Opening the dossier…
Opening the dossier…
Contractor dossier
322 projects on file, including joint ventures this contractor is part of.
Total projects
322
Total budget
₱20B
Average progress
89.9%
Completion rate
78.9%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
20
6.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 188 | ₱12.7B | 50.5 | 13 | 86.9% |
| National Capital Region | 120 | ₱6.2B | 48.8 | 7 | 93.4% |
| Region IV-A | 11 | ₱846.4M | 58.6 | 0 | 98.5% |
| Region I | 3 | ₱185M | 52.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 162 | ₱10.4B | 52.5 | 11 | 91.2% |
| Roads | 78 | ₱4.7B | 45.5 | 0 | 88.7% |
| Buildings and Facilities | 46 | ₱2.8B | 45.3 | 5 | 85.9% |
| OTHER | 18 | ₱1B | 58.2 | 2 | 93.3% |
| Bridges | 12 | ₱633.3M | 42.4 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱191.3M | 95.0 | 2 | 54.1% |
| Bridges, Roads | 2 | ₱260.5M | 54.5 | 0 | 65.0% |
| GAA 2025 OO-1 | 1 | ₱7.6M | 86.0 | 0 | 85.5% |
| GAA 2025 OO-2 | 1 | ₱15M | 79.1 | 0 | 85.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 25C00034ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱7.6M | 85% | High risk86 | —-0.010 |
| 25C00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK (PHASE 11), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.3M | 61% | High risk81 | —-0.010 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 24C00085CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRAS. PROG.-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM),PHASE 13,BARANGAY BARDIAS,SAN MIGUEL,BULACAN | Region III | Region III | On-Going | ₱97.5M | 39% | High risk80 | —-0.001 |
| 25CP0145CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13) | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 28% | High risk80 | —-0.003 |
| 24C00088FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER, BARANGAY AKLE, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0049CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MANATAL, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CJ0108CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG RIO CHICO AT PRIS SDC, VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱15M | 86% | High risk79 | —-0.020 |
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CP0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III,SITIO PELON,BRGY. CAMACHI | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0079CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE IV, SITIO PELON, BRGY. CAMACHILE | Region III | Bulacan 3rd DEO | On-Going | ₱142.4M | 31% | High risk77 | —-0.007 |
| 25CP0065CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST.OF ROAD, PHASE I, SITIO PELON, BARANGAY CAMACH | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 39% | High risk77 | —-0.010 |
| 25CP0071CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO PELON, BARANGAY CAMAC | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 26% | High risk77 | —-0.004 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 24O00224ESTABLISHMENT OF THE DOST-NCR SCIENCE AND TECHNOLOGY RESOURCE AND INCUBATION CENTER (STRIC) | National Capital Region | National Capital Region | On-Going | ₱140.4M | 0% | High risk64 | Flagged0.038 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 24OD0322CONSTRUCTION OF FLOOD CONTROL WALL ALONG DULONG TANGKE CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 60% | High risk74 | Flagged0.032 |
| 24OD0321CONSTRUCTION OF FLOOD CONTROL WALL ALONG MALINTA CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 67% | High risk73 | Flagged0.031 |
| 24CJ0405CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 5), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 72% | High risk70 | Flagged0.027 |
| 24OE0184CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN G. SANTIAGO ELEMENTARY SCHOOL, BARANGAY 646, SAN MIGUEL, MANILA | National Capital Region | North Manila DEO | On-Going | ₱39M | 20% | Medium risk49 | Flagged0.019 |
| 24C00013NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD (PACKAGE 2), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱96.5M | 65% | High risk74 | Flagged0.012 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 24CC0393CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, SITIO DULO, BARANGAY CANALATE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 0% | High risk76 | Flagged0.006 |
| 24CC0558CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTA ELENA (PUMPING STATION NO. 2), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱86.8M | 0% | High risk76 | Flagged0.006 |
| 22O00100CONSTRUCTION OF PUBLIC ATTORNEY'S OFFICE (PAO) BUILDING, PHASE II, COMMONWEALTH AVENUE, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱289.5M | 30% | High risk65 | Flagged0.005 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 20O00012CONSTRUCTION OF HHSG PA ADMINISTRATION BUILDING PHASE I WITH PARKING AND GROUND DEVELOPMENT, FORT ANDRES BONIFACIO, TAGUIG CITY | National Capital Region | National Capital Region | On-Going | ₱335.3M | 87% | High risk65 | Flagged0.002 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24O00051CONSTRUCTION OF PUBLIC ATTORNEYS OFFICE (PAO) BUILDING, PHASE IV, COMMONWEALTH, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱238.6M | 0% | High risk65 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 24CJ0036CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MASALASA CREEK, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱50M | 100% | Medium risk32 | —-0.089 |
