Opening the dossier…
Opening the dossier…
Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱10.3B
Average progress
94.1%
Completion rate
87.3%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
9
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 119 | ₱8.2B | 45.9 | 7 | 94.2% |
| Central Office | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| Region VIII | 3 | ₱75M | 47.1 | 0 | 100.0% |
| National Capital Region | 2 | ₱53.5M | 50.9 | 0 | 47.9% |
| Region I | 1 | ₱24.6M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 83 | ₱7.5B | 51.6 | 8 | 93.3% |
| Bridges | 22 | ₱1B | 40.2 | 0 | 98.5% |
| Roads | 16 | ₱1.1B | 42.9 | 0 | 100.0% |
| Buildings and Facilities | 12 | ₱558.6M | 42.3 | 0 | 83.0% |
| OTHER | 1 | ₱148.4M | 79.5 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 25CG0033FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT BARANGAY CANDELARIA, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 64% | High risk80 | —-0.002 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 22O00080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Central Office | Flood Control Management Cluster | On-Going | ₱190.3M | 98% | High risk77 | —-0.010 |
| 24CC0180CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 65% | High risk76 | —-0.010 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 24CC0036CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA,BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.062 |
| 24CC0178CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT PANDUCOT, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 19C00040FLOOD CONTROL WORKS-SLOPE PROTECTION WORKS ALONG STA. FE AND STA. FILOMENA ALONG GUAGUA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱96.9M | 100% | High risk75 | —-0.058 |
| 21O00097PASIG RIVER FERRY CONVERGENCE PROGRAM - PILOT CHANNELING AT LAGUNA LAKE (STA. 4+000 - STA. 4+950), PHASE III | Central Office | Flood Control Management Cluster | Completed | ₱142.2M | 100% | High risk75 | —-0.057 |
| 24CG0030NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES CONSTRUCTION (COMPLETION) OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱23.8M | 0% | High risk73 | —-0.006 |
| 17CH0078FLOOD CONTROL PROJECTS IN CENTRAL LUZON-FLOOD CONTROL WORKS IN PORAC-GUMAIN RIVER, LUBAO, SASMUAN AN | Central Office | Flood Control Management Cluster | Completed | ₱60.3M | 100% | High risk72 | —-0.072 |
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 24CH0154REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SAN MIGUEL SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18CH0057CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS OF UPPER DALAN BAPOR, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 77 | 22CI0060BASIC INFRA PROGRAM; NATIONAL BUILDING PROGRAM, CONST OF 2-STOREY OFFICE BUILDING (DPWH STANDARD DESIGN) OF DPWH PAMPANGA 3RD DISTRICT ENGINEERING OFFICE INCLUDING OTHER FACILITIES, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱48.2M | 100% | Medium risk39 | —-0.095 |
| 78 | 20CG0133CONSTRUCTION OF DPWH PAMPANGA 1ST DISTRICT ENGINEERING OFFICE BUILDING, SINDALAN, SAN FERNANDO CITY, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱61.5M | 100% | Medium risk39 | —-0.096 |
| 79 | 23CH0099CONSTRUCTION OF MULTI-PURPOSE BUILDING (INFIRMARY), SANTA RITA, PAMPANGA, SANTA RITA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk38 | —-0.095 |
| 80 | 22CG0012SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF PULILAN, BULACAN (DULONG MALABON) PULILAN - APALIT BYPASS ROAD - TABUYUC BYPASS ROA | Region III | Pampanga 1st DEO | Completed | ₱51.3M | 100% | Medium risk37 | —-0.103 |
| 81 | 23CC0136CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BARANGAY BALUBAD, BULACAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | Medium risk37 | —-0.088 |
| 82 | 19CJ0045FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, RANG AYAN - NANCAMARINAN SECTION, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱83.4M | 100% | Medium risk36 | —-0.079 |
