Contractor dossier
322 projects on file, including joint ventures this contractor is part of.
Total projects
322
Total budget
₱20B
Average progress
89.9%
Completion rate
78.9%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
20
6.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 188 | ₱12.7B | 50.5 | 13 | 86.9% |
| National Capital Region | 120 | ₱6.2B | 48.8 | 7 | 93.4% |
| Region IV-A | 11 | ₱846.4M | 58.6 | 0 | 98.5% |
| Region I | 3 | ₱185M | 52.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 162 | ₱10.4B | 52.5 | 11 | 91.2% |
| Roads | 78 | ₱4.7B | 45.5 | 0 | 88.7% |
| Buildings and Facilities | 46 | ₱2.8B | 45.3 | 5 | 85.9% |
| OTHER | 18 | ₱1B | 58.2 | 2 | 93.3% |
| Bridges | 12 | ₱633.3M | 42.4 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱191.3M | 95.0 | 2 | 54.1% |
| Bridges, Roads | 2 | ₱260.5M | 54.5 | 0 | 65.0% |
| GAA 2025 OO-1 | 1 | ₱7.6M | 86.0 | 0 | 85.5% |
| GAA 2025 OO-2 | 1 | ₱15M | 79.1 | 0 | 85.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 25C00034ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱7.6M | 85% | High risk86 | —-0.010 |
| 25C00363SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK (PHASE 11), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱95.3M | 61% | High risk81 | —-0.010 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 24C00085CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRAS. PROG.-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM),PHASE 13,BARANGAY BARDIAS,SAN MIGUEL,BULACAN | Region III | Region III | On-Going | ₱97.5M | 39% | High risk80 | —-0.001 |
| 25CP0145CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13) | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 28% | High risk80 | —-0.003 |
| 24C00088FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAONG RIVER, BARANGAY AKLE, SAN ILDEFONSO, BULACAN | Region III | Region III | Completed | ₱96.5M | 100% | High risk80 | —-0.049 |
| 24CC0049CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MANATAL, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CJ0108CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG RIO CHICO AT PRIS SDC, VICTORIA, TARLAC | Region III | Tarlac DEO | On-Going | ₱15M | 86% | High risk79 | —-0.020 |
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CP0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III,SITIO PELON,BRGY. CAMACHI | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 25CP0079CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE IV, SITIO PELON, BRGY. CAMACHILE | Region III | Bulacan 3rd DEO | On-Going | ₱142.4M | 31% | High risk77 | —-0.007 |
| 25CP0065CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST.OF ROAD, PHASE I, SITIO PELON, BARANGAY CAMACH | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 39% | High risk77 | —-0.010 |
| 25CP0071CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO PELON, BARANGAY CAMAC | Region III | Bulacan 3rd DEO | On-Going | ₱142.6M | 26% | High risk77 | —-0.004 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22C00087CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE II), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱189.1M | 15% | High risk79 | Flagged0.050 |
| 24O00224ESTABLISHMENT OF THE DOST-NCR SCIENCE AND TECHNOLOGY RESOURCE AND INCUBATION CENTER (STRIC) | National Capital Region | National Capital Region | On-Going | ₱140.4M | 0% | High risk64 | Flagged0.038 |
| 24CC0642CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA-BOCAUE RIVER, BARANGAY IGULOT (PUROK 3), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 57% | High risk77 | Flagged0.036 |
| 25CJ0235CONSTRUCTION OF STA. IGNACIA - MAYANTOC DIVERSION ROAD (SEGMENT 1), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 18% | High risk95 | Flagged0.035 |
| 24OD0322CONSTRUCTION OF FLOOD CONTROL WALL ALONG DULONG TANGKE CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 60% | High risk74 | Flagged0.032 |
| 24OD0321CONSTRUCTION OF FLOOD CONTROL WALL ALONG MALINTA CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 67% | High risk73 | Flagged0.031 |
| 24CJ0405CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 5), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 72% | High risk70 | Flagged0.027 |
| 24OE0184CONSTRUCTION OF 3-STOREY 6-CLASSROOM SCHOOL BUILDING IN G. SANTIAGO ELEMENTARY SCHOOL, BARANGAY 646, SAN MIGUEL, MANILA | National Capital Region | North Manila DEO | On-Going | ₱39M | 20% | Medium risk49 | Flagged0.019 |
| 24C00013NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD (PACKAGE 2), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱96.5M | 65% | High risk74 | Flagged0.012 |
| 25C00005CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE, BRGY. MIJARES, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱142.6M | 18% | High risk78 | Flagged0.009 |
| 25CJ0213CONSTRUCTION OF BANK SLOPE ALONG MASALASA CREEK, TARLAC CITY, TARLAC (SEGMENT 42) | Region III | Tarlac DEO | On-Going | ₱95.8M | 90% | High risk94 | Flagged0.008 |
| 24CC0393CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, SITIO DULO, BARANGAY CANALATE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 0% | High risk76 | Flagged0.006 |
| 24CC0558CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION AND FLOOD GATE AT BARANGAY SANTA ELENA (PUMPING STATION NO. 2), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱86.8M | 0% | High risk76 | Flagged0.006 |
| 22O00100CONSTRUCTION OF PUBLIC ATTORNEY'S OFFICE (PAO) BUILDING, PHASE II, COMMONWEALTH AVENUE, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱289.5M | 30% | High risk65 | Flagged0.005 |
