Contractor dossier
287 projects on file, including joint ventures this contractor is part of.
Total projects
287
Total budget
₱6.3B
Average progress
94.2%
Completion rate
81.9%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
12
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 287 | ₱6.3B | 45.9 | 12 | 94.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 132 | ₱3B | 44.1 | 2 | 96.2% |
| Flood Control and Drainage | 94 | ₱2.4B | 46.7 | 0 | 96.7% |
| Buildings and Facilities | 41 | ₱510.1M | 40.8 | 2 | 84.6% |
| OTHER | 6 | ₱115.8M | 76.5 | 2 | 94.2% |
| Water Provision and Storage | 5 | ₱25.4M | 32.2 | 1 | 89.9% |
| GAA 2025 SSP | 4 | ₱42.6M | 93.8 | 4 | 73.0% |
| Bridges, Roads | 2 | ₱174.7M | 55.7 | 0 | 100.0% |
| Bridges | 2 | ₱20.4M | 41.2 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱74.9M | 90.9 | 1 | 71.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD CONNECTING SUYO-ALILEM, SUYO, ILOCOS SUR (PHASE 2) | Region I | Region I | On-Going | ₱18.7M | 76% | High risk95 | Flagged0.023 |
| 25AD0040BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BRIDGE, BARANGAY CABUGAO, SUYO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱4.8M | 91% | High risk94 | Flagged0.018 |
| 25A00157BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, BARANGAY BATBATO, ALILEM, ILOCOS SUR | Region I | Region I | On-Going | ₱9.6M | 66% | High risk94 | Flagged0.024 |
| 25AD0027CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTA LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 59% | High risk93 | Flagged0.027 |
| 25AD0042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, STA. 0+000 - STA. 0+780, SUGPON, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱74.9M | 71% | High risk91 | Flagged0.004 |
| 25AD0076CONCRETING OF BAGANI GABOR-TOCGO-DALDAGAN-OAIGDAYA FMR, GALIMUYOD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 65% | High risk86 | Flagged0.055 |
| 24AD0101CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, BUGNAY ELEMENTARY SCHOOL, BRGY. BUGNAY, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱12.4M | 100% | High risk86 | Flagged0.045 |
| 24AD0051FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF VILLARICA-TALOGTOG CATERMAN FLOOD CONTROL, CANDON CITY ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱54.4M | 100% | High risk73 | —-0.019 |
| 22AD0117CONSTRUCTION OF BARANGAY ALLANGIGAN 2ND ROAD, BRGY. ALLANGIGAN 2ND, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.026 |
| 24AD0043CONSTRUCTION OF ROAD, PALALI-NORTE-PALACAPAC ROAD, SANTA LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱14.7M | 100% | High risk71 | —-0.026 |
| 24AD0046FLOOD MITIGATION STRUCTURES PROTECTING MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOGTOG CATERMAN, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱14.7M | 100% | High risk71 | —-0.027 |
| 17A00037CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATIONS, CANDON-SANTIAGO-SAN ESTEBAN COASTAL ROAD LEADING TO SANTIAGO COVE, SANTIAGO, ILOCOS SUR | Region I | Region I | Completed | ₱96.5M | 100% | High risk67 | —-0.035 |
| 16AD0161CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION : CONSTRUCTION OF CARCARABASA RIVER CONTROL ALONG JCT. SANTIAGO-BANAYOYO- LIDLIDDA-SAN EMILIO-QUIRINO ROAD, STA. 0+160-STA. 0+630, LIDLIDDA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱20.1M | 100% | High risk65 | —-0.041 |
| 17AD0003CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF RIVER CONTROL ALONG TABLAC-BAGAR, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.039 |
| 17AD0002CONSTRUCTIN/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF FLOOD CONTROL STRUCTURE-BUCAO WEST, TAGUDIN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱34.3M | 100% | High risk65 | —-0.040 |
| 16AD0170CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION : CONSTRUCTION OF CALUNGBUYAN TO DARAPIDAP SEAWALL, CANDON CITY, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱27.9M | 100% | High risk65 | —-0.039 |
