Contractor dossier
624 projects on file, including joint ventures this contractor is part of.
Total projects
624
Total budget
₱28.3B
Average progress
97.4%
Completion rate
85.6%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
44
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| Region XII | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| Region VIII | 101 | ₱2.3B | 52.1 | 22 | 88.4% |
| Region IX | 52 | ₱2.6B | 54.6 | 3 | 99.3% |
| Region XIII | 45 | ₱2.3B | 44.7 | 1 | 100.0% |
| Region X | 39 | ₱2.4B | 50.6 | 2 | 98.3% |
| Region IV-B | 13 | ₱942.3M | 49.8 | 0 | 100.0% |
| Region VII | 10 | ₱204.1M | 42.2 | 0 | 96.5% |
| Region VI | 6 | ₱251.5M | 51.2 | 0 | 100.0% |
| National Capital Region | 6 | ₱159.3M | 43.4 | 0 | 100.0% |
| Negros Island Region | 4 | ₱266.3M | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 200 | ₱11.5B | 46.6 | 5 | 99.2% |
| Buildings and Facilities | 155 | ₱3.8B | 33.2 | 8 | 97.7% |
| Flood Control and Drainage | 135 | ₱7.4B | 46.1 | 1 | 98.7% |
| Bridges | 72 | ₱2.1B | 39.5 | 2 | 97.4% |
| OTHER | 36 | ₱2.2B | 77.4 | 21 | 86.4% |
| Water Provision and Storage | 13 | ₱513.1M | 44.6 | 1 | 94.9% |
| GAA 2025 SSP | 6 | ₱154.7M | 91.9 | 5 | 76.6% |
| Bridges, Roads | 6 | ₱520M | 52.4 | 1 | 95.3% |
| GAA 2025 OO-2 | 1 | ₱14.5M | 85.7 | 0 | 71.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 25IN0060SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MANLICO ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IN0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO D | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱6.7M | 96% | High risk95 | Flagged0.009 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 25IN0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY ILAYA, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 91% | High risk91 | Flagged0.010 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 25MG0049CONSTRUCTION OF RIVERBANK PROTECTION ALONG B'LOK CREEK, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱43.2M | 100% | High risk84 | —-0.018 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 17J00004ROAD UPGRADING (GRAVEL TO PAVED) OF SINDANGAN-BAYOG-LAKEWOOD ROAD ZAMBOANGA DEL NORTE (ZDN - 1ST DEO) CHAINAGE 7599 - CHAINAGE 9881 (STA. 1936 + 440.00 TO STA. 1938 + 722.00) (NET LENGTH: 2,282.00 LN.M.) | Region IX | Region IX | Completed | ₱143.5M | 100% | High risk82 | —-0.002 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 24I00213CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. NUEVA ESPERANZA ROAD, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 85% | High risk80 | Flagged0.004 |
| 24I00224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. STO. NIÑO 1 - SALVACION (SITIO DAGMOL) ROAD, | Region VIII | Region VIII | On-Going | ₱9.9M | 68% | High risk80 | Flagged0.010 |
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 23I00159CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE, RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱9.6M | 99% | High risk80 | Flagged0.007 |
| 24I00227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. CENTRAL TO BRGY. GABI ROAD, SAN FRANCISCO, S | Region VIII | Region VIII | On-Going | ₱19.8M | 68% | High risk80 | Flagged0.010 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00109CONSTRUCTION OF CONCRETE BRIDGE (SUBSTRUCTURE AND PARTIAL SUPERSTRUCTURE) - FATIMA - MALABOG ROAD (MALABOG - GUMITAN), PACKAGE 3, DAVAO CITY | Region XI | Region XI | On-Going | ₱97.8M | 12% | High risk80 | Flagged0.061 |
| 19J00017CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BUENAVISTA - BOLONG COASTAL BYPASS ROAD (LUBIGAN - MALA SECTION) INCLUDING BRIDGE, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱110.5M | 79% | High risk84 | Flagged0.053 |
| 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 18JH0037CONSTRUCTION OF 3-STOREY 15-CL SCHOOL BUILDING AT ISABELA EAST CENTRAL ELEMENTARY SCHOOL | Region IX | Isabela City DEO | On-Going | ₱36.6M | 100% | Medium risk53 | Flagged0.032 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 24I00124NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SOGOD TO BUENAVISTA, BONTOC BYPASS ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱84.4M | 27% | High risk81 | Flagged0.028 |
