 89% | High risk96 | Flagged0.025 |
| 25IF0017CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG JARO - RUBAS - ORMOC RAOD (ORMOC CITY SIDE), STA. 9+180 - STA. 9+230, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 93% | High risk96 | Flagged0.024 |
| 25IF0015CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+480 - STA. 10+580, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IF0018CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+700 - STA. 10+790, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 91% | High risk96 | Flagged0.024 |
| 25IF0007CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+580 - STA. 10+700, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IL0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25IL0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25I00024ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0691+000 - K0691+150 | Region VIII | Region VIII | On-Going | ₱192.9M | 76% | High risk96 | Flagged0.023 |
| 25I00127ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL ROADS - BILIRAN CIRCUMFERENTIAL RD. - K1036+657 - K1036+778, K1036+885 - K1036+951 | Region VIII | Region VIII | On-Going | ₱144.6M | 75% | High risk96 | Flagged0.014 |
| 25I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱163.9M | 61% | High risk95 | Flagged0.034 |
| 25I00128ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD. - K1071+895 - K1072+180 | Region VIII | Region VIII | On-Going | ₱144.6M | 78% | High risk95 | Flagged0.015 |
| 25I00033ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY (SN ISIDRO - SN JUANICO BR) - K0864+261 - K0864+552 | Region VIII | Region VIII | On-Going | ₱193M | 71% | High risk95 | Flagged0.027 |
| 25I00034ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - SN POLICARPO - ARTECHE - LAPINIG RD - K0863+750 - K0864+000 | Region VIII | Region VIII | On-Going | ₱192.9M | 88% | High risk95 | Flagged0.024 |
| 25I00038ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0881+985 - K0882+170 (LS) | Region VIII | Region VIII | On-Going | ₱144.6M | 65% | High risk95 | Flagged0.021 |
| 25I00030NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BY-PASS ROAD EXTENSION, PACKAGE P, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱337.6M | 80% | High risk95 | Flagged0.031 |
| 25I00147SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF DRAINAGE AND FLOOD CONTROL STRUCTURE ALONG GUINARONA RIVER, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱62.7M | 72% | High risk95 | Flagged0.016 |
| 25IA0118REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+660 - K1039+710 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 85% | High risk95 | —-0.005 |
| 25IA0119REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+710 - K1039+750 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 90% | High risk95 | —-0.007 |
| 25IA0120REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - NAVAL-CAIBIRAN CROSS COUNTRY RD., K1039+750 - K1039+780 | Region VIII | Biliran DEO | On-Going | ₱49M | 100% | High risk95 | —-0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | Region VIII | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 24I00399CLUSTER 14: 1.) ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD - K0811+951 - K0812+085; 2.) ASSET PRESERVATION - REHABILITATION/ RECONS | Region VIII | Region VIII | On-Going | ₱192.9M | 35% | High risk92 | Flagged0.085 |
| 23I00216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, PHASE 1-B, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱134.8M | 92% | High risk92 | Flagged0.072 |
| 24IF0126CONSTRUCTION OF BURAUEN - ALBUERA ROAD, STA. 9+795 - STA. 9+850, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 100% | High risk92 | Flagged0.055 |
| 24IF0127CONSTRUCTION OF BURAUEN - ALBUERA ROAD, STA. 9+850 - STA. 9+920, ALBUERA, LEYTE | Region VIII | Leyte 4th DEO | On-Going | ₱96.4M | 100% | High risk92 | Flagged0.055 |
| 24I00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱236.1M | 31% | High risk84 | Flagged0.049 |
| 23I00215CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱91.4M | 40% | High risk65 | Flagged0.046 |
