Contractor dossier
624 projects on file, including joint ventures this contractor is part of.
Total projects
624
Total budget
₱28.3B
Average progress
97.4%
Completion rate
85.6%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
44
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| Region XII | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| Region VIII | 101 | ₱2.3B | 52.1 | 22 | 88.4% |
| Region IX | 52 | ₱2.6B | 54.6 | 3 | 99.3% |
| Region XIII | 45 | ₱2.3B | 44.7 | 1 | 100.0% |
| Region X | 39 | ₱2.4B | 50.6 | 2 | 98.3% |
| Region IV-B | 13 | ₱942.3M | 49.8 | 0 | 100.0% |
| Region VII | 10 | ₱204.1M | 42.2 | 0 | 96.5% |
| Region VI | 6 | ₱251.5M | 51.2 | 0 | 100.0% |
| National Capital Region | 6 | ₱159.3M | 43.4 | 0 | 100.0% |
| Negros Island Region | 4 | ₱266.3M | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 200 | ₱11.5B | 46.6 | 5 | 99.2% |
| Buildings and Facilities | 155 | ₱3.8B | 33.2 | 8 | 97.7% |
| Flood Control and Drainage | 135 | ₱7.4B | 46.1 | 1 | 98.7% |
| Bridges | 72 | ₱2.1B | 39.5 | 2 | 97.4% |
| OTHER | 36 | ₱2.2B | 77.4 | 21 | 86.4% |
| Water Provision and Storage | 13 | ₱513.1M | 44.6 | 1 | 94.9% |
| GAA 2025 SSP | 6 | ₱154.7M | 91.9 | 5 | 76.6% |
| Bridges, Roads | 6 | ₱520M | 52.4 | 1 | 95.3% |
| GAA 2025 OO-2 | 1 | ₱14.5M | 85.7 | 0 | 71.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 25IN0060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MANLICO ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO D | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱6.7M | 96% | High risk95 | Flagged0.009 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 25IN0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ILAYA, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 91% | High risk91 | Flagged0.010 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 25MG0049CONSTRUCTION OF RIVERBANK PROTECTION ALONG B'LOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱43.2M | 100% | High risk84 | —-0.018 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 17J00004ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN-BAYOG-LAKEWOOD ROAD ZAMBOANGA DEL NORTE (ZDN - 1ST DEO) CHAINAGE 7599 - CHAINAGE 9881 (STA. 1936 + 440.00 TO STA. 1938 + 722.00) (NET LENGTH: 2,282.00 LN.M.) | Region IX | Region IX | Completed | ₱143.5M | 100% | High risk82 | —-0.002 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 24I00213CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. NUEVA ESPERANZA ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 85% | High risk80 | Flagged0.004 |
| 24I00224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. NIÑO 1 - SALVACION (SITIO DAGMOL) ROAD, | Region VIII | Region VIII | On-Going | ₱9.9M | 68% | High risk80 | Flagged0.010 |
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 23I00159CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 99% | High risk80 | Flagged0.007 |
| 24I00227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. CENTRAL TO BRGY. GABI ROAD, SAN FRANCISCO, S | Region VIII | Region VIII | On-Going | ₱19.8M | 68% | High risk80 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 18JH0037CONSTRUCTION OF 3-STOREY 15-CL SCHOOL BUILDING AT ISABELA EAST CENTRAL ELEMENTARY SCHOOL | Region IX | Isabela City DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.032 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 24ME0122CONSTRUCTION OF MAASIM LEVEL III WATER SUPPLY, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱32.9M | 60% | High risk73 | Flagged0.020 |
| 21I00079CONSTRUCTION OF EVACUATION CENTER, BARANGAY GUIBUANGAN, CATUBIG, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.8M | 100% | High risk77 | Flagged0.019 |
| 16ME0183CONST. OF (2) UNITS, (4) STOREY, (16) CL BLDG., LEONARD YOUNG SR. NHS, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱60.8M | 100% | Low risk24 | Flagged0.019 |
| 19L00062CONSTRUCTION OF CONCRETE ROAD-BOLILA-KIBALATONG-BITO-MANA DIVERSION ROAD, PACKAGE 3,DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱169.6M | 100% | High risk79 | Flagged0.015 |
| 18L00122DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, INCL. ROW, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱150.7M | 100% | High risk66 | Flagged0.014 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 24I00320CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE - MILAGROSO ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 48% | High risk79 | Flagged0.013 |
| 22L00130CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | Region XI | On-Going | ₱142.4M | 63% | High risk65 | Flagged0.013 |
| 23M00176WIDENING OF PERMANENT BRIDGES - SARAKAN BRIDGE ALONG COTABATO-LANAO RD, K1897+895, - K1897+933, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱48.2M | 17% | Low risk27 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 18OE0049ORGANIZATIONAL OUTCOME 2: PROJECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE VITAS STA. 0+460.00 TO STA. 0+5 | National Capital Region | North Manila DEO | Completed | ₱23.2M | 100% | Medium risk46 | —-0.089 |
