Contractor dossier
200 projects on file, including joint ventures this contractor is part of.
Total projects
200
Total budget
₱14.4B
Average progress
89.6%
Completion rate
75.0%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
23
11.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 194 | ₱14.1B | 56.2 | 21 | 90.5% |
| Negros Island Region | 6 | ₱281.9M | 61.3 | 2 | 59.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 78 | ₱5.2B | 52.8 | 1 | 94.7% |
| Flood Control and Drainage | 69 | ₱5B | 55.4 | 7 | 89.3% |
| Bridges | 18 | ₱1.1B | 54.0 | 1 | 93.7% |
| Buildings and Facilities | 15 | ₱1.3B | 57.6 | 5 | 73.7% |
| OTHER | 9 | ₱901.3M | 77.6 | 4 | 89.2% |
| Bridges, Roads | 6 | ₱577.5M | 60.4 | 1 | 79.4% |
| GAA 2025 SSP | 2 | ₱169.5M | 95.7 | 2 | 39.6% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.8 | 1 | 53.4% |
| GAA 2025 OO-1 | 1 | ₱36.5M | 93.0 | 1 | 61.1% |
| Water Provision and Storage | 1 | ₱18.4M | 45.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0010PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0078+165-K0079+373,K0080+800 - K0081+692 | Region VI | Capiz 2nd DEO | On-Going | ₱121.3M | 69% | High risk96 | Flagged0.037 |
| 25G00068CONSTRUCTION OF MULTI- PURPOSE BUILDING (EVACUATION FACILITIES), BARANGAY INDAYAGAN, MAAYON CAPIZ | Region VI | Region VI | On-Going | ₱48.2M | 10% | High risk95 | Flagged0.040 |
| 25G00084CONSTRUCTION OF REVETMENT WALL ALONG TANGALAN RIVER, PHASE 1, BARANGAY BAYBAY, TANGALAN, AKLAN | Region VI | Region VI | On-Going | ₱96.4M | 53% | High risk94 | Flagged0.005 |
| 25G00053MAAYON- SARA BYPASS ROAD, CAPIZ | Region VI | Region VI | On-Going | ₱36.5M | 61% | High risk93 | Flagged0.008 |
| 24GJ0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 10 | Region VI | Iloilo City DEO | On-Going | ₱144.3M | 81% | High risk85 | Flagged0.024 |
| 24G00055CONSTRUCTION OF PARALLEL BRIDGE - JALAUR BR. (B00203PN) ALONG BANGA BANTE-BANGA-POLOT-AN BAROTAC NUEVO RD | Region VI | Region VI | On-Going | ₱206.5M | 64% | High risk85 | Flagged0.036 |
| 23G00029CONSTRUCTION OF SLOPE PROTECTION AND IMPROVEMENT ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱96.5M | 66% | High risk84 | Flagged0.032 |
| 25GJ0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND PROMENADE ALONG BATIANO RIVER, ILOILO CITY, SECTION 1 | Region VI | Iloilo City DEO | On-Going | ₱144.7M | 0% | High risk81 | Flagged0.027 |
| 24GJ0050(RE-AD) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 9 | Region VI | Iloilo City DEO | On-Going | ₱144.4M | 90% | High risk81 | Flagged0.012 |
| 24G00054CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱91.6M | 92% | High risk80 | Flagged0.014 |
| 24GJ0057REHABILITATION OF REVETMENT, JARO FLOODWAY (LEFT BANK), ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱96.2M | 75% | High risk80 | Flagged0.010 |
| 24G00060CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO RIVER ESPLANADE, ILOILO CITY | Region VI | Region VI | On-Going | ₱93.4M | 0% | High risk80 | Flagged0.027 |
| 18G00071CONSTRUCTION OF REVETMENT WALL ALONG BACONG RIVER, BARANGAY CAMANSIHAN, CULASI, ANTIQUE | Region VI | Region VI | Completed | ₱173M | 100% | High risk79 | —-0.015 |
| 25GH0143REHABILITATION OF MULTI-PURPOSE BUILDING, NORTHERN ILOILO STATE UNIVERSITY (NISU), SARA, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱148.4M | 29% | High risk79 | Flagged0.019 |
| 21GG0127CONSTRUCTION OF SEA WALL/STORM SURGE PROTECTION WITH EMBANKMENT/ ROAD CONCRETING, BANATE, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱49M | 100% | High risk78 | —-0.028 |
| 21GH0081CONSTRUCTION OF CONCRETE ROAD - BAROTAC VIEJO BYPASS ROAD, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱49M | 100% | High risk77 | —-0.025 |
| 18GL0064CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONGHINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.2M | 100% | High risk76 | —-0.024 |
| 24GO0126INSTALLATION OF PUMPING STATION AT LUPIT RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.051 |
| 21GH0058OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - ILOILO EAST COAST-CAPIZ RD K0177+290 - K0178+688, K0178+931 - K0182+180, BALASAN, ESTANCIA AND BATAD, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱86.4M | 100% | High risk75 | —-0.018 |
