Opening the dossier…
Opening the dossier…
Contractor dossier
110 projects on file, including joint ventures this contractor is part of.
Total projects
110
Total budget
₱6B
Average progress
93.6%
Completion rate
69.1%
Below 70%
Average risk score
55.5
Medium risk on average, out of 100
Flagged as unusual
15
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 110 | ₱6B | 55.5 | 15 | 93.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 38 | ₱1.9B | 51.1 | 2 | 97.4% |
| Flood Control and Drainage | 30 | ₱1.8B | 53.2 | 2 | 95.0% |
| Bridges | 21 | ₱995.4M | 52.5 | 3 | 90.4% |
| OTHER | 11 | ₱1.1B | 81.5 | 7 | 80.8% |
| Buildings and Facilities | 8 | ₱203.2M | 48.6 | 0 | 98.8% |
| GAA 2025 OO-1 | 2 | ₱81.4M | 93.2 | 1 | 83.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IG0011NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ABUYOG BY-PASS ROAD, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱49M | 100% | High risk94 | —-0.009 |
| 23I00226SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVER BANK PROTECTION (REVETMENT) (BARUGO) | Region VIII | Region VIII | On-Going | ₱96.4M | 80% | High risk93 | Flagged0.068 |
| 25I00109BRIDGE - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DIIT BR. (B00024LT) ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱32.4M | 66% | High risk92 | Flagged0.005 |
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | Region VIII | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 25ID0072CONCRETING OF BRGY. SAN ISIDRO TO BRGY. OSMEÑA FMR,BRGY. SAN ISIDRO AND BRGY. OSMEÑA, MAC ARTHUR,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱14.9M | 85% | High risk90 | Flagged0.046 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 24I00383ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0935+(-122.80) - K0935+(-039), K0935+125 - K0935+250 | Region VIII | Region VIII | On-Going | ₱71.8M | 76% | High risk82 | Flagged0.006 |
| 24ID0064FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER BANK PROTECTION RETAINING WALL ALONG LABIRANAN RIVER,BRGY. SAN JOSE,DULAG,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱77.2M | 95% | High risk82 | Flagged0.008 |
| 24ID0104CONSTRUCTION OF BALUD BRIDGE ALONG MINUHANG (BALUARTE)-BALUD AND BALUD-DUKA ROAD CONNECTING BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA NATIONAL ROAD (PHASE 2),BARUGO,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱53M | 100% | High risk81 | —-0.003 |
| 21I00019NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - JARO - RUBAS - ORMOC ROAD (JARO SIDE), LEYTE, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱83.2M | 100% | High risk81 | —-0.030 |
| 23I00225SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVERBANK PROTECTION, BARUGO, LEYTE | Region VIII | Region VIII | On-Going | ₱96.4M | 88% | High risk72 | Flagged0.032 |
| 25I00117BRIDGE - WIDENING OF PERMANENT BRIDGES - DAGUITAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱141.3M | 42% | High risk66 | Flagged0.003 |
| 24IM0078REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, GUADALUPE HEIGHTS 1, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 57% | High risk65 | —-0.011 |
| 24I00150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF (RCDG) REINFORCED CONCRETE DECK GIRDER BRIDGE FROM BARANGAY MAHAGN | Region VIII | Region VIII | On-Going | ₱144.7M | 88% | High risk65 | —-0.002 |
| 24IM0076REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, SALVACION HEIGHTS, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.4M | 80% | High risk65 | —-0.017 |
| 20I00081CLUSTER 1: 1. CONSTRUCTION OF ROCK GUARD SLOPE PROTECTION ALONG BURAUEN - MAHAGNAO ROAD, K0988+780 - K0989+020, BURAUEN, LEYTE; AND TWO (2) OTHER LOCATIONS IN BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱283.4M | 100% | High risk64 | —-0.051 |
| 21I00044BRIDGE - WIDENING OF PERMANENT BRIDGES - HIMANGLOS BR. (B00487LT) ALONG BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD, BARUGO, LEYTE | Region VIII | Region VIII | Completed | ₱124.2M | 100% | High risk64 | —-0.040 |
