Contractor dossier
200 projects on file, including joint ventures this contractor is part of.
Total projects
200
Total budget
₱14.4B
Average progress
89.6%
Completion rate
75.0%
Average risk score
56.3
Medium risk on average, out of 100
Flagged as unusual
23
11.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 194 | ₱14.1B | 56.2 | 21 | 90.5% |
| Negros Island Region | 6 | ₱281.9M | 61.3 | 2 | 59.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 78 | ₱5.2B | 52.8 | 1 | 94.7% |
| Flood Control and Drainage | 69 | ₱5B | 55.4 | 7 | 89.3% |
| Bridges | 18 | ₱1.1B | 54.0 | 1 | 93.7% |
| Buildings and Facilities | 15 | ₱1.3B | 57.6 | 5 | 73.7% |
| OTHER | 9 | ₱901.3M | 77.6 | 4 | 89.2% |
| Bridges, Roads | 6 | ₱577.5M | 60.4 | 1 | 79.4% |
| GAA 2025 SSP | 2 | ₱169.5M | 95.7 | 2 | 39.6% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 93.8 | 1 | 53.4% |
| GAA 2025 OO-1 | 1 | ₱36.5M | 93.0 | 1 | 61.1% |
| Water Provision and Storage | 1 | ₱18.4M | 45.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0010PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0078+165-K0079+373,K0080+800 - K0081+692 | Region VI | Capiz 2nd DEO | On-Going | ₱121.3M | 69% | High risk96 | Flagged0.037 |
| 25G00068CONSTRUCTION OF MULTI- PURPOSE BUILDING (EVACUATION FACILITIES), BARANGAY INDAYAGAN, MAAYON CAPIZ | Region VI | Region VI | On-Going | ₱48.2M | 10% | High risk95 | Flagged0.040 |
| 25G00084CONSTRUCTION OF REVETMENT WALL ALONG TANGALAN RIVER, PHASE 1, BARANGAY BAYBAY, TANGALAN, AKLAN | Region VI | Region VI | On-Going | ₱96.4M | 53% | High risk94 | Flagged0.005 |
| 25G00053MAAYON- SARA BYPASS ROAD, CAPIZ | Region VI | Region VI | On-Going | ₱36.5M | 61% | High risk93 | Flagged0.008 |
| 24GJ0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 10 | Region VI | Iloilo City DEO | On-Going | ₱144.3M | 81% | High risk85 | Flagged0.024 |
| 24G00055CONSTRUCTION OF PARALLEL BRIDGE - JALAUR BR. (B00203PN) ALONG BANGA BANTE-BANGA-POLOT-AN BAROTAC NUEVO RD | Region VI | Region VI | On-Going | ₱206.5M | 64% | High risk85 | Flagged0.036 |
| 23G00029CONSTRUCTION OF SLOPE PROTECTION AND IMPROVEMENT ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱96.5M | 66% | High risk84 | Flagged0.032 |
| 25GJ0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND PROMENADE ALONG BATIANO RIVER, ILOILO CITY, SECTION 1 | Region VI | Iloilo City DEO | On-Going | ₱144.7M | 0% | High risk81 | Flagged0.027 |
| 24GJ0050(RE-AD) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 9 | Region VI | Iloilo City DEO | On-Going | ₱144.4M | 90% | High risk81 | Flagged0.012 |
| 24G00054CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱91.6M | 92% | High risk80 | Flagged0.014 |
| 24GJ0057REHABILITATION OF REVETMENT, JARO FLOODWAY (LEFT BANK), ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱96.2M | 75% | High risk80 | Flagged0.010 |
| 24G00060CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO RIVER ESPLANADE, ILOILO CITY | Region VI | Region VI | On-Going | ₱93.4M | 0% | High risk80 | Flagged0.027 |
| 18G00071CONSTRUCTION OF REVETMENT WALL ALONG BACONG RIVER, BARANGAY CAMANSIHAN, CULASI, ANTIQUE | Region VI | Region VI | Completed | ₱173M | 100% | High risk79 | —-0.015 |
| 25GH0143REHABILITATION OF MULTI-PURPOSE BUILDING, NORTHERN ILOILO STATE UNIVERSITY (NISU), SARA, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱148.4M | 29% | High risk79 | Flagged0.019 |