| 24GO0127INSTALLATION OF PUMPING STATION ALONG MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk74 | Flagged0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00100LGU HOSPITALS- ROXAS MEMORIAL PROVINCIAL HOSPITAL, CAPIZ | Region VI | Region VI | On-Going | ₱89.5M | 0% | High risk69 | Flagged0.061 |
| 24GO0126INSTALLATION OF PUMPING STATION AT LUPIT RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.051 |
| 24GO0127INSTALLATION OF PUMPING STATION ALONG MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk74 | Flagged0.051 |
| 25G00068CONSTRUCTION OF MULTI- PURPOSE BUILDING (EVACUATION FACILITIES), BARANGAY INDAYAGAN, MAAYON CAPIZ | Region VI | Region VI | On-Going | ₱48.2M | 10% | High risk95 | Flagged0.040 |
| 25GP0010PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0078+165-K0079+373,K0080+800 - K0081+692 | Region VI | Capiz 2nd DEO | On-Going | ₱121.3M | 69% | High risk96 | Flagged0.037 |
| 24G00055CONSTRUCTION OF PARALLEL BRIDGE - JALAUR BR. (B00203PN) ALONG BANGA BANTE-BANGA-POLOT-AN BAROTAC NUEVO RD | Region VI | Region VI | On-Going | ₱206.5M | 64% | High risk85 | Flagged0.036 |
| 23G00029CONSTRUCTION OF SLOPE PROTECTION AND IMPROVEMENT ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱96.5M | 66% | High risk84 | Flagged0.032 |
| 24G00060CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO RIVER ESPLANADE, ILOILO CITY | Region VI | Region VI | On-Going | ₱93.4M | 0% | High risk80 | Flagged0.027 |
| 25GJ0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND PROMENADE ALONG BATIANO RIVER, ILOILO CITY, SECTION 1 | Region VI | Iloilo City DEO | On-Going | ₱144.7M | 0% | High risk81 | Flagged0.027 |
| 24GJ0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 10 | Region VI | Iloilo City DEO | On-Going | ₱144.3M | 81% | High risk85 | Flagged0.024 |
| 25GH0143REHABILITATION OF MULTI-PURPOSE BUILDING, NORTHERN ILOILO STATE UNIVERSITY (NISU), SARA, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱148.4M | 29% | High risk79 | Flagged0.019 |
| 17G00101PROPOSED CONSTRUCTION OF THREE (3) STOREY DA REGIONAL OFFICE VI PLUS PENTHOUSE/ROOFDECK | Region VI | Region VI | Completed | ₱120M | 100% | High risk71 | Flagged0.016 |
| 24G00054CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱91.6M | 92% | High risk80 | Flagged0.014 |
| 22G00149CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. SAN PEDRO MOLO, ILOILO CITY, ILOILO | Region VI | Region VI | On-Going | ₱193M | 78% | High risk62 | Flagged0.012 |
| 25G00035REHABILITATION OF BORACAY CIRCUMFERENTIAL ROAD, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱96.3M | 1% | High risk66 | Flagged0.012 |
| 24GJ0050(RE-AD) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 9 | Region VI | Iloilo City DEO | On-Going | ₱144.4M | 90% | High risk81 | Flagged0.012 |
| 22GJ0065CONSTRUCTION OF OFFICE OF CIVIL DEFENSE- REGIONAL OFFICE VI (OCD-RO VI) AND EMERGENCY OPERATIONS CENTER, ILOILO | Region VI | Iloilo City DEO | On-Going | ₱48M | 0% | Medium risk53 | Flagged0.011 |
| 24GH0073CONSTRUCTION OF CONCRETE BRIDGE- BAROTAC VIEJO BYPASS ROAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱96.5M | 30% | High risk62 | Flagged0.011 |
| 24GJ0057REHABILITATION OF REVETMENT, JARO FLOODWAY (LEFT BANK), ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱96.2M | 75% | High risk80 | Flagged0.010 |
| 25G00053MAAYON- SARA BYPASS ROAD, CAPIZ | Region VI | Region VI | On-Going | ₱36.5M | 61% | High risk93 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19GJ0112RETROFITTING/STRENGTHENING OF BRIDGE - DUNGON BR. 2 (B00536PN) ALONG BENIGNO S. AQUINO, JR. AVE. ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱56.8M | 100% | Medium risk52 | —-0.048 |
| 102 | 24GB0009CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANGARANAN RIVER AT CANGARANAN BRIDGE (ABUTMENT B, DOW | Region VI | Antique DEO | On-Going | ₱82M | 89% | Medium risk52 | —-0.020 |
| 103 | 20GE0095CONSTRUCTION OF ROAD SLOPE PROTECTION FOR BRGY. CABALAGNAN, NUEVA VALENCIA, GUIMARAS K0080+150 - K0080+450 BOTH SIDES | Region VI | Guimaras DEO | Completed | ₱88.5M | 100% | Medium risk52 | —-0.076 |
| 104 | 21GH0035CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BARANGAY POBLACION ILAWOD , BAROTAC VIEJO, ILOILO, STA. 3+528.6 - STA 2+881.44, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.060 |
