Contractor dossier
624 projects on file, including joint ventures this contractor is part of.
Total projects
624
Total budget
₱28.3B
Average progress
97.4%
Completion rate
85.6%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
44
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| Region XII | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| Region VIII | 101 | ₱2.3B | 52.1 | 22 | 88.4% |
| Region IX | 52 | ₱2.6B | 54.6 | 3 | 99.3% |
| Region XIII | 45 | ₱2.3B | 44.7 | 1 | 100.0% |
| Region X | 39 | ₱2.4B | 50.6 | 2 | 98.3% |
| Region IV-B | 13 | ₱942.3M | 49.8 | 0 | 100.0% |
| Region VII | 10 | ₱204.1M | 42.2 | 0 | 96.5% |
| Region VI | 6 | ₱251.5M | 51.2 | 0 | 100.0% |
| National Capital Region | 6 | ₱159.3M | 43.4 | 0 | 100.0% |
| Negros Island Region | 4 | ₱266.3M | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 200 | ₱11.5B | 46.6 | 5 | 99.2% |
| Buildings and Facilities | 155 | ₱3.8B | 33.2 | 8 | 97.7% |
| Flood Control and Drainage | 135 | ₱7.4B | 46.1 | 1 | 98.7% |
| Bridges | 72 | ₱2.1B | 39.5 | 2 | 97.4% |
| OTHER | 36 | ₱2.2B | 77.4 | 21 | 86.4% |
| Water Provision and Storage | 13 | ₱513.1M | 44.6 | 1 | 94.9% |
| GAA 2025 SSP | 6 | ₱154.7M | 91.9 | 5 | 76.6% |
| Bridges, Roads | 6 | ₱520M | 52.4 | 1 | 95.3% |
| GAA 2025 OO-2 | 1 | ₱14.5M | 85.7 | 0 | 71.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 25IN0060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MANLICO ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO D | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱6.7M | 96% | High risk95 | Flagged0.009 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 25IN0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ILAYA, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 91% | High risk91 | Flagged0.010 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 25MG0049CONSTRUCTION OF RIVERBANK PROTECTION ALONG B'LOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱43.2M | 100% | High risk84 | —-0.018 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 17J00004ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN-BAYOG-LAKEWOOD ROAD ZAMBOANGA DEL NORTE (ZDN - 1ST DEO) CHAINAGE 7599 - CHAINAGE 9881 (STA. 1936 + 440.00 TO STA. 1938 + 722.00) (NET LENGTH: 2,282.00 LN.M.) | Region IX | Region IX | Completed | ₱143.5M | 100% | High risk82 | —-0.002 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 24I00213CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. NUEVA ESPERANZA ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 85% | High risk80 | Flagged0.004 |
| 24I00224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. NIÑO 1 - SALVACION (SITIO DAGMOL) ROAD, | Region VIII | Region VIII | On-Going | ₱9.9M | 68% | High risk80 | Flagged0.010 |
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 23I00159CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 99% | High risk80 | Flagged0.007 |
| 24I00227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. CENTRAL TO BRGY. GABI ROAD, SAN FRANCISCO, S | Region VIII | Region VIII | On-Going | ₱19.8M | 68% | High risk80 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 18JH0037CONSTRUCTION OF 3-STOREY 15-CL SCHOOL BUILDING AT ISABELA EAST CENTRAL ELEMENTARY SCHOOL | Region IX | Isabela City DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.032 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 24ME0122CONSTRUCTION OF MAASIM LEVEL III WATER SUPPLY, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱32.9M | 60% | High risk73 | Flagged0.020 |
| 21I00079CONSTRUCTION OF EVACUATION CENTER, BARANGAY GUIBUANGAN, CATUBIG, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.8M | 100% | High risk77 | Flagged0.019 |
| 16ME0183CONST. OF (2) UNITS, (4) STOREY, (16) CL BLDG., LEONARD YOUNG SR. NHS, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱60.8M | 100% | Low risk24 | Flagged0.019 |
| 19L00062CONSTRUCTION OF CONCRETE ROAD-BOLILA-KIBALATONG-BITO-MANA DIVERSION ROAD, PACKAGE 3,DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱169.6M | 100% | High risk79 | Flagged0.015 |
| 18L00122DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, INCL. ROW, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱150.7M | 100% | High risk66 | Flagged0.014 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 24I00320CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE - MILAGROSO ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 48% | High risk79 | Flagged0.013 |
| 22L00130CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | Region XI | On-Going | ₱142.4M | 63% | High risk65 | Flagged0.013 |
| 23M00176WIDENING OF PERMANENT BRIDGES - SARAKAN BRIDGE ALONG COTABATO-LANAO RD, K1897+895, - K1897+933, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱48.2M | 17% | Low risk27 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 426 | 18NC0058WIDENING OF ALEGRIA BRIDGE (B00786MN) ALONG NRJ SAN FRANCISCO-BAHI-BAROBO ROAD K1312+086 - K1312+110.95, SAN FRANCISCO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱24.5M | 100% | Medium risk41 | —-0.036 |