| 21GG0127CONSTRUCTION OF SEA WALL/STORM SURGE PROTECTION WITH EMBANKMENT/ ROAD CONCRETING, BANATE, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱49M | 100% | High risk78 | —-0.028 |
| 21GH0081CONSTRUCTION OF CONCRETE ROAD - BAROTAC VIEJO BYPASS ROAD, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱49M | 100% | High risk77 | —-0.025 |
| 18GL0064CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (DOWNSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONGHINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.2M | 100% | High risk76 | —-0.024 |
| 24GO0126INSTALLATION OF PUMPING STATION AT LUPIT RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.051 |
| 21GH0058OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - ILOILO EAST COAST-CAPIZ RD K0177+290 - K0178+688, K0178+931 - K0182+180, BALASAN, ESTANCIA AND BATAD, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱86.4M | 100% | High risk75 | —-0.018 |
| 24GO0127INSTALLATION OF PUMPING STATION ALONG MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk74 | Flagged0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00100LGU HOSPITALS- ROXAS MEMORIAL PROVINCIAL HOSPITAL, CAPIZ | Region VI | Region VI | On-Going | ₱89.5M | 0% | High risk69 | Flagged0.061 |
| 24GO0126INSTALLATION OF PUMPING STATION AT LUPIT RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk75 | Flagged0.051 |
| 24GO0127INSTALLATION OF PUMPING STATION ALONG MANDALAGAN RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱48.2M | 0% | High risk74 | Flagged0.051 |
| 25G00068CONSTRUCTION OF MULTI- PURPOSE BUILDING (EVACUATION FACILITIES), BARANGAY INDAYAGAN, MAAYON CAPIZ | Region VI | Region VI | On-Going | ₱48.2M | 10% | High risk95 | Flagged0.040 |
| 25GP0010PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0078+165-K0079+373,K0080+800 - K0081+692 | Region VI | Capiz 2nd DEO | On-Going | ₱121.3M | 69% | High risk96 | Flagged0.037 |
| 24G00055CONSTRUCTION OF PARALLEL BRIDGE - JALAUR BR. (B00203PN) ALONG BANGA BANTE-BANGA-POLOT-AN BAROTAC NUEVO RD | Region VI | Region VI | On-Going | ₱206.5M | 64% | High risk85 | Flagged0.036 |
| 23G00029CONSTRUCTION OF SLOPE PROTECTION AND IMPROVEMENT ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱96.5M | 66% | High risk84 | Flagged0.032 |
| 24G00060CONSTRUCTION OF SLOPE PROTECTION ALONG ILOILO RIVER ESPLANADE, ILOILO CITY | Region VI | Region VI | On-Going | ₱93.4M | 0% | High risk80 | Flagged0.027 |
| 25GJ0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND PROMENADE ALONG BATIANO RIVER, ILOILO CITY, SECTION 1 | Region VI | Iloilo City DEO | On-Going | ₱144.7M | 0% | High risk81 | Flagged0.027 |
| 24GJ0049CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 10 | Region VI | Iloilo City DEO | On-Going | ₱144.3M | 81% | High risk85 | Flagged0.024 |
| 25GH0143REHABILITATION OF MULTI-PURPOSE BUILDING, NORTHERN ILOILO STATE UNIVERSITY (NISU), SARA, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱148.4M | 29% | High risk79 | Flagged0.019 |
| 17G00101PROPOSED CONSTRUCTION OF THREE (3) STOREY DA REGIONAL OFFICE VI PLUS PENTHOUSE/ROOFDECK | Region VI | Region VI | Completed | ₱120M | 100% | High risk71 | Flagged0.016 |
