Contractor dossier
277 projects on file, including joint ventures this contractor is part of.
Total projects
277
Total budget
₱4.7B
Average progress
96.2%
Completion rate
88.4%
Average risk score
42.4
Medium risk on average, out of 100
Flagged as unusual
4
1.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 272 | ₱4.5B | 42.3 | 4 | 96.3% |
| Negros Island Region | 5 | ₱197.3M | 46.7 | 0 | 93.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 179 | ₱2.8B | 42.7 | 3 | 95.8% |
| Buildings and Facilities | 60 | ₱563.1M | 35.9 | 0 | 97.4% |
| Flood Control and Drainage | 21 | ₱1B | 52.8 | 0 | 97.6% |
| Bridges | 10 | ₱138.9M | 43.9 | 0 | 93.0% |
| OTHER | 5 | ₱170.3M | 67.4 | 1 | 98.5% |
| Water Provision and Storage | 2 | ₱6.2M | 29.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00163CONSTRUCTION OF SCHOOL BUILDING, CEBU TECHNOLOGICAL UNIVERSITY (CTU), MALABUYOC EXTENSION CAMPUS, MALABUYOC, CEBU - CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱29.8M | 93% | High risk87 | Flagged0.053 |
| 25HM0036OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MARIA RIVER (UPSTREAM OF MARIA BRIDGE), PHASE 1, PO | Negros Island Region | Siquijor DEO | On-Going | ₱96.5M | 80% | High risk77 | —-0.002 |
| 23HN0085CSSP: ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES AT AGATON SORONO ST. TO SUBA MASULOG-SUBA PANAS ROAD, BARGY. SUBABASBAS, LAPU-LAPU CITY, CITY | Region VII | Cebu 6th DEO | Completed | ₱96.4M | 100% | High risk73 | —-0.018 |
| 25HM0035OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD CONTROL STRUCTURE AT LOTLOTON RIVER (UPSTREAM OF LOTLOTON BRIDGE), PHAS | Negros Island Region | Siquijor DEO | On-Going | ₱91M | 85% | High risk72 | —-0.005 |
| 25HO0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MAHANLUD -BAR | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 33% | High risk65 | —-0.023 |
| 17HF0012NETWORK DEVELOPMENT- OFF - CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY, TAPAL (CARCAR) ZARAGOSA-OLANGO-ALOGUINSAN ROAD (S00235CB), K0080+(-340) - K0082+150, BRGY. OLANGO, ALOGUINSAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱27.4M | 100% | High risk64 | —-0.030 |
| 23HO0067ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LOWER TALAYONG, BRGY. TUPAS - SI | Region VII | Cebu 7th DEO | Completed | ₱96.4M | 100% | High risk64 | —-0.066 |
| 17HE0016ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4) - TERTIARY ROADS K00+000-K00+249, TABUNOK FLY | Region VII | Cebu 1st DEO | Completed | ₱9.5M | 100% | High risk63 | —-0.032 |
| 23HO0317CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF STA. FILOMENA-VALENCIA ROA | Region VII | Cebu 7th DEO | On-Going | ₱7.1M | 0% | High risk63 | Flagged0.053 |
| 17HF0028CONSTRUCTION OF DRAINAGE STRUCTURE (1 UNIT-TRIPLE BARREL BOX CULVERT & 2 UNITS-SINGLE BARREL BOX CULVERT) ALONG TOLEDO-PINAMUNGAJAN -ALOGUINSAN-MANTALONGON ROAD, SECTION 1:K0059+087, SECTION 2: K0064 + 000, SECTION 3:K0063+915. TAJAO & POB.PINAMUNGAJAN | Region VII | Cebu 3rd DEO | Completed | ₱6.5M | 100% | High risk62 | —-0.065 |
| 17HF0002PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) - SECONDARY, TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD, (REBLOCKING/REHABILITATION), BRGY. KAWASAN, ALOGUINSAN, CEBU K0080 + 000 - K0081 + 000 | Region VII | Cebu 3rd DEO | Completed | ₱7.2M | 100% | High risk62 | —-0.063 |
| 23HO0303CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF MANLUM - SALAMANCA ROAD (P | Region VII | Cebu 7th DEO | On-Going | ₱7.1M | 0% | High risk62 | Flagged0.054 |
| 25HE0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PUBLIC MARKET) OF POBLACION, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱34.3M | 0% | High risk61 | —-0.002 |
| 23HO0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROADS, PALANAS-CANORONG-MANGACO BRGY. ROADS, GINATIL | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.084 |
| 24HO0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANGACO ROAD, BARANGAY MA | Region VII | Cebu 7th DEO | On-Going | ₱96.5M | 97% | High risk60 | —-0.045 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0303CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF MANLUM - SALAMANCA ROAD (P | Region VII | Cebu 7th DEO | On-Going | ₱7.1M | 0% | High risk62 | Flagged0.054 |
| 24H00163CONSTRUCTION OF SCHOOL BUILDING, CEBU TECHNOLOGICAL UNIVERSITY (CTU), MALABUYOC EXTENSION CAMPUS, MALABUYOC, CEBU - CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱29.8M | 93% | High risk87 | Flagged0.053 |
| 23HO0317CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF STA. FILOMENA-VALENCIA ROA | Region VII | Cebu 7th DEO | On-Going | ₱7.1M | 0% | High risk63 | Flagged0.053 |
| 25HO0124CONCRETING OF BRGY. MINDANAO - BRGY. STO. NIÑO FARM-TO-MARKET ROAD, MALABUYOC, CEBU (PACKAGE 2) | Region VII | Cebu 7th DEO | On-Going | ₱29.3M | 95% | Medium risk48 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23HO0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES, CONSTRUCTION OF BRIDGE AT CERDEÑA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | Completed | ₱24.3M | 100% | Medium risk48 | —-0.055 |