| 25IN0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PRES. ROXAS, LILOAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱2M | 38% | High risk91 | Flagged0.025 |
| 24I00287NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - BDRY. SOUTHERN LEYTE - MAASIN - MACROHON - SOGOD - JCT DAANG MAHARLIKA - K1208+396 - K1209+000, K1210+787 - K1212+090, K1212+136 - K1212+1186, K1212+1253 - K1213+232, SOUTHERN LEYTE SUB-DEO | Region VIII | Region VIII | On-Going | ₱100.6M | 47% | High risk83 | Flagged0.022 |
| 25KL0129CONSTRUCTION OF BRIDGE, SITIO PIGTAO, BARANGAY NANGCAON, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱96M | 35% | High risk95 | Flagged0.021 |
| 24ME0122CONSTRUCTION OF MAASIM LEVEL III WATER SUPPLY, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱32.9M | 60% | High risk73 | Flagged0.020 |
| 21I00079CONSTRUCTION OF EVACUATION CENTER, BARANGAY GUIBUANGAN, CATUBIG, NORTHERN SAMAR | Region VIII | Region VIII | On-Going | ₱34.8M | 100% | High risk77 | Flagged0.019 |
| 16ME0183CONST. OF (2) UNITS, (4) STOREY, (16) CL BLDG., LEONARD YOUNG SR. NHS, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱60.8M | 100% | Low risk24 | Flagged0.019 |
| 19L00062CONSTRUCTION OF CONCRETE ROAD-BOLILA-KIBALATONG-BITO-MANA DIVERSION ROAD, PACKAGE 3,DAVAO OCCIDENTAL | Region XI | Region XI | Completed | ₱169.6M | 100% | High risk79 | Flagged0.015 |
| 18L00122DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, INCL. ROW, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱150.7M | 100% | High risk66 | Flagged0.014 |
| 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 24I00079BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROAD - JUBAS BR. (B00603LT) ALONG DAANG MAHARLIKA (LT) | Region VIII | Region VIII | On-Going | ₱81M | 76% | High risk83 | Flagged0.013 |
| 24I00320CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE - MILAGROSO ROAD, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱19.8M | 48% | High risk79 | Flagged0.013 |
| 22L00130CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE ALONG BUNAWAN RIVER PROTECTING DAANG MAHARLIKA (MN), DAVAO CITY | Region XI | Region XI | On-Going | ₱142.4M | 63% | High risk65 | Flagged0.013 |
| 23M00176WIDENING OF PERMANENT BRIDGES - SARAKAN BRIDGE ALONG COTABATO-LANAO RD, K1897+895, - K1897+933, MATANOG, MAGUINDANAO | Region XII | Region XII | On-Going | ₱48.2M | 17% | Low risk27 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19LE0070CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO PUTING BALAS BEACH RESORT AND KISULAD WHITE SAND BEACHES, BRGY. BASIAWAN, STA. MARIA, DAVAO OCCIDENTAL (STA.0+570 - STA.1+708, STA.2+239 - STA.3+199.02 W/ EQUATION) | Region XI | Davao Occidental DEO | Completed | ₱57.8M | 100% | Medium risk54 | —-0.085 |
| 127 | 17LF0006CONSTRUCTION OF BANAO PROTECTION WORKS, BAGANGA, DAVAO ORIENTAL FIRST LD | Region XI | Davao Oriental 1st DEO | Completed | ₱47.4M | 100% | Medium risk54 | —-0.036 |
| 128 | 17NH0017CONSTRUCTION OF SHORE PROTECTION FOR BRGY. MADRELIÑO, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱13.6M | 100% | Medium risk54 | —-0.035 |
| 129 | 19LE0083OFF-CARRIAGEWAY IMPROVEMENT ALONG DAVAO-SARANGANI COASTAL ROAD (MALALAG-MALITA-JAS-G), DON MARCELINO, DAVAO OCCIDENTAL (SECT. A: K1671+500 - K1672+509, SECT. B: K1675+700 - K1677+070) | Region XI | Davao Occidental DEO | Completed | ₱65.7M | 100% | Medium risk54 | —-0.078 |
| 130 | 23JB0052ROAD WIDENING DIPOLOG-POLANCO-PIÑAN JCT. OROQUIETA ROAD K1816+763-K1817+726.40 | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱23.8M | 100% | Medium risk54 | —-0.085 |
| 131 | 18LC0019CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG SAUG RIVER INCLUDING ROW, CAMBANOGOY SECTION, ASUNCION | Region XI | Davao del Norte DEO | Completed | ₱91.1M | 100% | Medium risk54 | —-0.061 |
| 132 | 18JB0011CONSTRUCTION OF CONCRETE ROAD-JCT. DIPOLOG-SINDANGAN-LILOY ROAD CONNECTING TO BAGO-SIARI SECTION IN SUPPORT OF RICE, RUBBER, COCONUT & ABACA INDUSTRIES, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.7M | 100% | Medium risk54 | —-0.077 |
