Contractor dossier
624 projects on file, including joint ventures this contractor is part of.
Total projects
624
Total budget
₱28.3B
Average progress
97.4%
Completion rate
85.6%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
44
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| Region XII | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| Region VIII | 101 | ₱2.3B | 52.1 | 22 | 88.4% |
| Region IX | 52 | ₱2.6B | 54.6 | 3 | 99.3% |
| Region XIII | 45 | ₱2.3B | 44.7 | 1 | 100.0% |
| Region X | 39 | ₱2.4B | 50.6 | 2 | 98.3% |
| Region IV-B | 13 | ₱942.3M | 49.8 | 0 | 100.0% |
| Region VII | 10 | ₱204.1M | 42.2 | 0 | 96.5% |
| Region VI | 6 | ₱251.5M | 51.2 | 0 | 100.0% |
| National Capital Region | 6 | ₱159.3M | 43.4 | 0 | 100.0% |
| Negros Island Region | 4 | ₱266.3M | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 200 | ₱11.5B | 46.6 | 5 | 99.2% |
| Buildings and Facilities | 155 | ₱3.8B | 33.2 | 8 | 97.7% |
| Flood Control and Drainage | 135 | ₱7.4B | 46.1 | 1 | 98.7% |
| Bridges | 72 | ₱2.1B | 39.5 | 2 | 97.4% |
| OTHER | 36 | ₱2.2B | 77.4 | 21 | 86.4% |
| Water Provision and Storage | 13 | ₱513.1M | 44.6 | 1 | 94.9% |
| GAA 2025 SSP | 6 | ₱154.7M | 91.9 | 5 | 76.6% |
| Bridges, Roads | 6 | ₱520M | 52.4 | 1 | 95.3% |
| GAA 2025 OO-2 | 1 | ₱14.5M | 85.7 | 0 | 71.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 25IN0060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MANLICO ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO D | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱6.7M | 96% | High risk95 | Flagged0.009 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 25IN0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ILAYA, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 91% | High risk91 | Flagged0.010 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 25MG0049CONSTRUCTION OF RIVERBANK PROTECTION ALONG B'LOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱43.2M | 100% | High risk84 | —-0.018 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 17J00004ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN-BAYOG-LAKEWOOD ROAD ZAMBOANGA DEL NORTE (ZDN - 1ST DEO) CHAINAGE 7599 - CHAINAGE 9881 (STA. 1936 + 440.00 TO STA. 1938 + 722.00) (NET LENGTH: 2,282.00 LN.M.) | Region IX | Region IX | Completed | ₱143.5M | 100% | High risk82 | —-0.002 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 24I00213CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. NUEVA ESPERANZA ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 85% | High risk80 | Flagged0.004 |
| 24I00224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. NIÑO 1 - SALVACION (SITIO DAGMOL) ROAD, | Region VIII | Region VIII | On-Going | ₱9.9M | 68% | High risk80 | Flagged0.010 |
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 23I00159CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 99% | High risk80 | Flagged0.007 |
| 24I00227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. CENTRAL TO BRGY. GABI ROAD, SAN FRANCISCO, S | Region VIII | Region VIII | On-Going | ₱19.8M | 68% | High risk80 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 18JH0037CONSTRUCTION OF 3-STOREY 15-CL SCHOOL BUILDING AT ISABELA EAST CENTRAL ELEMENTARY SCHOOL | Region IX | Isabela City DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.032 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 24ME0122CONSTRUCTION OF MAASIM LEVEL III WATER SUPPLY, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱32.9M | 60% | High risk73 | Flagged0.020 |
| 21I00079CONSTRUCTION OF EVACUATION CENTER, BARANGAY GUIBUANGAN, CATUBIG, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.8M | 100% | High risk77 | Flagged0.019 |
| 16ME0183CONST. OF (2) UNITS, (4) STOREY, (16) CL BLDG., LEONARD YOUNG SR. NHS, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱60.8M | 100% | Low risk24 | Flagged0.019 |
| 19L00062CONSTRUCTION OF CONCRETE ROAD-BOLILA-KIBALATONG-BITO-MANA DIVERSION ROAD, PACKAGE 3,DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱169.6M | 100% | High risk79 | Flagged0.015 |
| 18L00122DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, INCL. ROW, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱150.7M | 100% | High risk66 | Flagged0.014 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 24I00320CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE - MILAGROSO ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 48% | High risk79 | Flagged0.013 |
| 22L00130CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | Region XI | On-Going | ₱142.4M | 63% | High risk65 | Flagged0.013 |
| 23M00176WIDENING OF PERMANENT BRIDGES - SARAKAN BRIDGE ALONG COTABATO-LANAO RD, K1897+895, - K1897+933, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱48.2M | 17% | Low risk27 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 20LE0052OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, UPPER TIBULOG, MALITA, DAVAO OCCIDENTAL (S00203MN) (K1658+700 - K1659+480) | Region XI | Davao Occidental DEO | Completed | ₱22.9M | 100% | Medium risk46 | —-0.090 |
| 327 | 18LG0056CONSTRUCTION / REHABILITATION OF MULTI - PURPOSE BUILDINGS, BANAYBANAY , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.086 |