| 16AD0163CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL ALONG CAVITE BRIDGE 1 & 2 , MNR, STA. LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.5M | 100% | High risk65 | —-0.040 |
| 16AD0165CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION : CONSTRUCTION OF OAIG-DAYA-SAN NICOLAS FLOOD CONTROL (GABION REVETMENT WALL ), CANDON CITY, ILOCOS SUR 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱24.5M | 100% | High risk65 | —-0.040 |
| 17AD0001CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURE: CONSTRUCTION OF FLOOD CONTROL STRUCTURE-BUCAO EAST, TAGUDIN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱26.2M | 100% | High risk65 | —-0.040 |
| 17AD0019ASSET PRESERVATION OF NATIONAL ROADS: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ,PRIMARY ROADS, MANILA NORTH ROAD, K0348+000-K0349+000 | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk65 | —-0.046 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AD0076CONCRETING OF BAGANI GABOR-TOCGO-DALDAGAN-OAIGDAYA FMR, GALIMUYOD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 65% | High risk86 | Flagged0.055 |
| 24AD0101CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS, BUGNAY ELEMENTARY SCHOOL, BRGY. BUGNAY, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱12.4M | 100% | High risk86 | Flagged0.045 |
| 24A00590CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - ALILEM SUPER HEALTH CENTER, ILOCOS SUR | Region I | Region I | On-Going | ₱11.6M | 31% | Medium risk39 | Flagged0.037 |
| 25AD0027CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANTA LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 59% | High risk93 | Flagged0.027 |
| 25A00157BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF ROAD, BARANGAY BATBATO, ALILEM, ILOCOS SUR | Region I | Region I | On-Going | ₱9.6M | 66% | High risk94 | Flagged0.024 |
| 25A00197SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD CONNECTING SUYO-ALILEM, SUYO, ILOCOS SUR (PHASE 2) | Region I | Region I | On-Going | ₱18.7M | 76% | High risk95 | Flagged0.023 |
| 24A00622REPAIR AND RENOVATION OF ACADEMIC BUILDING (COLLEGE OF TEACHER EDUCATION BUILDING) PHASE III, STA. MARIA - ILOCOS SUR POLYTECHNIC STATE COLLEGE | Region I | Region I | On-Going | ₱14.9M | 40% | Medium risk44 | Flagged0.018 |
| 25AD0040BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BRIDGE, BARANGAY CABUGAO, SUYO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱4.8M | 91% | High risk94 | Flagged0.018 |
| 25AD0042CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AMBURAYAN RIVER, STA. 0+000 - STA. 0+780, SUGPON, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱74.9M | 71% | High risk91 | Flagged0.004 |
| 17AD0032CONCRETING OF BRGY. PALACAPAC FMR,BRGY. PALACAPAC, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱3.8M | 100% | Low risk22 | Flagged0.001 |
| 25AD0071CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE /RAINWATER COLLECTOR SYSTEM-RAINWATER COLLECTOR SYSTEM | Region I | Ilocos Sur 2nd DEO | On-Going | ₱2.5M | 50% | Medium risk33 | Flagged0.001 |
| 17AD0033CONCRETING OF BRGY. SAPANG FMR, BRGY. SAPANG, STA. LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17AD0021REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, COLLAPSE AND PRIMARY ROADS: MANILA NORTH ROAD , K0383+050-K0383+100, K0383+150-K0383+200, K0383+950-K0384+058 | Region I | Ilocos Sur 2nd DEO | Completed | ₱16.8M | 100% | High risk63 | —-0.052 |
| 27 | 16AD0147REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), STA. MARIA-BURGOS ROAD, K0372+182-K0372+848 | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.1M | 100% | High risk63 | —-0.052 |
| 28 | 20AD0072CONSTRUCTION OF SAN PEDRO SEAWALL, NARVACAN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.5M | 100% | High risk62 | —-0.043 |
| 29 | 18A00023CONSTRUCTION OF BYPASS/DIVERSION ROADS, CANDON CITY BYPASS ROAD INCLUDING BRIDGE, ILOCOS SUR | Region I | Region I | Completed | ₱119.8M | 100% | High risk61 | —-0.051 |