| 277 | 22CD0177CONSTRUCTION OF ROAD GOING TO DAANG MAHARLIKA HIGHWAY, BRGY. CALAWITAN SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱14.5M | 100% | Medium risk32 | —-0.104 |
| 278 | 18CD0016CONSTRUCTION OF DIKE ALONG ANGAT RIVER AT MATICTIC, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱37.2M | 100% | Medium risk32 | —-0.094 |
| 279 | 22CJ0142SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF ROAD SAFETY DEVICES AND SOLAR LED STREET LIGHTS ALONG MONCADA-ANAO RD, ANAO-RAMOS RD, AND RAMOS PURA RD | Region III | Tarlac DEO | Completed | ₱19.3M | 100% | Medium risk32 | —-0.102 |
| 280 | 20CD0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG ANGAT RIVER, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱36.4M | 100% | Medium risk32 | —-0.094 |
| 281 | 20CD0172CONSTRUCTION OF 4 STOREY 8 CLASSROOM FVR PHASE 3 ELEMENTARY SCHOOL, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.5M | 100% | Medium risk31 | —-0.046 |
| 282 | 19CD0119CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER, STO. CRISTO, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱34.2M | 100% | Medium risk31 | —-0.094 |
| 283 | 18CD0196REHABILITATION/RECONSTRUCTION OF ROADS, MASALIPIT, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱30.4M | 100% | Medium risk31 | —-0.093 |
| 284 | 25CJ0034REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD - K0138 + 517 - K0139 + 000 | Region III | Tarlac DEO | Completed | ₱8.6M | 100% | Medium risk31 | —-0.100 |
| 285 | 18CD0195REHABILITATION/RECONSTRUCTION OF ROADS, MAGMARALE, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱33.5M | 100% | Medium risk31 | —-0.093 |
| 286 | 20CD0173CONSTRUCTION OF 2 STOREY 10 CLASSROOM NORZAGARAY ELEMENTARY SCHOOL, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.5M | 100% | Medium risk31 | —-0.047 |
| 287 | 21C00040CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO RAILWAY STATION (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM KATUPARAN), MALOLOS PNR ROAD LEADING TO MALOLOS STATION, MALOLOS, BULACAN | Region III | Region III | Completed | ₱5.1M | 100% | Medium risk31 | —-0.104 |
| 288 | 20CD0169CONSTRUCTION OF 2 STOREY - 10 CLASSROOM MATIAS A. FERNANDO MS (ANGAT C/S), ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.5M | 100% | Medium risk31 | —-0.047 |
| 289 | 18CD0009CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG BULO RIVER (PHASE III), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.4M | 100% | Medium risk30 | —-0.093 |
| 290 | 18CD0010CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG BULO RIVER (PHASE IV), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.4M | 100% | Medium risk30 | —-0.093 |
| 291 | 22CD0048CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG DAANG MAHARLIKA ROAD AT TIGPALAS CREEK, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱38.6M | 100% | Medium risk30 | —-0.085 |
| 292 | 20CD0011CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (KING KABAYO SECTION) PHASE VIII, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.9M | 100% | Medium risk30 | —-0.093 |
| 293 | 18CD0192REHABILITATION/RECONSTRUCTION OF ROAD, BATASANG BATA, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱12.7M | 100% | Medium risk30 | —-0.094 |
| 294 | 18CD0011CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG SAN MIGUEL RIVER (PHASE III), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.4M | 100% | Medium risk30 | —-0.093 |
| 295 | 21CD0062CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (SALACOT SECTION) BARANGAY SALACOT, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | Medium risk30 | —-0.093 |
| 296 | 19CD0325CONSTRUCTION OF 2-STOREY, 10-CLASSROOM SCHOOL BUILDING T.P. POLICARPIO ES (MINUYAN ES), NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱27.7M | 100% | Medium risk30 | —-0.048 |
| 297 | 18CD0182CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT MAASIM RIVER, SAN RAFAEL, BULACAN PHASE 2 | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | Medium risk30 | —-0.093 |
| 298 | 22CK0120CONSTRUCTION OF CLASSROOMS: FOUR (4) STOREY, TWENTY (20) CLASSROOM SCHOOL BUILDING AT BENIGNO S. AQUINO NATIONAL HIGH SCHOOL, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱47.3M | 100% | Medium risk30 | —-0.038 |
| 299 | 18CD0012CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES ALONG SAN MIGUEL RIVER (PHASE IV), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.3M | 100% | Medium risk30 | —-0.093 |
| 300 | 19CD0332CONSTRUCTION OF 2-STOREY, 8-CLASSROOM SCHOOL BUILDING SAN MATEO ELEMENTARY SCHOOL, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱20.3M | 100% | Medium risk30 | —-0.049 |