| 24G00054CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG ILOILO RIVER, LEFT BANK (FROM QUIRINO- LOPEZ BRIDGE TO MUELLEY LONEY BRIDGE (DRILON BRIDGE)), (ESPLANADE 11), ILOILO CITY | Region VI | Region VI | On-Going | ₱91.6M | 92% | High risk80 | Flagged0.014 |
| 22G00149CONSTRUCTION OF MULTI-PURPOSE FACILITY, BRGY. SAN PEDRO MOLO, ILOILO CITY, ILOILO | Region VI | Region VI | On-Going | ₱193M | 78% | High risk62 | Flagged0.012 |
| 25G00035REHABILITATION OF BORACAY CIRCUMFERENTIAL ROAD, BORACAY ISLAND, MALAY, AKLAN | Region VI | Region VI | On-Going | ₱96.3M | 1% | High risk66 | Flagged0.012 |
| 24GJ0050(RE-AD) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN ILOILO CITY, SECTION 9 | Region VI | Iloilo City DEO | On-Going | ₱144.4M | 90% | High risk81 | Flagged0.012 |
| 22GJ0065CONSTRUCTION OF OFFICE OF CIVIL DEFENSE- REGIONAL OFFICE VI (OCD-RO VI) AND EMERGENCY OPERATIONS CENTER, ILOILO | Region VI | Iloilo City DEO | On-Going | ₱48M | 0% | Medium risk53 | Flagged0.011 |
| 24GH0073CONSTRUCTION OF CONCRETE BRIDGE- BAROTAC VIEJO BYPASS ROAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | On-Going | ₱96.5M | 30% | High risk62 | Flagged0.011 |
| 24GJ0057REHABILITATION OF REVETMENT, JARO FLOODWAY (LEFT BANK), ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱96.2M | 75% | High risk80 | Flagged0.010 |
| 25G00053MAAYON- SARA BYPASS ROAD, CAPIZ | Region VI | Region VI | On-Going | ₱36.5M | 61% | High risk93 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 18GF0017REHABILITATION OF PAVED ROAD - GUIMBAL-IGBARAS-TUBUNGAN-LEON ROAD, IGBARAS AND TUBUNGAN, ILOILO (K0044+392-K0044+492, K0044+725-K0045+201, K0047+335-K0047+842, K0051+286-K0051+366, K0059+588-K0059+786) | Region VI | Iloilo 1st DEO | Completed | ₱37.1M | 100% | Medium risk46 | —-0.085 |
| 177 | 19GF0007REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - GUIMBAL - IGBARAS - TUBUNGAN - LEON RD. (K0048+710 - K0048+760), IGBARAS, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱28.8M | 100% | Medium risk46 | —-0.084 |
| 178 | 24GG0119CONSTRUCTION OF ANILAO BY-PASS ROAD | Region VI | Iloilo 2nd DEO | Completed | ₱34.3M | 100% | Medium risk46 | —-0.084 |
| 179 | 22GF0032PREVENTIVE MAINTENANCE ALONG ILOILO-ANTIQUE RD. - K0027+549 - K0028+412, K0031+024 - K0031+751 | Region VI | Iloilo 1st DEO | Completed | ₱38.8M | 100% | Medium risk46 | —-0.086 |
| 180 | 18GK0135CONSTRUCTION OF WATER SUPPLY - LEVEL II, BRGYS. PINAPUGASAN, TAMLANG, BINAGUIOHAN, MAGSAYSAY, ESCALANTE CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱18.4M | 100% | Medium risk46 | —-0.051 |
| 181 | 24GG0244PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) - K0035 + 849 - K0036 + 063, K0047 + 000 - K0047 + 199, K0047 + 606 - K0048 + 006, K0048 + 283 - K0048 + 404 | Region VI | Iloilo 2nd DEO | Completed | ₱33.6M | 100% | Medium risk45 | —-0.086 |
| 182 | 18GE0097CONSTRUCTION OF TUMANDA 2 RIVER CONTROL SYSTEM, CABANO, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱32.7M | 100% | Medium risk45 | —-0.071 |
| 183 | 18GF0056CONSTRUCTION OF REVETMENT - CONSTRUCTION OF SIWARAGAN RIVER CONTROL, SIWARAGAN, SAN JOAQUIN, ILOILO (STA. 0+000-STA.0+480 (ABUT. A); STA. 0+500-STA. 0+700 (ABUT. B)) | Region VI | Iloilo 1st DEO | Completed | ₱29.3M | 100% | Medium risk45 | —-0.066 |
| 184 | 18GB0215CONSTRUCTION OF REVETMENT AT ASLUMAN RIVER, HAMTIC, ANTIQUE | Region VI | Antique DEO | Completed | ₱40.5M | 100% | Medium risk45 | —-0.067 |