| 24I00416BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF BENJAMIN ROMUALDEZ INTERNATIONAL CONVENTION CENTER WITH SITE DEVELOPMENT PHASE II, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱247.5M | 17% | High risk84 | Flagged0.044 |
| 24I00100NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, (PACKAGE J), TACLOBAN CITY LD | Region VIII | Region VIII | On-Going | ₱356.2M | 71% | High risk84 | Flagged0.044 |
| 24I00197CLUSTER 9: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - PANGPANG - PALAPAG - MAPANAS - GAMAY - ALPINIG ROAD - K0809+676 - K0809+780; 2. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - PANGPANG - PALAPAG - | Region VIII | Region VIII | On-Going | ₱385.9M | 86% | High risk83 | Flagged0.037 |
| 24I00027CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARUSAN RIVER, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱147.5M | 37% | High risk84 | Flagged0.037 |
| 24I00156CLUSTER 6: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+595 - K1101+625 AND OTHER SIX (6) LOCATIONS, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱331.6M | 87% | High risk85 | Flagged0.036 |
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Region VIII | Southern Leyte 1st DEO | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 24I00003SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE A-1, BARANGAY CAMPETIC, PALO, LEYTE | Region VIII | Region VIII | On-Going | ₱289.3M | 98% | High risk84 | Flagged0.035 |
| 25I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | Region VIII | On-Going | ₱163.9M | 61% | High risk95 | Flagged0.034 |
| 24I00158CLUSTER 7: NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+830 - K1101+860; AND SIX (6) OTHER LOCATIONS | Region VIII | Region VIII | On-Going | ₱331.6M | 93% | High risk85 | Flagged0.034 |
| 24I00207CLUSTER 4: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+800 - K0887+890 (RS); 2. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+890 | Region VIII | Region VIII | On-Going | ₱293.8M | 94% | High risk85 | Flagged0.032 |
| 23IM0131CONSTRUCTION OF CROSSING SAN ROQUE - SITIO KULAPNITAN FMR, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱74.6M | 21% | High risk60 | Flagged0.032 |
| 24I00139SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION ALONG THE SHORELINES OF BRGY. NALIBUNAN, BARANGAY LOYONSAWANG, AND BARANGAY BUNTAY, ABUYOG, LEYTE | Region VIII | Region VIII | On-Going | ₱192.9M | 79% | High risk84 | Flagged0.032 |
| 25I00030NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BY-PASS ROAD EXTENSION, PACKAGE P, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱337.6M | 80% | High risk95 | Flagged0.031 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23I00015CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.10, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱113.1M | 100% | High risk63 | —-0.064 |
| 152 | 18I00017CONSTRUCTION/EXTENSION OF CATARMAN FLOOD CONTROL STRUCTURES, INCLUDING RROW, CATARMAN RIVER BASIN (UPSTREAM), BRGY. MACAGTAS - BRGY. IPIL-IPIL SECTION, CATARMAN, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱106.1M | 100% | High risk63 | —-0.066 |
| 153 | 20I00075CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, STA. ELENA SECTION, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱95.4M | 100% | High risk63 | —-0.067 |
| 154 | 21I00059NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, PACKAGE B-1, LEYTE | Region VIII | Region VIII | Completed | ₱136.4M | 100% | High risk63 | —-0.077 |
| 155 | 23I00033NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CONSTRUCTION OF ROUNDABOUT ALONG CRITICAL INTERSECTION, DAANG MAHARLIKA (LT) (S00002LT); DAANG MAHARLIKA (SAN JUANICO BRIDGE) (S00013LT) K0898+(-178) - LEYTE-SAMAR ROAD (VIA GUINTIGUIAN) | Region VIII | Region VIII | Completed | ₱134.5M | 100% | High risk63 | —-0.071 |
| 156 | 21I00058NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, PACKAGE A-2, LEYTE | Region VIII | Region VIII | Completed | ₱136.5M | 100% | High risk63 | —-0.077 |