| 105 | 20GE0098CONSTRUCTION OF ROAD SLOPE PROTECTION FOR BRGY. CABALAGNAN, NUEVA VALENCIA, GUIMARAS (K0079+000 - K0079+080, K0079+280 - K0079+360 RIGHT SIDE) | Region VI | Guimaras DEO | Completed | ₱75.3M | 100% | Medium risk52 | —-0.079 |
| 106 | 20GE0091PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0057+942-K0082+487, SAN LORENZO/ SIBUNAG/ NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱69.1M | 100% | Medium risk52 | —-0.080 |
| 107 | 18GH0100CONSTRUCTION OF FLOOD CONTROL PROJECT, BAROTAC VIEJO RIVER CONTROL, BRGY. POBLACION, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱75.4M | 100% | Medium risk52 | —-0.062 |
| 108 | 19G00011CONSTRUCTION OF GRAVEL ROAD - ILOILO R-1 BYPASS ROAD, ILOILO | Region VI | Region VI | Completed | ₱84.7M | 100% | Medium risk52 | —-0.065 |
| 109 | 22GE0035ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0030+000 - K0031+000 | Region VI | Guimaras DEO | Completed | ₱76.6M | 100% | Medium risk52 | —-0.077 |
| 110 | 23GH0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BARRIDO, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱86.5M | 100% | Medium risk52 | —-0.058 |
| 111 | 24GI0079CONSTRUCTION OF AGANAN FLOOD CONTROL STRUCTURE (JARO-AGANAN RIVER), BARANGAY TALONGADIAN (SITE 3), STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱67.5M | 92% | Medium risk52 | —-0.025 |
| 112 | 21GI0002CONSTRUCTION OF SIBALOM FLOOD CONTROL PROJECT (SIBALOM RIVER), BARANGAY NAGBANGI, LEON, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱75.3M | 100% | Medium risk52 | —-0.065 |
| 113 | 20GG0028CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - LAMBUNAO - INCA ROAD, K0059 + 260 - K0059 + 405; K0060 + 039 - K0060 + 151 | Region VI | Iloilo 2nd DEO | Completed | ₱68M | 100% | Medium risk52 | —-0.079 |
| 114 | 23GH0048CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY POBLACION ILAWOD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱86.5M | 100% | Medium risk52 | —-0.058 |
| 115 | 23GH0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, CONSTRUTION OF FLOOD MITIGATION STRUCTURE, BARANGAY NATIVIDAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱86.5M | 100% | Medium risk52 | —-0.058 |
| 116 | 22GG0066CONSTRUCTION OF SEA WALL / STORM SURGE PROTECTION, BANATE, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱84.6M | 100% | Medium risk52 | —-0.061 |
| 117 | 21G00052CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱88.1M | 100% | Medium risk52 | —-0.060 |
| 118 | 23GG0158CONSTRUCTION OF GROUNDSILLS AND SLOPE PROTECTION OF BARANGAY BATU, JALAUR RIVER, PASSI CITY, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱74.1M | 100% | Medium risk52 | —-0.056 |
| 119 | 18GI0030REHABILITATION OF CONCRETE ROAD - JCT. BANCAL - LEON - ANTIQUE BDRY RD, K0022+000 - K0022+600, K0022+960 - K0023+214.5, K0023+229.5 - K23+769, K0024+780 - K0025+764, K0029+250 K0029+680.3, K0030+311 - K0031+411.5 | Region VI | Iloilo 4th DEO | Completed | ₱69.8M | 100% | Medium risk52 | —-0.077 |
| 120 | 19GG0017ROAD WIDENING OF PASSI-CALINOG ROAD, K0051+547 - K0054+460 | Region VI | Iloilo 2nd DEO | Completed | ₱62M | 100% | Medium risk52 | —-0.081 |
| 121 | 19GG0003ROAD WIDENING OF ILOILO EAST COAST - CAPIZ ROAD, K0274 + 965 - K0276 + 900, K0277 + 306 - K0278 + 260 | Region VI | Iloilo 2nd DEO | Completed | ₱61.8M | 100% | Medium risk52 | —-0.081 |
| 122 | 18GJ0127CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION WORKS AND IMPROVEMENT ALONG ILOILO RIVER, LEFT BANK (FROM MUELLE LONEY BRIDGE TO QUIRINO LOPEZ), ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱76.8M | 100% | Medium risk52 | —-0.046 |
| 123 | 20G00089CONSTRUCTION OF DRAINAGE STRUCTURE ALONG PRESIDENT CORAZON C. AQUINO AVENUE (L/S) ILOILO CITY | Region VI | Region VI | Completed | ₱59.4M | 100% | Medium risk52 | —-0.064 |
| 124 | 23GG0171PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) K0032 + 000 - K0034 + 051 | Region VI | Iloilo 2nd DEO | Completed | ₱55.6M | 100% | Medium risk51 | —-0.082 |
| 125 | 20GF0093IMPROVEMENT OF GUIMBAL SHORE PROTECTION, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱73.2M | 100% | Medium risk51 | —-0.063 |