| 21I00063ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+560 - K0989+685, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |
| 21I00064ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+685 - K0989+810, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | Region VIII | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 23I00226SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVER BANK PROTECTION (REVETMENT) (BARUGO) | Region VIII | Region VIII | On-Going | ₱96.4M | 80% | High risk93 | Flagged0.068 |
| 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 25ID0072CONCRETING OF BRGY. SAN ISIDRO TO BRGY. OSMEÑA FMR,BRGY. SAN ISIDRO AND BRGY. OSMEÑA, MAC ARTHUR,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱14.9M | 85% | High risk90 | Flagged0.046 |
| 23I00225SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVERBANK PROTECTION, BARUGO, LEYTE | Region VIII | Region VIII | On-Going | ₱96.4M | 88% | High risk72 | Flagged0.032 |
| 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 19IK0023REPLACEMENT OF PERMANENT WEAK BRIDGE, FIRST BRIDGE (B00375SM) FROM 2 LANES TO 4 LANES ALONG DAANG MAHARLIKA | Region VIII | Samar 2nd DEO | On-Going | ₱17M | 55% | Medium risk49 | Flagged0.021 |
| 23ID0120CONSTRUCTION OF SHORE PROTECTION,BARANGAY MINUHANG,BARUGO,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk54 | Flagged0.013 |
| 24IC0162CONCRETING OF BRGY. SAN JUAN, STA. FE TO BRGY. CAMBAHANON, ALANGALANG FMR, BRGY. SAN JUAN, STA. FE AND BRGY. CAMBAHANON, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱35.8M | 73% | Medium risk51 | Flagged0.008 |
| 24ID0064FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER BANK PROTECTION RETAINING WALL ALONG LABIRANAN RIVER,BRGY. SAN JOSE,DULAG,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱77.2M | 95% | High risk82 | Flagged0.008 |
| 24I00383ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0935+(-122.80) - K0935+(-039), K0935+125 - K0935+250 | Region VIII | Region VIII | On-Going | ₱71.8M | 76% | High risk82 | Flagged0.006 |
| 25I00109BRIDGE - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DIIT BR. (B00024LT) ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱32.4M | 66% | High risk92 | Flagged0.005 |
| 23IM0130IMPROVEMENT OF BRGY. NEW KAWAYAN-STO. NIÑO FMR, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱20.9M | 100% | Medium risk52 | Flagged0.003 |
| 25I00117BRIDGE - WIDENING OF PERMANENT BRIDGES - DAGUITAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱141.3M | 42% | High risk66 | Flagged0.003 |
| 23IC0028BRIDGE - WIDENING OF PERMANENT BRIDGES - KILING BRIDGE (B00521LT) ALONG TANAUAN-DAGAMI ROAD, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱29M | 53% | Medium risk49 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IG0011NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ABUYOG BY-PASS ROAD, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱49M | 100% | High risk94 | —-0.009 |
| 2 | 23I00226SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVER BANK PROTECTION (REVETMENT) (BARUGO) | Region VIII | Region VIII | On-Going | ₱96.4M | 80% | High risk93 | Flagged0.068 |
| 3 | 25I00109BRIDGE - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - DIIT BR. (B00024LT) ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱32.4M | 66% | High risk92 | Flagged0.005 |
| 4 | 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | Region VIII | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 5 | 25ID0072CONCRETING OF BRGY. SAN ISIDRO TO BRGY. OSMEÑA FMR,BRGY. SAN ISIDRO AND BRGY. OSMEÑA, MAC ARTHUR,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱14.9M | 85% | High risk90 | Flagged0.046 |
| 6 | 23ID0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES ECONOMIC ZONES(ROADS LEVERAGING FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) MINUHANG (BALUARTE) -BALUD AND BALUD-DUKA ROAD CON | Region VIII | Leyte 2nd DEO | On-Going | ₱144.7M | 100% | High risk83 | Flagged0.021 |