| 157 | 21I00048CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER, CADAC-AN RIVER BASIN, RIGHT SIDE BANK, ABUYOG, LEYTE | Region VIII | Region VIII | Completed | ₱95M | 100% | High risk63 | —-0.067 |
| 158 | 22I00025CONSTRUCTION OF CATARMAN FLOOD CONTROL STRUCTURE (CATARMAN RIVER BASIN), PACKAGE A, BRGY. BANGKEROHAN, CATARMAN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱104.2M | 100% | High risk63 | —-0.069 |
| 159 | 20I00021CONSTRUCTION OF CATARMAN FLOOD CONTROL STRUCTURES (CATARMAN RIVER BASIN), CATARMAN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱98.4M | 100% | High risk63 | —-0.070 |
| 160 | 24IC0064CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BARANGAY CAMIRE, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.069 |
| 161 | 22IG0037CONSTRUCTION OF CADAC-AN FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER, CADAC-AN RIVER BASIN,RIGHT SIDE BANK, ABUYOG, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱95.5M | 100% | High risk63 | —-0.067 |
| 162 | 23IC0113CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL ALONG BINAHAAN RIVER, BRGY. MALAGUICAY, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱106.1M | 100% | High risk63 | —-0.065 |
| 163 | 23IC0114CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱106.1M | 100% | High risk63 | —-0.065 |
| 164 | 22I00057CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINAHAAN RIVER BASIN, RIGHT SIDE BANK, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | Region VIII | Completed | ₱97.5M | 100% | High risk62 | —-0.068 |
| 165 | 25I00174NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BY-PASS ROAD EXTENSION, PACKAGE P-2 | Region VIII | Region VIII | On-Going | ₱289.3M | 30% | High risk62 | Flagged0.024 |
| 166 | 22I00074CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. PINANGUMHAN, BILIRAN, BILIRAN | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk62 | —-0.072 |
| 167 | 22I00024CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTUCTION/EXTENSION OF CATARMAN FLOOD CONTROL STRUCTURES, CATARMAN RIVER BASIN, BRGY. MACAGTAS - BRGY. IPIL-IPIL SECTION, CATARMAN, NORTHERN SAMAR | Region VIII | Region VIII | Completed | ₱96.5M | 100% | High risk62 | —-0.068 |
| 168 | 24I00160SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHANGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS AND SIGNAGES ALONG TIGBAO - STA. FE - SAN MIGUEL ROAD, PHASE 1, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 100% | High risk61 | —-0.047 |
| 169 | 19I00099TACLOBAN CITY BYPASS ROAD (CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE), PHASE I, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱123.8M | 100% | High risk61 | —-0.080 |
| 170 | 24I00172SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG LEYTE - SAMAR ROAD (VIA GUINTIGUI-AN) BRGY. SUHI AND CABALAWAN, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk61 | —-0.085 |
| 171 | 24I00262SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239-INSTALLATION OF SOLAR LED STREET LIGHTS, AND SIGNAGES ALONG TACLOBAN CITY BYPASS ROAD EXTENSION, PHASE 1, BARANGAY TIGBAO, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 32% | High risk61 | —-0.027 |
| 172 | 23I00078INSTALLATION OF SOLAR LED STREET LIGHTS ALONG TACLOBAN CITY BYPASS ROAD, CAIBAAN TO NULA-TULA, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱94.5M | 100% | High risk61 | —-0.085 |
| 173 | 24I00161SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHANGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS AND SIGNAGES ALONG TIGBAO - STA. FE - SAN MIGUEL ROAD, PHASE 2, TACLOBAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 30% | High risk61 | —-0.025 |
| 174 | 23I00067INSTALLATION OF SOLAR STREETLIGHTS ALONG TACLOBAN CITY BYPASS ROAD, TACLOBAN CITY, LEYTE | Region VIII | Region VIII | Completed | ₱96.4M | 100% | High risk61 | —-0.085 |
| 175 | 17I00035ASSET PRESERVATION OF NAT'L. ROADS - REHAB./ RECONST./UPGRADING OF PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4) - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR.),..., N. SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱156.1M | 100% | High risk61 | —-0.038 |