| 133 | 20LE0096CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALANGONAN, JOSE ABAD SANTOS, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱78.6M | 100% | Medium risk54 | —-0.069 |
| 134 | 21LE0027CONSTRUCTION OF NEW BRIDGES: KINANGAN BR. 2 ALONG H-WAY JCT. MANA-TICULON-LAGUMIT-LITTLE BAGUIO ROAD, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱86.9M | 100% | Medium risk54 | —-0.052 |
| 135 | 20LA0152CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AT SPECIFIC LOCATIONS ALONG BENIGNO S. AQUINO JR. NATIONAL HIGHWAY (S01432MN) COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱74.3M | 100% | Medium risk54 | —-0.069 |
| 136 | 24H00095CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY TABUNAN, CEBU CITY | Region VII | Region VII | On-Going | ₱57.9M | 66% | Medium risk54 | —-0.023 |
| 137 | 20LC0004KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) ROAD K1520+365 - K1520+396, K1525+520 - K1525+590, K1528+061 - K1528+105, K1528+489 - K1528+573 | Region XI | Davao del Norte DEO | Completed | ₱71.8M | 100% | Medium risk54 | —-0.083 |
| 138 | 17JD0026CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES PULAUAN BRIDGE(BO0588MN) ALONG DIPOLOG-OROQUIETA NATIONAL ROAD,ZN | Region IX | Zamboanga del Norte 1st DEO | Completed | ₱4.8M | 100% | Medium risk54 | —-0.034 |
| 139 | 18LA0122REHAB./RECONSTRUCTION OF NATIONAL ROAD W/SLIP, SLOPE COLLAPSE AND LANDSLIDE OF COMPOSTELA-CATEEL ROAD, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱72.7M | 100% | Medium risk54 | —-0.069 |
| 140 | 19LC0044CONSTRUCTION OF ACCESS ROAD LEADING TO TAGUM ENERGY PARK,BRGY.APOKON TO HIJO RESOURCES TO LANIKAI BOUTIQUE HOTEL AND BANANA BEACH,BRGY.MADAUM,TAGUM CITY,DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱64.7M | 100% | Medium risk54 | —-0.045 |
| 141 | 18J00111CONSTRUCTION OF ROMANDIER-CAMP ANDRES NATIONAL ROAD, PANAMAO, SULU | Region IX | Region IX | Completed | ₱49.7M | 100% | Medium risk54 | —-0.082 |
| 142 | 18L00168SOUTHERN MINDANAO INTEGRATED AGRICULTURAL LABORATORY: DEPT. OF AGRICULTURE REGION XI,MANAMBULAN,DAVA | Region XI | Region XI | Completed | ₱130M | 100% | Medium risk53 | Flagged0.001 |
| 143 | 18L00189CONST. OF STUDENT DORMITORY-UP MINDANAO,UNIV. OF THE PHILIPPNES-MINDANAO CAMPUS,BAGO OSHIRO,TUGBOK DISTRICT, DAVAO CITY | Region XI | Region XI | Completed | ₱99.3M | 100% | Medium risk53 | —-0.013 |
| 144 | 20ID0041NETWORK DEVELOPMENT-ROAD WIDENING-TERTIARY ROADS-BAGAHUPI-BABATNGON-STA. CRUZ - BARUGO-CARIGARA RD. K0942+551-K0942+815,K0942+827-K0943+933 | Region VIII | Leyte 2nd DEO | Completed | ₱48.8M | 100% | Medium risk53 | —-0.094 |
| 145 | 20LE0095CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG DAVAO-SARANGAI COASTAL RD (MALALAG-MALITA-JAS-G) (S00209MN) K1663+225 -K1663+595, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱82M | 100% | Medium risk53 | —-0.090 |
| 146 | 20LE0094CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG DEMOLOC-LITTLE BAGUIO-ALABEL RD (S00209MN) K1649+720 - K1650+090, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱82M | 100% | Medium risk53 | —-0.090 |
| 147 | 19I00128CONSTRUCTION OF EVACUATION CENTER, SITIO PINASU-AN, BRGY. SAN MIGUEL, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | Completed | ₱36.6M | 100% | Medium risk53 | —-0.089 |
| 148 | 21LE0015OFF-CARRIAGEWAY IMPROVEMENT: DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G) K1686+400 - K1689+400, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱54.6M | 100% | Medium risk53 | —-0.086 |
| 149 | 19LE0079CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATIONS ALONG DEMOLOC - LITTLE BAGUIO - ALABEL ROAD (S00203MN), DEMOLOC-LITTLE BAGUIO-ALABEL ROAD (SECTION 1- STA.1646+970 - STA.1647+220, SECTION 2 - STA.1647+237 - STA.1647+317) | Region XI | Davao Occidental DEO | Completed | ₱54.7M | 100% | Medium risk53 | —-0.086 |
| 150 | 18L00151CONSTRUCTION OF NABUNTURAN-LAAK ROAD, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱54.8M | 100% | Medium risk53 | —-0.048 |