Contractor dossier
134 projects on file, including joint ventures this contractor is part of.
Total projects
134
Total budget
₱10.3B
Average progress
94.1%
Completion rate
87.3%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
9
6.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 119 | ₱8.2B | 45.9 | 7 | 94.2% |
| Central Office | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| Region VIII | 3 | ₱75M | 47.1 | 0 | 100.0% |
| National Capital Region | 2 | ₱53.5M | 50.9 | 0 | 47.9% |
| Region I | 1 | ₱24.6M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 83 | ₱7.5B | 51.6 | 8 | 93.3% |
| Bridges | 22 | ₱1B | 40.2 | 0 | 98.5% |
| Roads | 16 | ₱1.1B | 42.9 | 0 | 100.0% |
| Buildings and Facilities | 12 | ₱558.6M | 42.3 | 0 | 83.0% |
| OTHER | 1 | ₱148.4M | 79.5 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 25CG0033FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT BARANGAY CANDELARIA, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 64% | High risk80 | —-0.002 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 22O00080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Central Office | Flood Control Management Cluster | On-Going | ₱190.3M | 98% | High risk77 | —-0.010 |
| 24CC0180CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 65% | High risk76 | —-0.010 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 24CC0036CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PAGALA,BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.062 |
| 24CC0178CONSTRUCTION/IMPROVEMENT OF FLOOD MITIGATION STRUCTURE AT PANDUCOT, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 18C00045REHABILITATION OF PAMPANGA RIVER BASIN AT BARANGAY STA. CRUZ AND SAN NICOLAS, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱111.7M | 100% | High risk75 | —-0.057 |
| 19C00040FLOOD CONTROL WORKS-SLOPE PROTECTION WORKS ALONG STA. FE AND STA. FILOMENA ALONG GUAGUA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱96.9M | 100% | High risk75 | —-0.058 |
| 21O00097PASIG RIVER FERRY CONVERGENCE PROGRAM - PILOT CHANNELING AT LAGUNA LAKE (STA. 4+000 - STA. 4+950), PHASE III | Central Office | Flood Control Management Cluster | Completed | ₱142.2M | 100% | High risk75 | —-0.057 |
| 24CG0030NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES CONSTRUCTION (COMPLETION) OF APALIT COMMUNITY HOSPITAL, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱23.8M | 0% | High risk73 | —-0.006 |
| 17CH0078FLOOD CONTROL PROJECTS IN CENTRAL LUZON-FLOOD CONTROL WORKS IN PORAC-GUMAIN RIVER, LUBAO, SASMUAN AN | Central Office | Flood Control Management Cluster | Completed | ₱60.3M | 100% | High risk72 | —-0.072 |
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REPAIR / REHABILITATION OF CONCRETE SLOPE PROTECTION ALONG PAMPANGA RIVER, BRGY. SA | Region III | Pampanga 1st DEO | On-Going | ₱47.3M | 0% | High risk72 | Flagged0.047 |
| 24C00593FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONSTRUCTION OF RING DIKE WITH PUMPING STATION (PHASE 2 & 4), MACABEBE-MASANTOL, PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱354.4M | 0% | High risk80 | Flagged0.031 |
| 24CH0155REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SANTA INES SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 24CH0154REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BETIS RIVER, SAN MIGUEL SECTION, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.5M | 78% | High risk71 | Flagged0.023 |
| 17Z00020PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱652.3M | 99% | High risk77 | Flagged0.018 |
| 23CC0586CONSTRUCTION/REHABILITATION OF CONCRETE FLOOD CONTROL MITIGATION STRUCTURES AND IMPROVEMENT OF WATERWAYS AT BARANGAY STO. NIÑO (PACKAGE 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 24CC0522CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH PUMPING STATION AND FLOOD GATE AT BARANGAY CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.5M | 0% | High risk81 | Flagged0.007 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Central Office | Flood Control Management Cluster | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 25CG0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUIDLINGS / FACULTIES - REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER (PHASE I) AT BARANGAY CONSUELO, MACABEBE, | Region III | Pampanga 1st DEO | On-Going | ₱140.3M | 43% | High risk80 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20CC0213REPLACEMENT OF PERMANENT WEAK BRIDGES - TABANG BR. (B01989LZ) ALONG MANILA NORTH ROAD, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱33.3M | 100% | Medium risk32 | —-0.063 |
