Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱3.4B
Average progress
99.3%
Completion rate
98.6%
Average risk score
49.1
Medium risk on average, out of 100
Flagged as unusual
4
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 71 | ₱3.2B | 49.3 | 3 | 100.0% |
| Region IV-B | 1 | ₱187.8M | 60.6 | 1 | 51.9% |
| Region II | 1 | ₱2.7M | 23.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱2.2B | 50.8 | 3 | 98.7% |
| Buildings and Facilities | 16 | ₱260.3M | 34.7 | 1 | 100.0% |
| Flood Control and Drainage | 13 | ₱592.6M | 50.2 | 0 | 100.0% |
| OTHER | 6 | ₱352.8M | 74.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17PE0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS BALLAY-TABIO-TONOMAN-BULALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.016 |
| 17PE0027REHABILITATION OF STO. TOMAS RAIN WATER BASIN, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱88.8M | 100% | High risk75 | —-0.018 |
| 19PF0029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS ACOP-KAPANGAN-KIBUNGAN-BAKUN RD K0280+430 - K0280 + 500, K0281+900 - K0283 + 950, K0284+020 - K0287 + 000 AND K0348+00 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57M | 100% | High risk75 | —-0.024 |
| 18PF0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, ACOP - KAPANGAN-KIBUNGAN-BAKUN ROAD JCT. TO KAPANGAN CENTRAL GASWILING-CATIOAN ROAD-BAGULIN ROAD IN SUPPORT OF COFFEE,BAMBOO,FOOD AND FEED CROPS,CUTFLOWERS AND FRUI | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱55.2M | 100% | High risk73 | —-0.024 |
| 17PE0017REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSES AND LANDSLIDES ALONG BAGUIO-ITOGON ROAD, K0257+410 - K0257+440, K0259+485-K0259+535, K0260+515-K0260+650, K0261+260-K0261+460, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱20.1M | 100% | High risk73 | —-0.027 |
| 18PE0031CONSTRUCTION OF CONCRETE ROAD - CAMP 3 TORRE-MANGGA-BELIS-PIMIMINGGAN-ANSAGAN PROPER ROAD IN SUPPORT OF CACAO AND COFFEE INDUSTRY, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱35.3M | 100% | High risk72 | —-0.025 |
| 17PE0018CONSTRUCTION OF BALILI FLOOD CONTROL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱24.3M | 100% | High risk65 | —-0.040 |
| 17PE0022CONSTRUCTION OF BANGAO FLOOD CONTROL, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.3M | 100% | High risk65 | —-0.042 |
| 18PF0001CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF TUBLAY CENTRAL FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱93.5M | 100% | High risk63 | —-0.056 |
| 17PG0026REHABILITATION/ RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BANAUE-HUNGDUAN-BENGUET BOUNDARY ROAD, HUNGDUAN, IFUGAO, K0360+022 - K0360+043, K0360+089 - K0360+144, K0360+080 - K0360+193.90, K0361+418 - K0361+500,.. | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱82.5M | 100% | High risk63 | —-0.037 |
| 17PK0014ROAD UPGRADING )(UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING RO PAVED ROAD STRATEGIES (HDM-4 PROJECT ANALYSIS) ,MT.PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT RD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱96M | 100% | High risk63 | —-0.024 |
| 17PE0015REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSES AND LANDSLIDES ALONG KENNON ROAD, K0236+305 - K0236+365, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48.8M | 100% | High risk61 | —-0.047 |
| 23E00098SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF PUERTO PRINCESA WEST COASTAL BYPASS ROAD, BRGY. BACUNGAN-SIMPOCAN, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱187.8M | 52% | High risk61 | Flagged0.003 |
| 17PF0014ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY, ACOP- KAPANGAN-KIBUNGAN-BAKUN ROAD, K0264+050-K0265+347, K0265+415-K0265+964, K0267+200-K0269+535, K0269+551-K0271+297, K0271+425-K | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱38.3M | 100% | High risk60 | —-0.048 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17PK0094CONSTRUCTION/OPENING OF CAGALUAN, PASIL TO LEGLEG, TANGLAG, LUBUAGAN ACCESS ROAD. | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱19M | 100% | Medium risk53 | Flagged0.007 |
| 16PE0052CONSTRUCTION OF 4ST24CL SCHOOL BUILDING BENGUET NATIONAL HIGH SCHOOL-MAIN, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.4M | 100% | Medium risk45 | Flagged0.006 |
| 23E00098SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF PUERTO PRINCESA WEST COASTAL BYPASS ROAD, BRGY. BACUNGAN-SIMPOCAN, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱187.8M | 52% | High risk61 | Flagged0.003 |
| 17PE0042CLUSTERED FARM-TO-MARKET ROAD (FMR) PROJECT, ALONG, BOKOD AND KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱35.8M | 100% | Medium risk54 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18PA0101REHABILITATION OF DANGLAS-KARKARISKIS-GANAO ROAD, DANGLAS AND LA PAZ ABRA, DANGLAS-KARKARISKIS-GANAO ROAD, DANGLAS AND LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱48.9M | 100% | Medium risk53 | —-0.076 |
