Contractor dossier
624 projects on file, including joint ventures this contractor is part of.
Total projects
624
Total budget
₱28.3B
Average progress
97.4%
Completion rate
85.6%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
44
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| Region XII | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| Region VIII | 101 | ₱2.3B | 52.1 | 22 | 88.4% |
| Region IX | 52 | ₱2.6B | 54.6 | 3 | 99.3% |
| Region XIII | 45 | ₱2.3B | 44.7 | 1 | 100.0% |
| Region X | 39 | ₱2.4B | 50.6 | 2 | 98.3% |
| Region IV-B | 13 | ₱942.3M | 49.8 | 0 | 100.0% |
| Region VII | 10 | ₱204.1M | 42.2 | 0 | 96.5% |
| Region VI | 6 | ₱251.5M | 51.2 | 0 | 100.0% |
| National Capital Region | 6 | ₱159.3M | 43.4 | 0 | 100.0% |
| Negros Island Region | 4 | ₱266.3M | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 200 | ₱11.5B | 46.6 | 5 | 99.2% |
| Buildings and Facilities | 155 | ₱3.8B | 33.2 | 8 | 97.7% |
| Flood Control and Drainage | 135 | ₱7.4B | 46.1 | 1 | 98.7% |
| Bridges | 72 | ₱2.1B | 39.5 | 2 | 97.4% |
| OTHER | 36 | ₱2.2B | 77.4 | 21 | 86.4% |
| Water Provision and Storage | 13 | ₱513.1M | 44.6 | 1 | 94.9% |
| GAA 2025 SSP | 6 | ₱154.7M | 91.9 | 5 | 76.6% |
| Bridges, Roads | 6 | ₱520M | 52.4 | 1 | 95.3% |
| GAA 2025 OO-2 | 1 | ₱14.5M | 85.7 | 0 | 71.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 25IN0060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MANLICO ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO D | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱6.7M | 96% | High risk95 | Flagged0.009 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 25IN0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ILAYA, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 91% | High risk91 | Flagged0.010 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 25MG0049CONSTRUCTION OF RIVERBANK PROTECTION ALONG B'LOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱43.2M | 100% | High risk84 | —-0.018 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 17J00004ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN-BAYOG-LAKEWOOD ROAD ZAMBOANGA DEL NORTE (ZDN - 1ST DEO) CHAINAGE 7599 - CHAINAGE 9881 (STA. 1936 + 440.00 TO STA. 1938 + 722.00) (NET LENGTH: 2,282.00 LN.M.) | Region IX | Region IX | Completed | ₱143.5M | 100% | High risk82 | —-0.002 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 24I00213CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. NUEVA ESPERANZA ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 85% | High risk80 | Flagged0.004 |
| 24I00224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. NIÑO 1 - SALVACION (SITIO DAGMOL) ROAD, | Region VIII | Region VIII | On-Going | ₱9.9M | 68% | High risk80 | Flagged0.010 |
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 23I00159CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 99% | High risk80 | Flagged0.007 |
| 24I00227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. CENTRAL TO BRGY. GABI ROAD, SAN FRANCISCO, S | Region VIII | Region VIII | On-Going | ₱19.8M | 68% | High risk80 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 18JH0037CONSTRUCTION OF 3-STOREY 15-CL SCHOOL BUILDING AT ISABELA EAST CENTRAL ELEMENTARY SCHOOL | Region IX | Isabela City DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.032 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 24ME0122CONSTRUCTION OF MAASIM LEVEL III WATER SUPPLY, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱32.9M | 60% | High risk73 | Flagged0.020 |
| 21I00079CONSTRUCTION OF EVACUATION CENTER, BARANGAY GUIBUANGAN, CATUBIG, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.8M | 100% | High risk77 | Flagged0.019 |
| 16ME0183CONST. OF (2) UNITS, (4) STOREY, (16) CL BLDG., LEONARD YOUNG SR. NHS, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱60.8M | 100% | Low risk24 | Flagged0.019 |
| 19L00062CONSTRUCTION OF CONCRETE ROAD-BOLILA-KIBALATONG-BITO-MANA DIVERSION ROAD, PACKAGE 3,DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱169.6M | 100% | High risk79 | Flagged0.015 |
| 18L00122DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, INCL. ROW, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱150.7M | 100% | High risk66 | Flagged0.014 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 24I00320CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE - MILAGROSO ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 48% | High risk79 | Flagged0.013 |
| 22L00130CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | Region XI | On-Going | ₱142.4M | 63% | High risk65 | Flagged0.013 |
| 23M00176WIDENING OF PERMANENT BRIDGES - SARAKAN BRIDGE ALONG COTABATO-LANAO RD, K1897+895, - K1897+933, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱48.2M | 17% | Low risk27 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 18M00065CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD, BRGY. MALANGIT, PANDAG, MAGUINDANAO TO BRGY. PIDTUBO, PRESIDENT QUIRINO, SULTAN KUDARAT LINKING TO TACURONG-DAVAO ROAD, K1660+304-K1663+554 | Region XII | Region XII | Completed | ₱92.6M | 100% | Medium risk45 | —-0.045 |