| 102 | 21CH0006FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION ALONG STA. URSULA CREEK, BARANGAY STA. URSULA, BETIS, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.092 |
| 103 | 23CC0274CONSTRUCTION OF RIVER PROTECTION ALONG ANGAT RIVER, K015+670 TO K015+820, PARULAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.092 |
| 104 | 18CH0132CONSTRUCTION OF ROAD, DALAN BETIS, SAN JUAN NEPOMUCENO, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱19.6M | 100% | Medium risk32 | —-0.105 |
| 105 | 23CC0197CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURES AND REHABILITATION F WATERWAYS AT BARANGAY SANTO NINO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 106 | 21CH0007FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION ALONG GUAGUA-PASAK RIVER PHASE II, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.9M | 100% | Medium risk32 | —-0.091 |
| 107 | 19CH0103CONSTRUCTION OF SLOPE PROTECTION ALONG SAPANG MARAGUL, SAN JUAN BAUTISTA TO SAN JUAN NEPOMUCENO, SAN JUAN BAUTISTA, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49.5M | 100% | Medium risk32 | —-0.089 |
| 108 | 21CH0012FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - IMPROVEMENT/REHABILITATION OF SLOPE PROTECTION ALONG GUAGUA-PASAK RIVER, SITIO FATIMA, BANCAL, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.091 |
| 109 | 18CH0102CONSTRUCTION OF SLOPE PROTECTION ALONG STA. URSULA CREEK, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 110 | 21CG0193LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL BRIDGES - CONSTRUCTION OF APALIT BRIDGE AND BY-PASS ROAD, BRGY. TABUYUC, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.6M | 100% | Medium risk32 | —-0.066 |
| 111 | 21CG0189LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROADS AND BRIDGES: LOCAL BRIDGES - CONSTRUCTION OF CAMBASI BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.6M | 100% | Medium risk31 | —-0.064 |
| 112 | 21CH0118BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - REPAIR/REHABILITATION OF A PERMANENT WEAK BRIGE MARIMLA BR. (B01530LZ) ALONG LUBAO DIVERSION ROAD, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱43.4M | 100% | Medium risk31 | —-0.062 |
| 113 | 18CC0372CONSTRUCTION OF FOUR STOREY TWENTY CLASSROOM - VIRGINIA RAMIREZ CRUZ HIGH SCHOOL (BUILDING 1) PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱41.7M | 100% | Medium risk31 | —-0.044 |
| 114 | 18CC0373CONSTRUCTION OF FOUR STOREY TWENTY CLASSROOM - VIRGINIA RAMIREZ CRUZ HIGH SCHOOL (BUILDING 2) PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱40.8M | 100% | Medium risk31 | —-0.044 |
| 115 | 23CG0021BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES - CANIPUAN BR. 1 (B01489LZ) ALONG BAHAY PARE - SAN LUIS - STO. DOMINGO RD. | Region III | Pampanga 1st DEO | Completed | ₱42.7M | 100% | Medium risk30 | —-0.064 |
| 116 | 19CG0197CONSTRUCTION OF BRIDGE AT SAN LORENZO, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37.2M | 100% | Medium risk30 | —-0.066 |
| 117 | 23CG0171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF SAN JUAN BRIDGE NO. 1 ALONG NINOY AQUINO BY-WAY, BARANGAY SAN JU | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk30 | —-0.062 |
| 118 | 18CC0047RIVER IMPROVEMENT IN BALIUAG, BULACAN ALONG ANGAT RIVER TIBAG-SABANG, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱26.6M | 100% | Low risk30 | —-0.094 |
| 119 | 19CG0054CONSTRUCTION/ REHABILITATION OF PAMPANGA RIVER BANK ALONG BRGY. CANSINALA, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.094 |
| 120 | 18CJ0027CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL (LEFT DIKE), BALAOANG SECTION, BALAOANG, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱33.5M | 100% | Low risk29 | —-0.087 |
| 121 | 19CG0031REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT SUCAD, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.094 |
| 122 | 18CJ0024CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, BRILLANTE-RANG-AYAN SECTION, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱30.7M | 100% | Low risk29 | —-0.087 |
| 123 | 18CJ0023CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, BRILLANTE SECTION, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱32.6M | 100% | Low risk29 | —-0.087 |
| 124 | 18CC0062CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS - ALONG ANGAT RIVER BASINS - CULIANIN-SAN JOSE SECTION PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱30.2M | 100% | Low risk29 | —-0.093 |
| 125 | 18CG0322CONSTRUCTION OF BRIDGE AT MALIWALU, BACOLOR, PAMPANGA (R.A. 9506-BACOLOR REHABILITATION ACT) | Region III | Pampanga 1st DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.066 |