| 27 | 18PA0118REHABILITATION/IMPROVEMENT OF GANAO LIGUIS ROAD, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk53 | —-0.077 |
| 28 | 18PE0035CONSTRUCTION OF CONCRETE ROAD - BALLAY-TABIO-TONOMAN-BULALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱55.8M | 100% | Medium risk52 | —-0.081 |
| 29 | 18PF0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, ACOP-KAPANGAN-KIBUNGAN, BAKUN ROAD JUNCTION TO BANGHO-DACLAN-BASIL-TUBLAY CENTRAL ROAD IN SUPPORT OF COFFEE, BAMBOO, CUTFLOWERS AND FRUIT TREES INDUSTRIES, TUBLAY, | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱70.1M | 100% | Medium risk51 | —-0.076 |
| 30 | 20PE0019RECONSTRUCTION TO CONCRETE PAVEMENT, 280MM - SPECIFIC LOCATION ALONG SHILAN-BECKEL ROAD (S00385LZ), K0261+050 - K0263+3358, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱57.6M | 100% | Medium risk51 | —-0.080 |
| 31 | 18PK0032CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES, LUBUAGAN-BATONG BUHAY JUNCTION AWICHON-UPPER UMA ROAD IN SUPPORT OF HOMESTYLES INDUSTRY (SOFTBROOM MAKING & BLACKSMITH) | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱33.4M | 100% | Medium risk51 | —-0.075 |
| 32 | 19PF0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF TUBLAY CENTRAL FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.064 |
| 33 | 18PA0161CONCRETING OF FARM TO MARKET ROAD, BRGY. MUDENG AND LIGUIS, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱19.2M | 100% | Medium risk50 | —-0.031 |
| 34 | 20PE0092CONSTRUCTION OF EVACUATION CENTER, TABLAN, KABAYAN, BARRIO, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱34.7M | 100% | Medium risk50 | —-0.074 |
| 35 | 19PE0004PREVENTIVE MAINTENANCE OF ROAD: SLURRY SURFACE TREATMENT 12MM - SPECIFIC LOCATIONS ALONG BAGUIO-BAUANG ROAD (S00397LZ), K0293+342 - K0298+069, SABLAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱52.6M | 100% | Medium risk49 | —-0.080 |
| 36 | 18PE0033CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BENGUET-NUEVA VISCAYA ROAD, K0254+(-034) - K0254+255, K0314+570-K0314 + 680, LA TRINIDAD AND BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.9M | 100% | Medium risk48 | —-0.084 |
| 37 | 18PE0034CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0313+314-K0313+388, K0314+103-K0314+227, K0314+439-K0314+496, K0314+520-K0314+570, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.8M | 100% | Medium risk48 | —-0.082 |
| 38 | 20PE0028CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG CONG. ANDRES ACOP COSALAN ROAD (S00379LZ), K0328+520 - K0328+640, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.9M | 100% | Medium risk48 | —-0.082 |
| 39 | 20PE0027CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BENGUET - NUEVA VIZCAYA ROAD (S00382LZ), K0254+255 - K0254+370, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48M | 100% | Medium risk48 | —-0.078 |
| 40 | 18PE0058REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG KENNON ROAD, K0233+904-K0234+000,TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱48.9M | 100% | Medium risk48 | —-0.075 |
| 41 | 19PE0072CONSTRUCTION OF BOKOD MUNICIPAL BUILDING, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.083 |
| 42 | 18PE0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN, AMBALANGA SECTION, STA. 155+560 - STA. 156+560, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.9M | 100% | Medium risk48 | —-0.066 |
| 43 | 18PE0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD CONTROL ADAOAY, STA. 17+590 - STA. 18+040, STA.17+880 - STA. 17+940, STA. 18+600 - STA. 18+820, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱47.5M | 100% | Medium risk47 | —-0.067 |
| 44 | 19PE0060CONSTRUCTION OF KABAYAN MUNICIPAL BUILDING,KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.083 |
| 45 | 18PG0035ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (SECONDARY ROADS) KIANGAN, IFUGAO ROAD, K0313+740-K0313+884, KIANGAN, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱46.8M | 100% | Medium risk47 | —-0.084 |
| 46 | 18PG0036ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES (SECONDARY ROADS) HINGYON, IFUGAO ROAD, K0329+165-K0329+300, HINGYON, IFUGAO | Cordillera Administrative Region | Ifugao 1st DEO | Completed | ₱46.7M | 100% | Medium risk47 | —-0.084 |
| 47 | 19PE0025CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION FLOOD MITIGATION STRUCTURE ALONG NAGUILLIAN RIVER BASIN, BALILI RIVER SECTION, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.063 |
| 48 | 18PE0100CONSTRUCTION OF 4 STOREY 6 CLASSROOM 1 REGULAR WORKSHOP 2 SCIENCE LAB 2 ICT LAB SCHOOL BUILDING AT LA TRINIDAD NHS, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱35.8M | 100% | Medium risk47 | —-0.025 |
| 49 | 18PE0101CONSTRUCTION OF 4 STOREY 8 CLASSROOM 2 SCIENCE LAB 2 ICT LAB SCHOOL BUILDING AT EASTERN LA TRINIDAD NHS, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱32.1M | 100% | Medium risk47 | —-0.028 |
| 50 | 18PE0088CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT PUGUIS ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱37.7M | 100% | Medium risk46 | —-0.024 |