Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱10.3B
Average progress
94.1%
Completion rate
87.3%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
9
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 119 | ₱8.2B | 45.9 | 7 | 94.2% |
| Central Office | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| Region VIII | 3 | ₱75M | 47.1 | 0 | 100.0% |
| National Capital Region | 2 | ₱53.5M | 50.9 | 0 | 47.9% |
| Region I | 1 | ₱24.6M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 83 | ₱7.5B | 51.6 | 8 | 93.3% |
| Bridges | 22 | ₱1B | 40.2 | 0 | 98.5% |
| Roads | 16 | ₱1.1B | 42.9 | 0 | 100.0% |
| Buildings and Facilities | 12 | ₱558.6M | 42.3 | 0 | 83.0% |
| OTHER | 1 | ₱148.4M | 79.5 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 25CG0033FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT BARANGAY CANDELARIA, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 64% | High risk80 | —-0.002 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 22O00080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Central Office | Flood Control Management Cluster | On-Going | ₱190.3M | 98% | High risk77 | —-0.010 |
| 24CC0180CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 65% | High risk76 | —-0.010 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 24CC0036CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA,BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.062 |
| 24CC0178CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT PANDUCOT, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 19C00040FLOOD CONTROL WORKS-SLOPE PROTECTION WORKS ALONG STA. FE AND STA. FILOMENA ALONG GUAGUA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱96.9M | 100% | High risk75 | —-0.058 |
| 21O00097PASIG RIVER FERRY CONVERGENCE PROGRAM - PILOT CHANNELING AT LAGUNA LAKE (STA. 4+000 - STA. 4+950), PHASE III | Central Office | Flood Control Management Cluster | Completed | ₱142.2M | 100% | High risk75 | —-0.057 |
| 24CG0030NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES CONSTRUCTION (COMPLETION) OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱23.8M | 0% | High risk73 | —-0.006 |
| 17CH0078FLOOD CONTROL PROJECTS IN CENTRAL LUZON-FLOOD CONTROL WORKS IN PORAC-GUMAIN RIVER, LUBAO, SASMUAN AN | Central Office | Flood Control Management Cluster | Completed | ₱60.3M | 100% | High risk72 | —-0.072 |
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 24CH0154REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SAN MIGUEL SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 17CG0324CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES SAN BARTOLOME BR (B04192LZ) ALONG STO. TOMAS-MINALIN ROAD (MINALIN-MACABEBE SECTION) , STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱20.2M | 100% | Medium risk55 | —-0.039 |
| 52 | 20C00025NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 5, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk53 | —-0.076 |
| 53 | 20C00022NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 3, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱193M | 100% | Medium risk53 | —-0.066 |
| 54 | 23CG0039SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF APALIT BRIDGE AND BYPASS ROAD AT BARANGAY TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.1M | 100% | Medium risk52 | —-0.055 |
| 55 | 23CG0038NATIONAL BUILDING PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.1M | 100% | Medium risk52 | —-0.078 |
| 56 | 22O00045REHABILITATION/RETROFITTING OF SCHOOL OF URBAN AND REGIONAL PLANNING (SURP), UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱30M | 64% | Medium risk52 | —-0.032 |
| 57 | 18C00084LOCAL PROGRAMS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION/IMPROVEMENT/UPGRADING OF LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (PHASE 4), PAMPANGA | Region III | Region III | Completed | ₱139.2M | 100% | Medium risk52 | —-0.069 |
| 58 | 24CI0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF ROADA AND DRAINAGE IN ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱117.2M | 100% | Medium risk51 | —-0.086 |
| 59 | 24O00046REHABILITATION/RETROFITTING OF SCHOOL OF URBAN AND REGIONAL PLANNING (SURP), UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON CITY, PHASE II | National Capital Region | National Capital Region | On-Going | ₱23.5M | 32% | Medium risk50 | —-0.041 |
| 60 | 18IC0001REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TIGBAO-PULAK-STA. FE ROAD (S00039LT) STA. K0910+360 - K0910+830, STA. K0910+830 - K0911+136, STA. FE, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱46.5M | 100% | Medium risk49 | —-0.096 |
| 61 | 20CH0027VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ANGELES-PORAC-BYPASS ROAD, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱92.6M | 100% | Medium risk47 | —-0.088 |
| 62 | 18IC0055CONST./REHAB./IMPROVEMENT OF FLOOD CONTROL PROJECT ALONG LIMBUHAN RIVER, CHAINAGE 1090 - CHAINAGE 1230, TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.079 |
| 63 | 17IC0001RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, EMBARKADERO BRIDGE (B00036LT) ALONG DAANG MAHARLIKA (LT), TANAUAN, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.034 |
| 64 | 18AJ0022CONSTRUCTION OF PROTECTION WORKS ALONG INGALERA RIVER, MACABITO SECTION, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱24.6M | 100% | Medium risk45 | —-0.071 |
| 65 | 19C00050REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, REHABILITATION/IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT CANDATING, ARAYAT, PAMPANGA, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱82.9M | 100% | Medium risk45 | —-0.014 |
| 66 | 18CH0152RESTORATION OF DIKE WITH SLOPE PROTECTION ALONG POTRERO RIVER MANCATIAN PORAC, PAMPANGA PHASE I, STA. 0+000-STA.0+461.36, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱85.4M | 100% | Medium risk44 | —-0.017 |
| 67 | 18CH0153RESTORATION OF DIKE WITH SLOPE PROTECTION ALONG POTRERO RIVER MANCATIAN PORAC, PAMPANGA PHASE II. STA. 0+000-STA. 0+461.36, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱85.4M | 100% | Medium risk44 | —-0.017 |
| 68 | 20CM0080ASPHALT OVERLAY ALONG OLONGAPO-BUGALLON ROAD, K0126+(-020) - K0126+226, K0128+574 - K128+678, K0128+864 - K0129+015, K0130+403 - K0131+560, K0132+355 - K0133+186, K0134+090 - K0134+800, OLONGAPO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱57.1M | 100% | Medium risk42 | —-0.096 |
| 69 | 19CG0034REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT BUAS, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.081 |
| 70 | 19CG0056REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.080 |
| 71 | 19CG0032REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT GULAP, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.079 |
| 72 | 18CG0114REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG MANDASIG (PHASE I), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.081 |
| 73 | 21CH0039FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION ANGELES-PORAC BYPASS ROAD, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.077 |
| 74 | 18CG0091REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. CATALINA (PHASE II), SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.3M | 100% | Medium risk41 | —-0.082 |
| 75 | 22CG0056NATIONAL BUILDING PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱70.2M | 100% | Medium risk41 | —-0.093 |