| 427 | 19NH0009NRJ-CAGWAIT ROAD LEADING WHITE BEACH RESORT, CAGWAIT, SURIGAO DEL SUR (NEW BRIDGE CONSTRUCTION), CAGWAIT, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱35.9M | 100% | Medium risk40 | —-0.036 |
| 428 | 18MB0050WIDENING OF PERMANENT BRIDGES AT MATIN-AO BRIDGE (B01028MN) ALONG MARBEL-MAKAR ROAD, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱40.3M | 100% | Medium risk40 | —-0.020 |
| 429 | 20LC0166CONSTRUCTION OF 3STY6CL SCHOOL BUILDING AT MAGDUM NATIONAL HIGH SCHOOL, CITY OF TAGUM, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱20.5M | 100% | Medium risk40 | —-0.038 |
| 430 | 23MB0013CONST/IMP. OF ACCESS RDS LEADING TO TRADES, IND. AND ECON. ZONES (RDS LINKAGES FOR IND. AND TRADE INFRA PROGRAM-ROLL-IT)-POBLACION-SAN-ISIDRO-LIBERTY-PULABATO-PALO RD CONNECT TO HVCC PLANTATION AREAS AND TAMPAKAN PUB MARKET IN SUPPORT OF AGRIBUSINESS IND | Region XII | South Cotabato 1st DEO | On-Going | ₱52.7M | 72% | Medium risk40 | —-0.018 |
| 431 | 18ED0190REPAIR/REHABILITATION/RECONSTRUCTION OF CAMANSIHAN RIVER CONTROL, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.026 |
| 432 | 18MA0075CONSTRUCTION OF SEAWALL PROTECTION PURA SECTION, DATU BLAH SINSUAT, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱33.4M | 100% | Medium risk40 | —-0.054 |
| 433 | 18NH0006GAMUT BRIDGE (B00700MN) ALONG SDCR, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱5.6M | 100% | Medium risk39 | —-0.041 |
| 434 | 17IL0152CONSTRUCTION OF 3STY/12CL SCHOOL BUILDING, SOGOD NATIONAL HIGH SCHOOL (SCH. ID#303487), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱30.6M | 100% | Medium risk39 | —-0.022 |
| 435 | 20HJ0124CONSTRUCTION OF ONE UNIT TWO STOREY SIX CLASSROOM SCHOOL BUILDING AT BAYOG ELEMENTARY SCHOOL, CANLAON CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱17.3M | 100% | Medium risk39 | —-0.041 |
| 436 | 22M00048CONSTRUCTION OF FLOOD CONTROL, MASLABENG PHASE II, STA 0+266-STA 0+531, BULUAN, MAGUINDANAO | Region XII | Region XII | Completed | ₱81M | 100% | Medium risk39 | —-0.066 |
| 437 | 20NC0013CONSTRUCTION OF UMAYAM RIVER FLOOD CONTROL (NEAR WALOE BRIDGE DOWNSTREAM) LORETO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.064 |
| 438 | 18NF0001CONSTRUCTION OF SIDLAKAN SEAWALL/BRGY SIDLAKAN, SURIGAO CITY, SURIGAO DEL NORTE, STA.0+000 - 0+249.2 RIGHT | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱39.8M | 100% | Medium risk39 | —-0.065 |
| 439 | 18EB0118FLOOD MANAGEMENT PROGRAM-CONSTRUCTION OF ANAHAWIN RIVER FLOOD CONTROL STRUCTURES (PHASE -2), CALINTAAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱24.6M | 100% | Medium risk39 | —-0.040 |
| 440 | 17IL0121CONSTRUCTION OF 2STY/8CL SCHOOL BUILDING, SOGOD NATIONAL HIGH SCHOOL (SCH. ID#303487) SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱18M | 100% | Medium risk39 | —-0.027 |
| 441 | 21NC0077CONSTRUCTION OF RIVER BANK PROTECTION OF IHAWAN RIVER, STA. 0+000.00 - 0+165, LORETO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.062 |
| 442 | 18MC0066ROAD WIDENING ALONG PACO-ROXAS-ARAKAN VALLEY JCT DAVAO-BUKIDNON ROAD, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱91.7M | 100% | Medium risk38 | —-0.071 |
| 443 | 18MA0068ROAD CONSTRUCTION / CONCRETING OF BUNGUED-KAKAR ROAD, DATU ODIN SINSUAT, MAGUINDANAO | Region XII | Cotabato City DEO | Completed | ₱28.8M | 100% | Medium risk38 | —-0.054 |
| 444 | 20NH0046REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS SURIGAO-DAVAO COASTAL RD. - K1269+219 - K1269+246, K1270+250 - K1270+300, K1341+289 - K1341+320, LANUZA AND MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱28.1M | 100% | Medium risk38 | —-0.079 |
| 445 | 18NF0049CONSTRUCTION OF WAVE BREAKER ALONG COASTLINES OF BARANGAY ALAMBIQUE AND IPIL/BRGY. ALAMBIQUE AND IPIL, GIGAQUIT, SURIGAO DEL NORTE, STA.0+680.00 - STA.0+802.8 | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱29.4M | 100% | Medium risk38 | —-0.069 |
| 446 | 22M00020CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA-CAPITON-TANUEL RIVER , (TAMONTAKA SECTION-PHASE I), STA 0 + 000 - STA 0 + 421, DATU ODIN SINSUAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱81.6M | 100% | Medium risk38 | —-0.069 |
| 447 | 19NH0031CONSTRUCTION OF CARAC-AN FLOOD CONTROL (ABUTMENT B) CANCAVAN, MADRID, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱39.2M | 100% | Medium risk37 | —-0.065 |
| 448 | 18NH0040CONST. OF BAYOGO REVETMENT,BARANGAY BAYOGO,MADRID,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱37.9M | 100% | Medium risk37 | —-0.065 |
| 449 | 18NI0020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL PROJECT AT RAJAH CABUNGSUAN, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱37.8M | 100% | Medium risk37 | —-0.051 |
| 450 | 16IL0124CONSTRUCTION OF 3-STOREY 12-CL SCHOOL BUILDING, HINUNANGAN NATIONAL HIGH SCHOOL(CANIPAAN NHS SCHOOL ID 303447)HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱21.3M | 100% | Medium risk37 | —-0.023 |