| 352 | 18M00063CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD IN SALIPADA SK PENDATUN TO SULTAN SA BARONGIS JUNCTION, SK PENDATUN MAGUINDANAO LINKING TO TACURONG-DAVAO ROAD, K1683+600-K1687+960 | Region XII | Region XII | Completed | ₱138.9M | 100% | Medium risk46 | —-0.036 |
| 353 | 18NE0017COMPLETION OF SPECIALTY HOSPITAL, BASILISA, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱74.2M | 100% | Medium risk46 | —-0.027 |
| 354 | 17L00194CONSTRUCTION OF EVACUATION CENTER, BRGY. CORPORATION, LUPON, DAVAO ORIENTAL | Region XI | Region XI | Completed | ₱34.7M | 100% | Medium risk46 | —-0.047 |
| 355 | 18LG0004CONSTRUCTION OF CONCRETE ROAD- NHJ TO SITIO PANGYAN, BRGY. DON MARIANO MARCOS LEADING TO PANGYAN FALLS, BRGY. DON MARIANO MARCOS, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱11.8M | 100% | Medium risk46 | —-0.079 |
| 356 | 20NC0036CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN FRANCISCO (NRJ) HUBANG-STA. ANA-SAN ISIDRO) BY PASS ROAD (DAANG MAHARLIKA ALTERNATIVE ROUTE) AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱95.5M | 100% | Medium risk46 | —-0.069 |
| 357 | 18LD0039CONSTRUCTION OF SPAMAST RIVER CONTROL PROTECTION (ALONG MATTI RIVER), BRGY. MATTI, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.076 |
| 358 | 20LB0204CONSTRUCTION OF ROAD, BRGY. MATINA APLAYA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.092 |
| 359 | 18LA0349CONSTRUCTION OF ONE (1) UNIT, THREE (3) STOREY, FIFTEEN (15) CLASSROOM BUILDING AT MONTEVISTA CES, MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱50.4M | 100% | Medium risk45 | —-0.027 |
| 360 | 17M00055ROAD WIDENING OF COTABATO-ALLAH VALLEY-MARBEL ROAD (META-BRAR SECTION), K1800+266-K1801+480; K1801+660-K1804+546, DATU UNSAY, MAGUINDANAO. | Region XII | Region XII | Completed | ₱101.6M | 100% | Medium risk45 | —-0.043 |
| 361 | 19E00061CONST./REPAIR/REHAB. OF FLOOD/RIVER CONTROL & DRAINAGE PROJECTS, PARPAGOHA REVETMENT, STA. 0+000.00 - STA. 0+297.00, TABLAS ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱49.2M | 100% | Medium risk45 | —-0.017 |
| 362 | 17K00070IMPRVT./WIDENING OF NATL ROADS GINGOOG-CLAVERIA-VILLANUEVA RD-K1335+000-K1337+509,K1338+000-K1340+60 | Region X | Region X | Completed | ₱76.5M | 100% | Medium risk45 | —-0.044 |
| 363 | 20LG0030CONSTRUCTION OF MULTIPURPOSE BUILDINGS, MUNICIPALITY OF LUPON , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱5.9M | 100% | Medium risk45 | —-0.086 |
| 364 | 17LE0015MFO 1: NATIONAL ROAD NETWORK SERVICES - NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE- TERTIARY ROADS - H-WAY JCT. MANA-TICULON-LAGUMIT-LITTLE BAGUIO ROADS, MALITA, DAVAO OCCIDENTAL LONE DISTRICTSECT. A: KM. 1648 + 478 - KM. 16 | Region XI | Davao Occidental DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.052 |
| 365 | 20LD0034CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS BRIDGE 2, COGON SECTION, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱25.5M | 100% | Medium risk45 | —-0.077 |
| 366 | 17NI0012REHAB./RECONS./UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGT. SYSTEM/ HIGHWAY DEV'T. MGT.-4(HDM-4) - SECONDARY ROADS,SURIGAO-DAVAO COASTAL RD, K1471+ 403- K1471+ 566, K1481+297- K1481+ 979, K1497+076-K1497+431, K1501+972 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱36.4M | 100% | Medium risk45 | —-0.039 |
| 367 | 20LA0196CONCRETING OF SALVACION ROAD, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱9.5M | 100% | Medium risk45 | —-0.089 |
| 368 | 19KC0017CONSTRUCTION OF WATER SUPPLY SYSTEMS- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF LEVEL III WATER SUPPLY SYSTEM, BAUNGON, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱44.1M | 100% | Medium risk45 | —-0.057 |
| 369 | 19LE0068CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), LAMIDAN FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL STA.0+520 - STA.0+820 (LEFT BANK), STA.0+520 - STA.0+820 (RIGHT BANK) | Region XI | Davao Occidental DEO | Completed | ₱29.3M | 100% | Medium risk45 | —-0.086 |
| 370 | 19LE0080CONSTRUCTION OF CONCRETE REVETMENT, SITIO BANKEROHAN FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱19.5M | 100% | Medium risk45 | —-0.073 |
| 371 | 18GB0106CONSTRUCTION OF BYPASS ROAD: BADIANG-MOJON-IGBONGLO BYPASS ROAD INCL. ROW | Region VI | Antique DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.083 |
| 372 | 20LG0047CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MATI CITY, PACKAGE 1, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱38.6M | 100% | Medium risk45 | —-0.065 |
| 373 | 18M00064CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD IN BRGY. MASLABENG, BULUAN, MAGUINDANAO TO BRGY. TALITAY, BULUAN MAGUINDANAO LINKING TO TACURONG DAVAO ROAD, STA 0+000-STA 2+420 | Region XII | Region XII | Completed | ₱92.6M | 100% | Medium risk45 | —-0.045 |
| 374 | 23I00178CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING, ANISLAGON PRIMARY SCHOOL, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱23.8M | 87% | Medium risk45 | —-0.001 |
| 375 | 18GG0052CONCRETING OF BUNGCA - SOHOTON ROAD LEADING TO MT. SALIHID SHRINE, BAROTAC NUEVO, ILOILO, STA. 000 + 098 - STA. 002 + 014 | Region VI | Iloilo 2nd DEO | Completed | ₱27.8M | 100% | Medium risk45 | —-0.086 |