| 377 | 17LE0012MFO 1: NATIONAL ROAD NETWORK SERVICES - ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - DEMOLOC- LITTLE BAGUIO- ALABEL ROAD, MALITA, DAVAO OCCIDENTAL LONE DISTRICTSECT. | Region XI | Davao Occidental DEO | Completed | ₱34M | 100% | Medium risk45 | —-0.055 |
| 378 | 21HI0019CONSTRUCTION OF CONCRETE ROAD BARANGAY ROAD ALONG SUBA IN SUPPORT OF MITSUMI AND REPUBLIC CEMENT, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱9.3M | 100% | Medium risk45 | —-0.081 |
| 379 | 20LG0040CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MAYO RIVER , MATI , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱10.1M | 100% | Medium risk45 | —-0.064 |
| 380 | 17NH0107ADDITIONAL PAVEMENT WIDTH & LINED CANAL ALONG SDCR (NORTHERN BOUNDARY-ADLAY SECTION) K1206+(-988) TO K1219+000 | Region XIII | Surigao del Sur 1st DEO | Completed | ₱24.2M | 100% | Medium risk45 | —-0.001 |
| 381 | 18EB0112FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF BUSUANGA RIVER FLOOD CONTROL STRUCTURES (ADELA SECTION), RIZAL, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱52.4M | 100% | Medium risk45 | —-0.041 |
| 382 | 20N00003ROSARIO - MARFIL - TAGBINA RD, (ROSARIO SECTION), PACKAGE C, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱115.8M | 100% | Medium risk45 | —-0.067 |
| 383 | 20LG0020CONSTRUCTION OF FLOOD MITIGATION STRUCTURE , SUROP , GOVERNOR GENEROSO , DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱19.1M | 100% | Medium risk45 | —-0.063 |
| 384 | 17NC0031CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG DAANG MAHARLIKA (AGUSAN-DAVAO ROAD) (S00439MN), K1351+240.00-K1351+900.00, BUNAWAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱46.1M | 100% | Medium risk45 | —-0.042 |
| 385 | 17LE0064MFO 1: NATIONAL ROAD NETWORK SERVICES - ASSET PRESERVATION OF NATIONAL ROADS- CONST. / UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS, DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, MALITA, DAVAO OCCIDENTAL LONE DISTRICTKM. 1637 (+-) | Region XI | Davao Occidental DEO | Completed | ₱16.7M | 100% | Medium risk45 | —-0.054 |
| 386 | 18KG0019FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, DREDGING/CONSTRUCTION OF FLOOD CONTROL ALONG BAUYAN RIVER, STA. 0+000-STA. 0+200, SULTAN NAGA DIMAPORO, LANAO DEL NORTE. | Region X | Lanao del Norte 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.082 |
| 387 | 19LE0040CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), SANGHAY FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL (SECT. A STA. 0+000 - STA. 0+260 BOTH SIDES, SECT. B STA. 0+060 - STA. 0+312 RIGHT SIDE) | Region XI | Davao Occidental DEO | Completed | ₱37.3M | 100% | Medium risk45 | —-0.075 |
| 388 | 18NF0033CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM ALONG SURIGAO RIVER/BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE, STA.0+000 - STA.0+690.00 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱67.5M | 100% | Medium risk44 | —-0.067 |
| 389 | 20KE0050REHABILITATION OF VARIOUS WATER WORKS SYSTEMS CAMIGUIN | Region X | Camiguin DEO | Completed | ₱37.3M | 100% | Medium risk44 | —-0.056 |
| 390 | 19LE0042CONSTRUCTION OF CONCRETE REVETMENT (RC CUT - OFF WALL), PANGIAN FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL (STA. 1+200 - STA. 0+580) | Region XI | Davao Occidental DEO | Completed | ₱41.6M | 100% | Medium risk44 | —-0.075 |
| 391 | 18LG0008CONSTRUCTION OF CONCRETE REVETMENT, CALAPAGAN RIVER, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱29.2M | 100% | Medium risk44 | —-0.067 |
| 392 | 22KL0046REHABILITATION OF JASAAN WATER WORKS IN JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.055 |
| 393 | 22KL0047CONSTRUCTION OF WATER SYSTEM PROJECT, VILLANUEVA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱39.2M | 100% | Medium risk44 | —-0.056 |
| 394 | 18MB0040CONCRETING OF JUNCTION NATIONAL HIGHWAY-JACINTO-TUCALABONG-CEBUANO ROAD, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱35.3M | 100% | Medium risk44 | —-0.053 |
| 395 | 17K00004OFF CARRIAGEWAY IMPRVT.INCLUDING DRAINAGE,KAPALONG-TALAINGOD-VALENCIA(BUK)RD-K1575+096-K1580+037,BUK | Region X | Region X | Completed | ₱58.8M | 100% | Medium risk44 | —-0.062 |
| 396 | 18JD0083CONCRETING OF BRGY. TERESITA-BAGONG SILANG FMR, BRGY. TERESITA AND BRGY. BAGONG SILANG, PIÑAN, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.037 |
| 397 | 19LE0089CONSTRUCTION OF CONCRETE REVETMENT, LAWA FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱33.9M | 100% | Medium risk44 | —-0.070 |
| 398 | 20LA0163CONSTRUCTION OF REVETMENT ALONG HIJO RIVER, BRGY. MALAMODAO, MACO COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱33.3M | 100% | Medium risk44 | —-0.071 |
| 399 | 20LA0162CONSTRUCTION OF REVETMENT ALONG HIJO RIVER, BRGY. NUEVA VISAYAS, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.072 |
| 400 | 20KC0066CONSTRUCTION OF WATER SYSTEM, MINDANAO ARMY TRAINING GROUP, TRADOC, PA, KIBARITAN MILITARY RESERVATION, BRGY. MALINAO, KALILANGAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱11.8M | 100% | Medium risk44 | —-0.096 |