| 52 | 21HF0026A. CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY NEW BAGO, ASTURIAS, CEBU; B. CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY TAGBUBONGA, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱5.8M | 100% | Medium risk48 | —-0.092 |
| 53 | 18HG0147CONCRETING OF PROPER VALENCIA - SITIO LAW-ANG, BRGY. VALENCIA FMR, BRGY. VALENCIA, ALEGRIA, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.7M | 100% | Medium risk48 | —-0.008 |
| 54 | 19HF0021RETROFITTING/STRENGTHENING OF IBO BRIDGE (B00555CB) ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD | Region VII | Cebu 3rd DEO | Completed | ₱11.9M | 100% | Medium risk48 | —-0.059 |
| 55 | 19HF0068REHABILITATION/MAJOR REPAIR OF MANTALONGON BR. (B00522CB) ALONG TOLEDO-PINAMUNGAHAN-ALONGUINSAN-MANTALONGON ROAD | Region VII | Cebu 3rd DEO | Completed | ₱7.8M | 100% | Medium risk48 | —-0.058 |
| 56 | 24HO0141CONCRETING OF POBLACION - DAGATAN - SOHOTON FMR, BRGY. DAGATAN AND BRGY. SOHOTON, BADIAN, CEBU | Region VII | Cebu 7th DEO | Completed | ₱14.9M | 100% | Medium risk48 | —-0.041 |
| 57 | 24HO0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG TALABA RIVER FLOOD CONTROL, B | Region VII | Cebu 7th DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.077 |
| 58 | 19HF0033CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT STA. ANA RIVER ALONG CARCAR-BARILI ROAD/BARILI MANTAYUPAN ROAD, K0060+564, BRGY. POBLACION, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.077 |
| 59 | 22HG0058OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BARANGAY POBLACION, BOLJOON SEAWALL | Region VII | Cebu 2nd DEO | On-Going | ₱18M | 100% | Medium risk48 | —-0.018 |
| 60 | 22HG0026OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF PASIL FLOOD CONTROL, SANTANDER CEBU | Region VII | Cebu 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.076 |
| 61 | 21HG0050OO2: PROTECTS LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG YLAYA BRIDGE, YLAYA, RONDA, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.077 |
| 62 | 19HF0003CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BONBON RIVER ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD, K0064+303, BRGY. POBLACION, PINAMUNGAJAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.077 |
| 63 | 20HG0068OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MATUTINAO RIVER FLOOD CONTROL, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.076 |
| 64 | 20HF0074A. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, BARILI, CEBU;B. CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱17.8M | 100% | Medium risk47 | —-0.090 |
| 65 | 18HG0103ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, CONSTRUCTION OF NEW PERMANENT BRIDGES, LILO-AN BRIDGE ALONG NATALIO BACALSO AVENUE (CEBU SOUTH ROAD) | Region VII | Cebu 2nd DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.057 |
| 66 | 22HO0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO CAMBAIS FALLS, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.094 |
| 67 | 18HF0079CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BOLOCBOLOC SULFURIC SPRING AND MANTAYUPAN FALLS, BRGY. DAKIT, BARILI, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱39.5M | 100% | Medium risk47 | —-0.094 |
| 68 | 22HO0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - TUBOD - BASIAO - CANDIIS ROAD LEADING TO SALAGMAYA PEAK, BADIAN, CEBU | Region VII | Cebu 7th DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.095 |
| 69 | 22HO0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - BUGAS - TIGBAO - SANTICON ROAD LEADING TO CANDUNGAO AND SOHOTON PEAKS, BADIA | Region VII | Cebu 7th DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.095 |
| 70 | 21HG0176CONCRETING OF BRGY. MANGA, ALCANTARA TO BRGY. BUGUIL, MOALBOAL FMR, BRGY. MANGA AND BRGY. BUGUIL, ALCANTARA AND MOALBOAL, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱24.9M | 100% | Medium risk47 | —-0.037 |
| 71 | 23HO0211CONCRETING SITIO LIBO, BRGY. LEPANTO FMR, BRGY. LEPANTO, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.040 |
| 72 | 25HD0117ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - NAGA-ULING RD - K0035+860 - K0036+000, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱33.7M | 9% | Medium risk47 | —-0.033 |
| 73 | 23HO0210CONCRETING OF CAGSING-SALAMANCA FARM-TO-MARKET ROAD AT BRGY. CAGSING AND SALAMANCA, GINATILAN, CEBU | Region VII | Cebu 7th DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.040 |
| 74 | 22HO0090CONSTRUCTION OF LANGIN-CANSALONOY FMR, BRGYS. LANGIN AND BRGY. CANSALONOY, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.041 |
| 75 | 25HE0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY LIPTO | Region VII | Cebu 2nd DEO | On-Going | ₱38.4M | 16% | Medium risk47 | —-0.035 |