11 projects on file, including joint ventures this contractor is part of.
Total projects
11
Total budget
₱207.3M
Average progress
100.0%
Completion rate
100.0%
Average risk score
35.6
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 11 | ₱207.3M | 35.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 5 | ₱52.5M | 34.8 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱13.7M | 30.5 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱126.2M | 44.3 | 0 | 100.0% |
| Roads | 1 | ₱14.8M | 37.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24EB0095CONSTRUCTION OF ROAD SLOPE PROTECTION, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱77.2M | 100% | Medium risk46 | —-0.065 |
| 2 | 23EB0025CONSTRUCTION OF SEAWALL, BARANGAY BONBON, STA 0+000 - STA 0+320, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.066 |
| 3 | 24EB0092CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), MUNICIPAL HALL, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱29.7M | 100% | Medium risk38 | —-0.076 |
| 4 | 24EB0083CONSTRUCTION OF ROAD, BARANGAY TAGBAC, LUBANG, OCCIDENTAL MINDORO (PHASE I) | Region IV-B | Mindoro Occidental DEO | Completed | ₱14.8M | 100% | Medium risk37 | —-0.083 |
| 5 | 23EB0072CONSTRUCTION OF LEVEL II WATER SYSTEM, BARANGAY GUITNA, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱4.9M | 100% | Medium risk36 | —-0.040 |
| 6 | 23EB0073CONSTRUCTION OF LEVEL II WATER SYSTEM, BARANGAY ARAW AT BITUIN, LUBANG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.040 |
| 7 | 24EB0091CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), LOOC NATIONAL HIGH SCHOOL, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱6.9M | 100% | Medium risk35 | —-0.081 |
| 8 | 23EB0071CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), BONBON, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱5.9M | 100% | Medium risk34 | —-0.077 |
| 9 | 24EB0106CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN BALIKYAS ELEMENTARY SCHOOL, BARANGAY BALIKYAS, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱5M | 100% | Medium risk33 | —-0.039 |
| 10 | 22EB0116CONSTRUCTION OF 1STY2CL, AGKAWAYAN ES, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱5M | 100% | Medium risk33 | —-0.040 |
| 11 | 18EB0099LIP-CONST. OF BULI DOMESTIC WATER SYSTEM W/ ELEVATED TANK, SO. BULI, CABRA, LUBANG, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱3.8M | 100% | Low risk20 | —-0.039 |