Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱10.3B
Average progress
94.1%
Completion rate
87.3%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
9
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 119 | ₱8.2B | 45.9 | 7 | 94.2% |
| Central Office | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| Region VIII | 3 | ₱75M | 47.1 | 0 | 100.0% |
| National Capital Region | 2 | ₱53.5M | 50.9 | 0 | 47.9% |
| Region I | 1 | ₱24.6M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 83 | ₱7.5B | 51.6 | 8 | 93.3% |
| Bridges | 22 | ₱1B | 40.2 | 0 | 98.5% |
| Roads | 16 | ₱1.1B | 42.9 | 0 | 100.0% |
| Buildings and Facilities | 12 | ₱558.6M | 42.3 | 0 | 83.0% |
| OTHER | 1 | ₱148.4M | 79.5 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 25CG0033FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT BARANGAY CANDELARIA, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 64% | High risk80 | —-0.002 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 22O00080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Central Office | Flood Control Management Cluster | On-Going | ₱190.3M | 98% | High risk77 | —-0.010 |
| 24CC0180CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 65% | High risk76 | —-0.010 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 24CC0036CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA,BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.062 |
| 24CC0178CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT PANDUCOT, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 19C00040FLOOD CONTROL WORKS-SLOPE PROTECTION WORKS ALONG STA. FE AND STA. FILOMENA ALONG GUAGUA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱96.9M | 100% | High risk75 | —-0.058 |
| 21O00097PASIG RIVER FERRY CONVERGENCE PROGRAM - PILOT CHANNELING AT LAGUNA LAKE (STA. 4+000 - STA. 4+950), PHASE III | Central Office | Flood Control Management Cluster | Completed | ₱142.2M | 100% | High risk75 | —-0.057 |
| 24CG0030NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES CONSTRUCTION (COMPLETION) OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱23.8M | 0% | High risk73 | —-0.006 |
| 17CH0078FLOOD CONTROL PROJECTS IN CENTRAL LUZON-FLOOD CONTROL WORKS IN PORAC-GUMAIN RIVER, LUBAO, SASMUAN AN | Central Office | Flood Control Management Cluster | Completed | ₱60.3M | 100% | High risk72 | —-0.072 |
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 24CH0154REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SAN MIGUEL SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17CH0086CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-FLOOD CONTROL WORKS IN G | Region III | Pampanga 2nd DEO | Completed | ₱46.5M | 100% | High risk68 | —-0.061 |
| 27 | 17CH0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱44.8M | 100% | High risk67 | —-0.060 |
| 28 | 17CG0042REHABILITATION/IMPROVEMENT & SLOPE PROTECTION OF LOURDES RIVER, MINALIN, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱36.1M | 100% | High risk66 | —-0.009 |
| 29 | 17CG0041REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. RITA, SAN LUIS, PAMPANGA (PHASE 1). | Region III | Pampanga 1st DEO | Completed | ₱45.6M | 100% | High risk65 | —-0.006 |
| 30 | 25CG0076SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF APALIT BRIDGE AND BYPASS ROAD AT BARANGAY TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱37.1M | 68% | High risk63 | —-0.004 |
| 31 | 17CG0155CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGE CADUANG TETE BRIDGE (B01462LZ) ALONG APALIT-MACABEBE-APALIT ROAD, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱45.4M | 100% | High risk62 | —-0.030 |
| 32 | 22CK0077CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, SACOBIA - BAMBAN RIVER, LEFT BANK, BRGY. SAN FRANCISCO, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱93.2M | 100% | High risk62 | —-0.078 |
| 33 | 22CK0079CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, SACOBIA - BAMBAN RIVER, LEFT BANK, BRGY. STA. RITA, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱93.2M | 100% | High risk62 | —-0.078 |
| 34 | 25CG0019FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PAMPANGA RIVER BANK, BARANGAY SULIPAN, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 67% | Medium risk59 | —-0.028 |
| 35 | 18CB0036FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DREDGING OF TALISAY RIVER (TORTUGAS SECTION), BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.075 |
| 36 | 23C00055FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-FLOOD CONTROL WORKS-DIKING/SLOPE PROTECTION OF PASIG-POTRERO RIVER, BACOLOR AND PORAC, PAMPANGA, PROV. OF PAMPANGA | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk58 | —-0.065 |
| 37 | 25C00068FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ABACAN RIVER, DIKING AND SLOPE PROTECTION WORKS-PHASE 2, MEXICO, PAMPANGA | Region III | Region III | On-Going | ₱170.1M | 49% | Medium risk58 | —-0.017 |
| 38 | 22CH0003CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG ANGELES-PORAC BYPASS ROAD (PHASE III), PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.1M | 100% | Medium risk57 | —-0.077 |
| 39 | 22CH0002CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG ANGELES-PORAC BYPASS ROAD (PHASE II), PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.1M | 100% | Medium risk57 | —-0.077 |
| 40 | 22CH0064REHABILITATION/IMPROVEMENT OF GUAGUA RIVER, STA. URSULA-SAN RAFAEL, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 41 | 23CH0062REHABILITATION OF SLOPE PROTECTION ALONG UPPER DALAN BAPOR, PHASE II, AT SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.079 |
| 42 | 23CC0236CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG CALERO RIVER AND ITS TRIBUTARIES, BARANGAY ATLAG, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.080 |
| 43 | 22CH0044REHABILITATION/IMPROVEMENT OF GUAGUA PASAK RIVER, PHASE 3, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.078 |
| 44 | 22CH0082CONSTRUCTION OF SLOPE PROTECTION ALONG BETIS RIVER AND ITS TRIBUTARIES AT GUAGUA, PAMPANGA, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.080 |
| 45 | 24CH0097REHABILITATION OF SLOPE PROTECTION WORKS INCLUDING ROADS ALONG SAPANG MARAGUL RIVER DIKE (BETIS SECTION), BETIS, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 46 | 24CH0087FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG GUAGUA RIVER (BETIS SECTION) PHASE 2, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.080 |
| 47 | 18CH0074CONSTRUCTION/REPAIR/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS OF LOWER DALAN BAPOR, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.077 |
| 48 | 23CC0242CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG CALERO RIVER AND ITS TRIBUTARIES, BARANGAY MASILE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 49 | 17CJ0081CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS; WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BALAOANG BR. 1 (BO1367LZ) ALONG PANIQUI - CAMILING - WAWA ROAD | Region III | Tarlac DEO | Completed | ₱30.5M | 100% | Medium risk56 | —-0.035 |
| 50 | 17CJ0083CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS; WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BARANGOBONG BR. 2 (BO1365LZ) ALONG PANIQUI - CAMILING - WAWA ROAD | Region III | Tarlac DEO | Completed | ₱30.8M | 100% | Medium risk56 | —-0.036 |