| 328 | 19LB0031CONSTRUCTION OF REVETMENT-DAVAO RIVER,BOLTON BRIDGE UPSTREAM SECTION,STA.1+567-STA. 1+830, RIGHT BANK, BRGY.76 DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.067 |
| 329 | 20LG0026ROAD JUNCTION TO PRRD TO PUROK 3, BRGY. MAGSAYSAY CONNECTING LUPON PUBLIC TERMINAL AND BANANA AND CACAO PROCESSING SITES IN SUPPORT OF AGRIBUSINESS : BANANA AND CACAO INDUSTRIES , LUPON , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱7.5M | 100% | Medium risk46 | —-0.080 |
| 330 | 19LG0064CONCRETING OF POBLACION TO PUROK MOLAVE ROAD, BRGY. POBLACION, BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱7.3M | 100% | Medium risk46 | —-0.083 |
| 331 | 21LC0199CONSTRUCTION OF EARTHDIKE ALONG SADPUDON CREEK, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱48.3M | 100% | Medium risk46 | —-0.074 |
| 332 | 19LE0087CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS AT BRGY. PANGYAN ROAD LEADING TO TUDAYA FALLS, BRGY. PANGYAN, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.090 |
| 333 | 19LB0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-MATINA RIVER FLOOD MITIGATION STRUCTURE, LOPEZ BRIDGE SECTION, BRGY. MATINA CROSSING, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.067 |
| 334 | 18LB0029INSTALLATION OF GABIONS AND MATTRESSES ALONG MATINA RIVER, KADAYAWAN SECTION,BRGY. TALOMO, DAVAO CIT | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.071 |
| 335 | 20OE0105BANK IMPROVEMENT (STEEL SHEET PILES) ALONG ESTERO DE KABULUSAN, YUSECO / RAXABAGO SECTION PHASE I, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱30.8M | 100% | Medium risk46 | —-0.088 |
| 336 | 20OE0104BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE KABULUSAN, YUSECO / RAXABAGO SECTION, PHASE II, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱30.3M | 100% | Medium risk46 | —-0.088 |
| 337 | 18KI0012WIDENING OF PERMANENT BRIDGE - SIBUGON BR. (B01104MN) ALONG OROQUIETA CITY - PLARIDEL - CALAMBA - SAPANG DALAGA ROAD | Region X | Misamis Occidental 1st DEO | Completed | ₱27.2M | 100% | Medium risk46 | —-0.053 |
| 338 | 18KI0013WIDENING OF PERMANENT BRIDGE, SOLSOLON BR. (B01105MN) ALONG OROQUIETA CITY - PLARIDEL - CALAMBA - SAPANG DALAGA ROAD, LOPEZ JAENA, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 1st DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.054 |
| 339 | 20NG0005ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, DAANG MAHARLIKA (LIPATA-SURIGAO SECT.) - K1116+564 - K1116+620/ SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱55.5M | 100% | Medium risk46 | —-0.088 |
| 340 | 18LG0007CONSTRUCTION OF CONCRETE REVETMENT, SUROP RIVER, GOV. GENEROSO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.064 |
| 341 | 20LG0036NHJ SAN VICENTE TO BRGY. SAN VICENTE CONNECTING BANAYBANAY PUBLIC TERMINAL AND BANANA , CORN , AND RICE PROCESSING SITES IN SUPPORT OF AGRIBUSINESS: BANANA, CORN AND RICE INDUSTRIES, BANAYBANAY, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.078 |
| 342 | 19LC0057CONSTRUCTION OF CONCRETE ROAD-JCT. TAGUM- PANABO CIRCUM. ROAD TO FD RD 5 ROAD LEADING TO VARIOUS TOURISM SITES, BRGY. SAN JOSE, STO. TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱14.5M | 100% | Medium risk46 | —-0.091 |
| 343 | 24HH0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY HIPODROMO, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.055 |
| 344 | 18KL0055WIDENING OF PERMANENT BRIDGES-VILLANUEVA BRIDGE(B01113MN) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIG | Region X | Misamis Oriental 2nd DEO | Completed | ₱18.2M | 100% | Medium risk46 | —-0.062 |
| 345 | 18M00062CONSTRUCTION OF CONCRETE ROAD- CONCRETING OF ROAD, BRGY. MALANGIT TO KABULING ROAD, PANDAG, MAGUINDANAO LINKING TO TACURONG - DAVAO ROAD, K1659+294-K1662+972 | Region XII | Region XII | Completed | ₱138.8M | 100% | Medium risk46 | —-0.035 |
| 346 | 18KG0010FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PROJECT 1) ALONG BUTADON RIVER, (UPSTREAM (RS), STA. 0 + 000 - STA. 0+295), BRGY. BUTADON, KAPATAGAN, LANAO DEL NORTE. | Region X | Lanao del Norte 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.081 |
| 347 | 22KG0083BASIC INFRASTRUCTURE PROJECT (BIP) - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF BALO-I WATER SYSTEM - LEVEL II, BALO-I, LANAO DEL NORTE | Region X | Lanao del Norte 2nd DEO | Completed | ₱44.5M | 100% | Medium risk46 | —-0.050 |
| 348 | 18KG0011FLOOD MANAGEMENT PROGRAM - CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PROJECT 2) ALONG BUTADON RIVER, (UPSTREAM (LS), STA. 0 + 000 - STA. 0+293), BRGY. BUTADON, KAPATAGAN, LANAO DEL NORTE. | Region X | Lanao del Norte 2nd DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.081 |
| 349 | 23KA0144CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG SAYRE HIGHWAY AT BRGY. MAILAG VALENCIA CITY BUKIDNONBRGY. MAILAG, VALENCIA CITY, BUKIDNON, 4TH LD | Region X | Bukidnon 1st DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.091 |
| 350 | 18OE0030ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGSINST MAJOR FLOOD CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF RIVERWALL, ESTERO DE MAYPAJO, STA. 1+640.44 TO STA. 1+706.84, MANILA CITY, TONDO, MANI | National Capital Region | North Manila DEO | Completed | ₱23.2M | 100% | Medium risk46 | —-0.089 |