| 25CP0140CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12 | Region III | Bulacan 3rd DEO | On-Going | ₱97.4M | 0% | High risk80 | Flagged0.004 |
| 24C00079FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱142.6M | 62% | High risk81 | Flagged0.004 |
| 25CP0139CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11 | Region III | Bulacan 3rd DEO | On-Going | ₱97.5M | 6% | High risk80 | Flagged0.003 |
| 20O00012CONSTRUCTION OF HHSG PA ADMINISTRATION BUILDING PHASE I WITH PARKING AND GROUND DEVELOPMENT, FORT ANDRES BONIFACIO, TAGUIG CITY | National Capital Region | National Capital Region | On-Going | ₱335.3M | 87% | High risk65 | Flagged0.002 |
| 24C00090FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 30% | High risk81 | Flagged0.001 |
| 24O00051CONSTRUCTION OF PUBLIC ATTORNEYS OFFICE (PAO) BUILDING, PHASE IV, COMMONWEALTH, BATASAN HILLS, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱238.6M | 0% | High risk65 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24CC0176CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SANTO NIÑO (SITIO BUKID), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 100% | High risk76 | —-0.026 |
| 27 | 24CC0175CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SANTA LUCIA (PUROK 2 TO PUROK 3), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 71% | High risk76 | —-0.013 |
| 28 | 25CC0059CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY MATIMBO (PUROK BAOG), MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 61% | High risk76 | —-0.015 |
| 29 | 25CC0073CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG KALERO RIVER AND ITS TRIBUTARIES AT BARANGAY PANASAHAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 97% | High risk76 | —-0.031 |
| 30 | 24OD0322CONSTRUCTION OF FLOOD CONTROL WALL ALONG DULONG TANGKE CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 60% | High risk74 | Flagged0.032 |
| 31 | 24C00013NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN ILDEFONSO-SAN MIGUEL BYPASS ROAD (PACKAGE 2), PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱96.5M | 65% | High risk74 | Flagged0.012 |
| 32 | 24CC0155CONSTRUCTION OF CONCRETE SLOPE RIVER WALL ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱47.5M | 98% | High risk74 | —-0.028 |
| 33 | 24CC0427CONSTRUCTION OF CONCRETE SLOPE RIVER WALL ALONG ANGAT RIVER, BARANGAY TIAONG, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱49.5M | 100% | High risk74 | —-0.031 |
| 34 | 24CC0345CONSTRUCTION OF CONCRETE SLOPE RIVER WALL, BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱49.5M | 100% | High risk74 | —-0.030 |
| 35 | 25CP0042FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 2) | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 0% | High risk74 | —-0.005 |
| 36 | 25CP0041FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 1) | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 41% | High risk74 | —-0.016 |
| 37 | 25C00385SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER(DOWNSTREAM-BACK OF SALANGAN ES), BRGY. SALANGAN, SAN MIGUEL,BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 52% | High risk74 | —-0.017 |
| 38 | 25CP0043FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUGA-SALACOT CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL,BULACAN (UPSTREAM DIKE,PACKAGE 1) | Region III | Bulacan 3rd DEO | On-Going | ₱47.5M | 45% | High risk74 | —-0.017 |
| 39 | 25C00381SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANYATAM-MAPANIQUE CREEK (PHASE 12), SAN ILDEFONSO, BULACAN | Region III | Bulacan 3rd DEO | On-Going | ₱47.7M | 62% | High risk73 | —-0.018 |
| 40 | 19CD0228IMPROVEMENT / CONCRETING OF KALAWAKAN, DRT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94M | 100% | High risk73 | —-0.027 |
| 41 | 19CD0229IMPROVEMENT / CONCRETING OF ROADS SITIO DURUMUGAN, BRGY. KALAWAKAN, DRT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94M | 100% | High risk73 | —-0.027 |
| 42 | 18CD0301CONSTRUCTION/CONCRETING OF SAPANG PUTIK-BASUIT-GABIHAN ROAD, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱205.1M | 100% | High risk73 | —-0.009 |
| 43 | 24OD0321CONSTRUCTION OF FLOOD CONTROL WALL ALONG MALINTA CREEK, BARANGAY MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 67% | High risk73 | Flagged0.031 |
| 44 | 24CD0157CONSTRUCTION OF ROAD, BARANGAYS FRANCISCO HOMES YAKAL BARANGAY GUIJO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.3M | 100% | High risk73 | —-0.068 |
| 45 | 24CJ0405CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SUSUBAEN CREEK (SEGMENT 5), RAMOS, TARLAC | Region III | Tarlac DEO | On-Going | ₱99M | 72% | High risk70 | Flagged0.027 |
| 46 | 17CD0177CONSTRUCTION OF DIKE ALONG ANGAT RIVER AT MATICTIC, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱37.6M | 100% | High risk69 | —-0.063 |
| 47 | 25C00035ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF BULACAN | Region III | Region III | On-Going | ₱18.3M | 61% | High risk69 | —-0.028 |
| 48 | 24C00115NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SN MIGUEL-SIBUL RD, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱24.4M | 0% | High risk69 | —-0.015 |
| 49 | 24C00111NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING - TERTIARY ROADS-STA RITA-BIAK-NA-BATO VIA PULONG BAYABAS RD, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱44.7M | 100% | High risk69 | —-0.042 |
| 50 | 17CD0004CONSTRUCTION OF FLOOD CONTROL STRUCTURES ILOG BAYAN RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | High risk69 | —-0.062 |