| 7 | 22I00070SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, BURAUEN, LEYTE | Region VIII | Region VIII | On-Going | ₱286.3M | 91% | High risk83 | Flagged0.049 |
| 8 | 24I00383ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LT) - K0935+(-122.80) - K0935+(-039), K0935+125 - K0935+250 | Region VIII | Region VIII | On-Going | ₱71.8M | 76% | High risk82 | Flagged0.006 |
| 9 | 24ID0064FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER BANK PROTECTION RETAINING WALL ALONG LABIRANAN RIVER,BRGY. SAN JOSE,DULAG,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱77.2M | 95% | High risk82 | Flagged0.008 |
| 10 | 24ID0104CONSTRUCTION OF BALUD BRIDGE ALONG MINUHANG (BALUARTE)-BALUD AND BALUD-DUKA ROAD CONNECTING BAGAHUPI-BABATNGON-STA. CRUZ-BARUGO-CARIGARA NATIONAL ROAD (PHASE 2),BARUGO,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱53M | 100% | High risk81 | —-0.003 |
| 11 | 21I00019NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS - JARO - RUBAS - ORMOC ROAD (JARO SIDE), LEYTE, LEYTE 2ND LD | Region VIII | Region VIII | Completed | ₱83.2M | 100% | High risk81 | —-0.030 |
| 12 | 23I00225SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVERBANK PROTECTION, BARUGO, LEYTE | Region VIII | Region VIII | On-Going | ₱96.4M | 88% | High risk72 | Flagged0.032 |
| 13 | 25I00117BRIDGE - WIDENING OF PERMANENT BRIDGES - DAGUITAN PARALLEL BR. ALONG MAHARLIKA HIGHWAY | Region VIII | Region VIII | On-Going | ₱141.3M | 42% | High risk66 | Flagged0.003 |
| 14 | 24IM0078REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, GUADALUPE HEIGHTS 1, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.5M | 57% | High risk65 | —-0.011 |
| 15 | 24I00150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF (RCDG) REINFORCED CONCRETE DECK GIRDER BRIDGE FROM BARANGAY MAHAGN | Region VIII | Region VIII | On-Going | ₱144.7M | 88% | High risk65 | —-0.002 |
| 16 | 24IM0076REHABILITATION OF ROAD WITH DRAINAGE, TACLOBAN NORTH RESETTLEMENT, SALVACION HEIGHTS, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱49.4M | 80% | High risk65 | —-0.017 |
| 17 | 20I00081CLUSTER 1: 1. CONSTRUCTION OF ROCK GUARD SLOPE PROTECTION ALONG BURAUEN - MAHAGNAO ROAD, K0988+780 - K0989+020, BURAUEN, LEYTE; AND TWO (2) OTHER LOCATIONS IN BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱283.4M | 100% | High risk64 | —-0.051 |
| 18 | 21I00044BRIDGE - WIDENING OF PERMANENT BRIDGES - HIMANGLOS BR. (B00487LT) ALONG BAGAHUPI - BABATNGON - STA. CRUZ - BARUGO - CARIGARA RD, BARUGO, LEYTE | Region VIII | Region VIII | Completed | ₱124.2M | 100% | High risk64 | —-0.040 |
| 19 | 21I00063ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+560 - K0989+685, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |
| 20 | 21I00064ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BURAUEN - MAHAGNAO RD. - K0989+685 - K0989+810, BURAUEN, LEYTE | Region VIII | Region VIII | Completed | ₱144.7M | 100% | High risk64 | —-0.064 |
| 21 | 22I00051CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURE, SABANG, DULAG, LEYTE | Region VIII | Region VIII | Completed | ₱96M | 100% | High risk63 | —-0.067 |
| 22 | 25IC0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MASLOG RIVER, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱96.4M | 53% | High risk63 | —-0.019 |
| 23 | 24ID0026FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITAGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF SLOPE PROTECTION ALONG DAGUITAN RIVER,BARANGAY POBLACION DISTRICT IX,BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱95.8M | 100% | High risk63 | —-0.068 |
| 24 | 23ID0083REPAIR/REHABILITATION/RECONSTRUCTION OF MARABONG BRIDGE(B00083LT),K0976+535 ALONG JARO-DAGAMI-BURAUEN-LA PAZ ROAD ROAD SECTION | Region VIII | Leyte 2nd DEO | Completed | ₱120.4M | 100% | High risk63 | —-0.045 |
| 25 | 24IC0028CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DRAINAGE SYSTEM AND FLOOD WATER IMPOUNDING AREA), BRGY. CANGUMBANG, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱98.9M | 100% | High risk63 | —-0.067 |