| 185 | 24GI0012CONSTRUCTION OF DRAINAGE STRUCTURE ALONG - ILOILO-CAPIZ RD (NEW ROUTE) - K0020 + 000 - K0020 + 718, K0021 + 478 - K0021 + 626 | Region VI | Iloilo 4th DEO | On-Going | ₱28.4M | 89% | Medium risk45 | —-0.044 |
| 186 | 20GF0080REHABILITATION/MAJOR REPAIR OF GUIMBAL FLOOD CONTROL STRUCTURES LEADING TO GUIMBAL PORT, GUIMBAL, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱43.5M | 100% | Medium risk45 | —-0.064 |
| 187 | 18GE0099CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT CANHAWAN RIVER ALONG GUIMARAS CIRCUMFERENTIAL ROAD, BRGY. CANHAWAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.070 |
| 188 | 18GE0147CONSTRUCTION OF JORDAN WHARF SHORE PROTECTION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.071 |
| 189 | 21GE0099CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER CONTROL DIKE WITH ESPLANADE (PHASE II), BARANGAY POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱45.5M | 100% | Medium risk45 | —-0.071 |
| 190 | 25GP0004PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0074+569 - K0074+705 | Region VI | Capiz 2nd DEO | On-Going | ₱7.7M | 99% | Medium risk45 | —-0.059 |
| 191 | 18GB0032ROAD CONCRETING: ATABAY-BADIANG ROAD LEADING TO EVELIO B. JAVIER MEMORIAL AIRPORT | Region VI | Antique DEO | Completed | ₱20.5M | 100% | Medium risk45 | —-0.073 |
| 192 | 24GG0140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ RD (OLD ROUTE) - K0063 + 360 - K0063 + 911 | Region VI | Iloilo 2nd DEO | Completed | ₱20.2M | 100% | Medium risk45 | —-0.087 |
| 193 | 24GG0097PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BANGA BANTE - BANGA POLOT-AN - BAROTAC NUEVO RD - K0275 + (-235) - K0275 + 354 | Region VI | Iloilo 2nd DEO | Completed | ₱21.5M | 100% | Medium risk45 | —-0.085 |
| 194 | 24GI0047PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO-CAPIZ RD (NEW ROUTE) - K0012 + 993 - K0013 + 543 | Region VI | Iloilo 4th DEO | Completed | ₱19.5M | 100% | Medium risk45 | —-0.086 |
| 195 | 18GH0080CONSTRUCTION OF CONCRETE ROAD - LUCA BAY-ANG-PEDADA ROAD LEADING TO PEDADA MANGROVE ECO PARK, BRGY. PEDADA, AJUY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱18.8M | 100% | Medium risk45 | —-0.086 |
| 196 | 24GG0093PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) - K0057 + 859 - K0058 + 162 | Region VI | Iloilo 2nd DEO | Completed | ₱11.3M | 100% | Medium risk45 | —-0.088 |
| 197 | 23GI0067PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO EAST COAST-CAPIZ RD - K0284+ 100 - K0284 + 467, K0284 + 570 - K0284 + 611 | Region VI | Iloilo 4th DEO | Completed | ₱10.2M | 100% | Medium risk44 | —-0.084 |
| 198 | 22GJ0005PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG ARROYO ST (S00077PN) CHAINAGE 7 - CHAINAGE 194 | Region VI | Iloilo City DEO | Completed | ₱10.3M | 100% | Medium risk44 | —-0.084 |
| 199 | 22GJ0004PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO-CAPIZ RD (OLD ROUTE) (S00507PN) - K0004+(-728) - K0004+(-120) | Region VI | Iloilo City DEO | Completed | ₱7.3M | 100% | Medium risk44 | —-0.086 |
| 200 | 19GI0086SUPPLY/DELIVERY, PLACING/SPREADING AND COMPACTION OF FILLING MATERIALS FOR THE NEW DOH-CHDWV MAIN BUILDING SITE, BRGY. BOLONG OESTE, STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱5.2M | 100% | Medium risk42 | —-0.040 |