| 83 | 20CG0215ASSET PRESERVATION: PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0052+(-585) - K0052+340, K0056+000 - K0057+571, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱49.1M | 100% | Medium risk36 | —-0.103 |
| 84 | 22CG0030SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CAMBASI BRIDGE AND APPROACHES AT MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱65.4M | 100% | Medium risk36 | —-0.058 |
| 85 | 22CG0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF APALIT BRIDGE AND BYPASS ROAD AT BARANGAY TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱63.4M | 100% | Medium risk36 | —-0.065 |
| 86 | 22CG0071SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF R.C. BRIDGE ACROSS BUNGANG GINTO RIVER, SAN LORENZO (PART OF MEXIC | Region III | Pampanga 1st DEO | Completed | ₱86.7M | 100% | Medium risk36 | —-0.057 |
| 87 | 22CG0041SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAGRADA BRIDGE AND SAGRADA - CAMBASI BYPASS ROAD - MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱65.4M | 100% | Medium risk36 | —-0.058 |
| 88 | 20CG0157BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - MEXICO BR. (B01478LZ) ALONG JOSE ABAD SANTOS AVE. (JASA), MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱60.5M | 100% | Medium risk35 | —-0.062 |
| 89 | 21CG0192LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL BRIDGES - CONSTRUCTION OF SAGRADA BRIDGE AND SAGRADA - CAMBASI BY-PASS ROAD, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱49.5M | 100% | Medium risk35 | —-0.063 |
| 90 | 20CH0004CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANG MARAGUL DIVERSION CHANNEL, SAN JUAN NEPOMUCENO, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱77.4M | 100% | Medium risk35 | —-0.087 |
| 91 | 22CG0010NATIONAL BUILDING PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH PAMPANGA 1ST DEO BUILDING, SINDALAN, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37.4M | 100% | Medium risk35 | —-0.099 |
| 92 | 24CC0186CONSTRUCTION/IMPROVEMENT OF FLOOD MITGATION STRUCTURE AT SAPANG BAYAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱67.5M | 100% | Medium risk34 | —-0.090 |
| 93 | 22CH0085CONSTRUCTION OF SLOPE PROTECTION AT SAPANG MARAGUL RIVER BANK, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱72.4M | 100% | Medium risk34 | —-0.089 |
| 94 | 18CH0047CONSTRUCTION OF SLOPE PROTECTION ALONG GUAGUA RIVER SAN RAFAEL (DUCK ISLAND SECTION), GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱72.4M | 100% | Medium risk34 | —-0.088 |
| 95 | 18CH0086CONCRETING OF ROAD, BRGY. PULUNGMASLE, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱28.1M | 100% | Medium risk34 | —-0.103 |
| 96 | 20CG0235LOCAL INFRASTRUCTURE PROGRAM: LOCAL BRIDGES - REHABILITATION / RECONSTRUCTION / IMPROVEMENT OF STO. ROSARIO PAU BRIDGE AND APPROACHES WITH CONCRETE SLOPE PROTECTION AND DETOUR ROAD, BRGY. STO. ROSARIO PAU, STO. TOMAS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱47.5M | 100% | Medium risk33 | —-0.064 |
| 97 | 21CG0134CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF PULILAN BULACAN (DULONG MALABON) PULILAN - APALIT BY-PASS ROAD (TABUYUC), BARANGAYS TABUYUC AND B | Region III | Pampanga 1st DEO | Completed | ₱34M | 100% | Medium risk33 | —-0.105 |
| 98 | 20CG0214CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: LOCAL ROADS - CONSTRUCTION/ IMPROVEMENT OF MAPALAD- CANDATING ROAD, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.3M | 100% | Medium risk33 | —-0.104 |
| 99 | 19CI0131CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECT;LOCAL ROADS AND BRIDGES:CONST OF ROADS INCLUDING DRAINAGE LEADING TO PAMPANGA ECONOMIC ZONE (PEZ) PHASE II,ANGELES CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱38.5M | 100% | Medium risk33 | —-0.102 |
| 100 | 21CH0095CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD WITH DRAINAGE CANAL, STA. FILOMENA, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱25.1M | 100% | Medium risk32 | —-0.105 |