| 30 | 24A00252CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROAD LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), POBLACION SUR - SORIOAN - LUCBUBAN - UBBOG - BAYBAYADING ROAD CONNECTING CANDON | Region I | Region I | On-Going | ₱113.4M | 94% | Medium risk56 | —-0.033 |
| 31 | 23AD0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (TERMINAL BUILDING), CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱69.3M | 90% | Medium risk56 | —-0.025 |
| 32 | 18A00076CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CANDON-SANTIAGO-SAN ESTEBAN-STA. MARIA COASTAL ROAD LEADING TO SANTIAGO COVE, SANTIAGO, ILOCOS SUR | Region I | Region I | Completed | ₱160.5M | 100% | Medium risk56 | —-0.051 |
| 33 | 25AD0064CONSTRUCTION OF MULTIPURPOSE BUILDING - CANDON TERMINAL BUILDING, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱66.9M | 0% | Medium risk55 | —-0.004 |
| 34 | 19A00030ROAD WIDENING - PRIMARY ROADS, MANILA NORTH RD - K0385 + 120 - K0389 + 174 | Region I | Region I | Completed | ₱118.6M | 100% | Medium risk54 | —-0.063 |
| 35 | 16AD0159CONSTREUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS: REPLACEMENT OF PERMANENT WEAK BRIDGES-DAN-AR BRIDGE (B00624LZ) ALONG MANILA NORTH ROAD, SANTIAGO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱16.6M | 100% | Medium risk54 | —-0.021 |
| 36 | 25AD0011CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN EMILIO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 45% | Medium risk53 | —-0.029 |
| 37 | 23AD0068CONSTRUCTION OF MULTI-PURPOSE BUIDLING, SAN EMILIO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.5M | 100% | Medium risk53 | —-0.074 |
| 38 | 24AD0031CONSTRUCTION OF MULTI-PURPOSE BUILDING IN CANDON SPORTS COMPLEX AND CONVENTION CENTER, BAGANI CAMPO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱29.7M | 100% | Medium risk52 | —-0.039 |
| 39 | 24AD0063CONSTRUCTION OF SALCEDO MULTIPURPOSE BUILDING, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | Medium risk52 | —-0.077 |
| 40 | 25AD0043CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDINGPHASE I, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱38.2M | 2% | Medium risk52 | —-0.008 |
| 41 | 25AD0030CONSTRUCTION OF MULTI-PURPOSE BUILDING, ALILEM, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 9% | Medium risk52 | —-0.015 |
| 42 | 24AD0033CONSTRUCTION OF SUYO MULTI-PURPOSE BUILDING, SUYO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.6M | 100% | Medium risk52 | —-0.083 |
| 43 | 23AD0024CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CANDON SPORTS AND CONVENTION CENTER INCLUDING FACILITIES), BARANGAY BAGANI- CAMPO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk52 | —-0.075 |
| 44 | 18A00031PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT CANDON-SALCEDO-DEL PILAR ROAD K0349+000-K0349+423, K0349+454-K0350+801, K0352+000-K0353+259, K0356+074-K0358+000, K0358+916-K0360+336, ILOCOS SUR | Region I | Region I | Completed | ₱73.4M | 100% | Medium risk51 | —-0.075 |
| 45 | 22AD0116CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PALACAPAC, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.5M | 100% | Medium risk51 | —-0.075 |
| 46 | 22AD0051CONSTRUCTION OF EVACUATION CENTER, BARANGAY RUBIO, GALIMUYOD, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | Medium risk51 | —-0.083 |
| 47 | 24AD0058CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 2, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱19.8M | 87% | Medium risk51 | —-0.034 |
| 48 | 24AD0056CONSTRUCTION OF SANTIAGO MULTIPURPOSE BUILDING, SANTIAGO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 100% | Medium risk51 | —-0.046 |
| 49 | 25AD0039CONSTRUCTION OF MULTI-PURPOSE BUILDING, CANDON CITY ARENA, BARANGAY BAGANI CAMPO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱19.2M | 36% | Medium risk51 | —-0.023 |
| 50 | 25AD0038CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CANDON CITY ARENA), BARANGAY BAGANI CAMPO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.6M | 33% | Medium risk51 | —-0.024 |